1600103 NMNH Upgrade Sanitary and Storm System Bid Sch.xlsx
XLSX spreadsheet 36 KB Posted
- Solicitation number
- 33330226RF0010002
- Issued by
-
Smithsonian Institution
About this file
This is a blank bid schedule template for the Upgrade Sanitary & Storm Systems project at the National Museum of Natural History (NMNH), Project Number 1600103, prepared for Smithsonian Institution Facility. The bid schedule is structured to capture pricing for a base bid covering all work at the main building and three optional bid items: Option 1 for West Wing upgrades, Option 2 for East Wing upgrades, and Option 3 for roof scupper epoxy repairs in the main building attic. Each bid section requires contractors to itemize costs across material, labor, equipment, and overhead & profit categories distributed across 31 construction divisions (General Conditions, Existing Conditions, Concrete, Masonry, Metals, Wood/Plastics/Composites, Thermal & Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Conveying Systems, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety & Security, Earthwork, Exterior Improvements, and Utilities). All work references specifications and drawings dated December 5, 2025.
The template includes subtotal lines and performance bond requirements for each bid section, with all line items currently blank awaiting contractor input. Bidders are expected to complete cost proposals for the base bid covering the main building sanitary and stormwater system upgrade, with the option to bid on additional work for the West Wing, East Wing, and roof scupper repairs. This pricing template is part of a larger solicitation (33330226RF0010002) for a fixed-price construction contract where the Smithsonian Institution estimates the total project cost will exceed $10 million.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank bid summary
| Title : | Upgrade Sanitary & Storm Systems | Prepared by : |
| Facility : | NMNH | Date : |
| Project Number : | 1600103 | Company: |
| Base Bid | |||||
| BASE BID: MAIN BUILDING - All work associated with upgrading the sanitary & storm system at NMNH per the specifications and drawings dated December 5, 2025. | |||||
| Description | Material | Labor | Equipment | Overhead & Profit | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
BASE BID SUBTOTAL
Performance Bond
Total
| BASE BIDTotal | ||
| Title : | Upgrade Sanitary & Storm Systems | Prepared by : |
| Facility : | NMNH | Date : |
| Project Number : | 1600103 | Company: |
| OPTION 1 | |||||
| OPTION 1 : WEST WING - All work associated with upgrading the sanitary & storm system at NMNH per the specifications and drawings dated December 5, 2025. | |||||
| Description | Material | Labor | Equipment | Overhead & Profit | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
OPTION 1 SUBTOTAL
Performance Bond
Total
| OPTION 1Total | ||
| Title : | Upgrade Sanitary & Storm Systems | Prepared by : |
| Facility : | NMNH | Date : |
| Project Number : | 1600103 | Company: |
| OPTION 2 | |||||
| OPTION 2 : EAST WING - All work associated with upgrading the sanitary & storm system at NMNH per the specifications and drawings dated December 5, 2025. | |||||
| Description | Material | Labor | Equipment | Overhead & Profit | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
OPTION 2 SUBTOTAL
Performance Bond
Total
| OPTION 2 Total | ||
| Title : | Upgrade Sanitary & Storm Systems | Prepared by : |
| Facility : | NMNH | Date : |
| Project Number : | 1600103 | Company: |
| OPTION 3 | |||||
| OPTION 3 : ROOF SCUPPER REPAIR - All work associated with expoxy repairs post storm piping intallation in the main building attic at NMNH per the specifications and drawings dated December 5, 2025. | |||||
| Description | Material | Labor | Equipment | Overhead & Profit | Total |
| Div. 1 General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 2 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| HAZMAT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 3 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 4 Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 5 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 6 Wood, Plastics and Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 7 Thermal and Moisture Prot. | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 8 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 9 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 10 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 11. Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 12 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 13 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 14 Conveying Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 21 Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 22 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 23 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 26 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 27 Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 28 Electronic Safety & Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 31. Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 32 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Div. 33 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
OPTION 3 SUBTOTAL
Performance Bond
Total
OPTION 3 Total
B-&P
Sheet1
File details come from the government source that posted it. Updated .