This file is a Bid Set Issuance document containing architectural and engineering construction drawings for a federal contract project. The project involves an upgrade to sanitary and storm systems at the National Museum of Natural History, located at 10th Street & Constitution Avenue NW, Washington, DC 20560. The Smithsonian Institution is the federal agency involved. The project is identified as Smithsonian Facilities Project Number 1600103, with EwingCole serving as the Architect/Engineer (Project Number 20190809). The bid set was issued on December 5, 2025, with a submission date of December 1, 2025.
The drawing set comprises three volumes totaling 533 sheets covering multiple disciplines: General, Hazmat, Civil, Architectural, Interiors, Structural, HVAC, Plumbing, Electrical, Fire Protection, and Fire Alarm systems. Volume 3 specifically addresses Electrical, Fire Protection, and Fire Alarm work across the main building (including Rotunda, North Hall, East Hall, West Hall, East Range, and West Range), East Wing, West Wing, and East Court areas. The project scope includes demolition and renovation of restrooms, pantries, and miscellaneous areas throughout the museum building, with work phased across multiple construction phases. Design disciplines include Dewberry (Civil Engineering), EwingCole (Architects/Engineers), Dharam Consulting (Cost Estimators), and Froehling & Robertson, Inc. (Environmental Services). The construction logistics notes require all electrical work affecting occupied areas to be performed outside normal museum operating hours, with temporary power provisions and coordination of shutdowns with the Contracting Officer Technical Representative.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
pãáíÜëçåá~å=c~ÅáäáíáÉë= SMM=j~êóä~åÇ=^îÉåìÉ=pKtK=pìáíÉ=RMMN t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå
SHEET NO.
OF
DRAWING TITLE
WORKING STAFF
VICINITY MAP LOCATION MAP
STAMP 3 STAMP 4
STAMP 1 STAMP 2
OPS:
OSHEM:
DM:
DESIGN CHIEF:
OFM&R:
OPPM:
APPROVAL BLOCK
SMITHSONIAN FACILITIES
THIS PROJECT IS APPROVED AS
BEING IN CONFORMANCE WITH
THE APPLICABLE PROVISIONS OF
SMITHSONIAN INSTITUTION
DIRECTIVE 410.
R.E.:
clo= `lkpqor`qflk
REVISION # DATE REVISION DESCRIPTION
DRAWN BY CHECKED BYDESIGNED BY
Federal Reserve Bank Building
100 N. 6th Street
Philadelphia, PA 19106
Tel: 215-923-2020
Fax: 215-574-9163
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
SF PROJECT NUMBER
TYPE SEQUENCEDISCIPLINE
rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp
DATE SUBMISSION
kjke
:5 :4
A
M COVER SHEET
G C S
B Y
A p p ro v e r
B
ID
S E T
IS
S U A N C E
BID SET ISSUANCE
PP/BK TVPP/BK
20190809
UPGRADE SANITARY AND STORM
SYSTEMS
NATIONAL MUSEUM OF NATURAL
HISTORY
10TH STREET & CONSTITUTION
AVE, WASHINGTON DC, 20560
1600103
G-001CS
12/05/25 BID SET ISSUANCE
1 533
UPGRADE SANITARY AND STORM SYSTEMS
NATIONAL MUSEUM OF NATURAL HISTORY
10TH ST. & CONSTITUTION AVE. NW
WASHINGTON, DC 20560
SMITHSONIAN FACILITIES PROJECT NUMBER: 1600103
EWINGCOLE PROJECT NUMBER: 20190809
Architects, Engineers & Interior Designers EwingCole Federal Reserve Bank Building 100 N. 6th Street Philadelphia, PA 19106 Tel: 215-923-2020 Fax: 215-574-9163
Cost Estimators Dharam Consulting 1719 Chestnut Street Philadelphia, PA 19103 Tel: 215-563-0525
BID SET ISSUANCE
SEE SHEET G-002SH, G-003SH, G-004SH FOR DRAWING INDEX
Source: Smithsonian Institution Archives Record Unit 79 Box 9 Folder 5
Civil Engineers Dewberry 8401 Arlington Blvd, Fairfax, VA 22031 Tel: 703-849-0100
Environmental Services Froehling & Robertson, Inc.
1734 Seibel Drive, NE Roanoke, VA 24012 Tel: 540-344-7939
LECTRICAL FIRE
PROTECTION
12/3/2025
12/4/2025
12/4/2025
VOLUME #3 - ELECTRICAL, FIRE PROTECTION, FIRE ALARM
OPS:
OSHEM:
DM:
DESIGN CHIEF:
OFM&R:
OPPM:
APPROVAL BLOCK
SMITHSONIAN FACILITIES
THIS PROJECT IS APPROVED AS
BEING IN CONFORMANCE WITH
THE APPLICABLE PROVISIONS OF
SMITHSONIAN INSTITUTION
DIRECTIVE 410.
R.E.:
12/9/2025
12/9/202
12/09/2025
Josh Shaw 12/11/2025
12/18/25
12/9/2025
01/14/2026 t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
SF PROJECT NUMBER
DRAWING TITLE
WORKING STAFF
STAMP
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
A
B
C
D
E
F
G
H
J
K
REVISION # DATE REVISION DESCRIPTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
Federal Reserve Bank Building
100 N. 6th Street
Philadelphia, PA 19106
Tel: 215-923-2020
Fax: 215-574-9163 kjke rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp clo= `lkpqor`qflk
:4 :1
P
M DRAWING LIST - VOLUME #1
20190809
UPGRADE SANITARY AND STORM
SYSTEMS
12/05/25 BID SET ISSUANCE
G S H
B Y
A p p ro v e r
B
ID
S E T
IS
S U A N C
E NATIONAL MUSEUM OF NATURAL
HISTORY
10TH STREET & CONSTITUTION
AVE, WASHINGTON DC, 20560
1600103
PP/BK TVPP/BK
G-002SH
2 533
Sheet
Number Sheet Name
00 - General
G-001CS COVER SHEET
G-002SH DRAWING LIST - VOLUME #1
G-003SH DRAWING LIST - VOLUME #2
G-004SH DRAWING LIST - VOLUME #3
G-005SH PROJECT DATA
G-006SH CODE STUDY
G-007SH MOUNTING HEIGHTS & CLEARANCES
G-100 CONSTRUCTION LOGISTICS SUGGESTED PHASING PLAN
G-101 CONSTRUCTION LOGISTICS STAGING PLANS
G-102 CONSTRUCTION LOGISTICS PLANS - ACCESS HATCHES
G-103 CONSTRUCTION LOGISTICS PLANS - MAIN BUILDING
G-104 CONSTRUCTION LOGISTICS PLANS - MAIN BUILDING
G-105 CONSTRUCTION LOGISTICS PLANS - EAST WING
G-106 CONSTRUCTION LOGISTICS PLANS - WEST WING
01 - Hazmat
H-100 HAZARDOUS MATERIALS LOGISTICS
H-101 HAZARDOUS MATERIALS ATTIC ABATEMENT PLAN
H-401 HAZARDOUS MATERIALS ABATEMENT PLANS
H-402 HAZARDOUS MATERIALS ABATEMENT PLANS
H-403 HAZARDOUS MATERIALS ABATEMENT PLANS
H-404 HAZARDOUS MATERIALS ABATEMENT PLANS
02 - Civil
C-000 COVER SHEET
C-100 DEMOLITION AND RESTORATION - AREA 1
C-101 DEMOLITION AND RESTORATION - AREA 2&3
C-102 DEMOLITION AND RESTORATION - AREA 4
C-103 DEMOLITION AND RESTORATION - AREA 5
C-104 DEMOLITION AND RESTORATION - AREA 6
C-105 DEMOLITION AND RESTORATION - AREA 7
C-106 UTILITY PLAN - AREA 1
C-107 UTILITY PLAN - AREA 2&3
C-108 UTILITY PLAN - AREA 4
C-109 UTILITY PLAN - AREA 5
C-110 UTILITY PLAN - AREA 6
C-111 UTILITY PLAN - AREA 7
C-112 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 1
C-113 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 2&3
C-114 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 4
C-115 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 5
C-116 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 6
C-117 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 7
C-118 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 1
C-119 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 2&3
C-120 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 4
C-121 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 5
C-122 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 6
C-123 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 7
C-124 STORM DRAIN PROFILES
C-125 STORM DRAIN PROFILES
C-501 EROSION & SEDIMENT CONTROL
C-500 SITE DETAILS
C-502 EROSION & SEDIMENT CONTROL
C-503 EROSION & SEDIMENT CONTROL
C-504 EROSION & SEDIMENT CONTROL
C-505 EROSION & SEDIMENT CONTROL
04 - Architectural
A-100FP A-BASEMENT - REFERENCE PLAN
A-101FP B-GROUND FLOOR - REFERENCE PLAN
A-102FP C-GROUND FLOOR MEZZANINE - REFERENCE PLAN
A-103FP D-FIRST FLOOR - REFERENCE PLAN
A-104FP E-FIRST FLOOR MEZZANINE - REFERENCE PLAN
A-105FP F-SECOND FLOOR - REFERENCE PLAN
A-106FP G-SECOND FLOOR MEZZANINE - REFERENCE PLAN
A-107FP H-THIRD FLOOR - REFERENCE PLAN
A-108FP J-ATTIC AND PENTHOUSE - REFERENCE PLAN
A-109FP K-MECHANICAL AND ROOF- REFERENCE PLAN
A-401DP ENLARGED DEMOLITION PLANS - GROUND FLOOR - MAIN BUILDING - NORTH HALL - RESTROOMS
A-401EP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - RESTROOMS
A-401CP REFLECTED CEILING PLANS - MAIN BUILDING - NORTH HALL - RESTROOMS
A-401IE INTERIOR ELEVATIONS - MAIN BUILDING - NORTH HALL - RESTROOMS
A-402EP ENLARGED PLANS - MAIN BUILDING - WEST HALL - GROUND FLOOR - RESTROOMS
A-402IE INTERIOR ELEVATIONS - MAIN BUILDING - WEST HALL - GROUND FLOOR - RESTROOMS
A-403EP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - 3RD FLOOR - WOMENS RESTROOM
A-404EP ENLARGED PLANS - MAIN BUILDING - EAST RANGE - 3RD FLOOR - RESTROOM
A-405EP ENLARGED PLANS - MAIN BUILDING - EAST RANGE - 3RD FLOOR - ROSE ROOM PANTRY
A-406EP ENLARGED PLANS - MAIN BUILDING - EAST HALL - 3RD FLOOR - PANTRY
A-407EP ENLARGED PLANS - EAST WING DASH - 1ST FLOOR - RESTROOMS
A-407IE INTERIOR ELEVATIONS - EAST WING DASH - 1ST FLOOR - RESTROOMS
A-408EP ENLARGED PLANS - EAST WING - 1ST FLOOR - RESTROOMS
A-408IE INTERIOR ELEVATIONS - EAST WING - 1ST FLOOR - RESTROOMS
A-409EP ENLARGED PLANS - EAST WING DASH - 2ND FLOOR - RESTROOMS
A-409IE INTERIOR ELEVATIONS - EAST WING DASH - 2ND FLOOR - RESTROOMS
A-410EP ENLARGED PLANS - EAST WING - 2ND FLOOR - RESTROOMS
A-410IE INTERIOR ELEVATIONS - EAST WING - 2ND FLOOR - RESTROOMS
A-411EP ENLARGED PLANS - EAST WING DASH - 3RD FLOOR - RESTROOMS
A-411IE INTERIOR ELEVATIONS - EAST WING DASH - 3RD FLOOR - RESTROOMS
A-412EP ENLARGED PLANS - EAST WING - 3RD FLOOR - RESTROOMS
A-412IE INTERIOR ELEVATIONS - EAST WING - 3RD FLOOR - RESTROOMS
A-413EP ENLARGED PLANS - EAST WING DASH - 4TH FLOOR - RESTROOMS
A-413IE INTERIOR ELEVATIONS - EAST WING DASH - 4TH FLOOR - RESTROOMS
A-414EP ENLARGED PLANS - EAST WING - 4TH FLOOR - RESTROOM
A-414IE INTERIOR ELEVATIONS - EAST WING - 4TH FLOOR - RESTROOM
A-415EP ENLARGED PLANS - EAST WING DASH - 5TH FLOOR - RESTROOMS
A-415IE INTERIOR ELEVATIONS - EAST WING DASH - 5TH FLOOR - RESTROOMS
A-416EP ENLARGED PLANS - EAST WING - 5TH FLOOR - RESTROOMS
A-416IE INTERIOR ELEVATIONS - EAST WING - 5TH FLOOR - RESTROOMS
A-417EP ENLARGED PLANS - EAST WING DASH - 6TH FLOOR - RESTROOMS
A-417IE INTERIOR ELEVATIONS - EAST WING DASH - 6TH FLOOR - RESTROOMS
A-418EP ENLARGED PLANS - WEST WING DASH - 3RD FLOOR - RESTROOMS
A-418IE INTERIOR ELEVATIONS - WEST WING DASH - 3RD FLOOR - RESTROOMS
A-419EP ENLARGED PLANS - WEST WING - 3RD FLOOR - RESTROOMS
A-419IE INTERIOR ELEVATIONS - WEST WING - 3RD FLOOR - RESTROOMS
A-420EP ENLARGED PLANS - WEST WING DASH - 4TH FLOOR - RESTROOMS
A-420IE INTERIOR ELEVATIONS - WEST WING DASH - 4TH FLOOR - RESTROOMS
A-421EP ENLARGED PLANS - WEST WING - 4TH FLOOR - RESTROOMS
Sheet
Number Sheet Name
A-421IE INTERIOR ELEVATIONS - WEST WING - 4TH FLOOR - RESTROOMS
A-422EP ENLARGED PLANS - WEST WING DASH - 5TH FLOOR - RESTROOMS
A-422IE INTERIOR ELEVATIONS - WEST WING DASH - 5TH FLOOR - RESTROOMS
A-423EP ENLARGED PLANS - WEST WING - 5TH FLOOR - RESTROOMS
A-423IE INTERIOR ELEVATIONS - WEST WING - 5TH FLOOR - RESTROOMS
A-424EP ENLARGED PLANS -WEST WING DASH - 6TH FLOOR - RESTROOMS
A-424IE INTERIOR ELEVATIONS -WEST WING DASH - 6TH FLOOR - RESTROOMS
A-425EP ENLARGED PLANS - EAST COURT - 2ND FLOOR - RESTROOM
A-426EP ENLARGED PLANS - MISCELLANEOUS AREAS
A-501DT PARTITION DETAILS
A-502DT PARTITION DETAILS
A-503DT PLAN DETAILS
A-504DT CASEWORK DETAILS
A-505DT CASEWORK DETAILS
A-506DT DOOR DETAILS
A-507DT CEILING DETAILS
05 - Interiors
I-001SH GENERAL FINISH NOTES & INTERIOR FINISH SCHEDULE 1 OF 2
I-002SH INTERIOR FINISH SCHEDULE 2 OF 2
I-003SH INTERIOR FINISH & TRANSITION DETAILS
I-401NP FINISH PLANS - MAIN BUILDING - RESTROOMS
I-402NP FINISH PLANS - MAIN BUILDING - PANTRIES, MISCELLANEOUS AREAS & EAST COURT RESTROOM
I-403NP FINISH PLANS - EAST WING - RESTROOMS
I-404NP FINISH PLANS - EAST WING DASH - RESTROOMS
I-405NP FINISH PLANS - WEST WING - RESTROOMS
I-406NP FINISH PLANS - WEST WING DASH - RESTROOMS
I-601NP FLOOR PATTERN PLANS - MAIN BUILDING - RESTROOMS AND PANTRIES
I-602NP FLOOR PATTERN PLANS - EAST COURT, EAST WING AND EAST WING DASH - RESTROOMS
I-603NP FLOOR PATTERN PLANS - WEST WING AND WEST WING DASH - RESTROOMS
I-601SH INTERIOR SIGNAGE - GENERAL NOTES, SIGNAGE SCHEDULE & DETAILS
I-601EP SIGNAGE LOCATION PLANS - MAIN BUILDING - RESTROOMS
I-602EP SIGNAGE LOCATION PLANS - MAIN BUILDING - PANTRIES & RESTROOM
I-603EP SIGNAGE LOCATION PLANS - EAST WING - RESTROOMS
I-604EP SIGNAGE LOCATION PLANS - EAST WING DASH - RESTROOMS
I-605EP SIGNAGE LOCATION PLANS - WEST WING - RESTROOMS
I-606EP SIGNAGE LOCATION PLANS - WEST WING DASH - RESTROOMS
06 - Structural
S-001 GENERAL STRUCTURAL NOTES & STRUCTURAL INDEX SHEET
S-002 GENERAL STRUCTURAL NOTES, DESIGN CRITERIA, & ABBREVIATIONS
S-100 FP GROUND FLOOR AND TUNNEL ACCESS REFERENCE PLAN
S-401 FP NORTH HALL RESTROOM ENLARGED PLANS
S-402 FP WEST HALL RESTROOM ENLARGED PLANS
S-403 FP 3RD FLOOR NORTH HALL RESTROOM ENLARGED PLANS
S-404 FP EAST WING DASH RESTROOMS ENLARGED PLANS
S-405 FP EAST WING RESTROOMS ENLARGED PLANS
S-406 FP WEST WING DASH RESTROOMS ENLARGED PLANS
S-407 FP WEST WING RESTROOMS ENLARGED PLANS
S-408 FP EAST COURT RESTROOMS ENLARGED PLANS
S-301 SC STRUCTURAL SECTIONS
S-501 DT TYPICAL STRUCTURAL DETAILS
07 - HVAC
M-001CS HVAC INDEX SHEET
M-002CS HVAC GENERAL NOTES
MD101DP DEMOLITION PLAN - MAIN BUILDING - EAST HALL ATTIC
MD102DP DEMOLITION PLAN - MAIN BUILDING - NORTH HALL - NORTH ATTIC
MD103DP DEMOLITION PLAN - MAIN BUILDING - NORTH HALL - SOUTH ATTIC
MD104DP DEMOLITION PLAN - MAIN BUILDING - WEST HALL - ATTIC
MH101HP MAIN BUILDING - EAST HALL - ATTIC DUCTWORK
MH102HP MAIN BUILDING - NORTH HALL - NORTH ATTIC DUCTWORK
MH103HP MAIN BUILDING - NORTH HALL - SOUTH ATTIC DUCTWORK
MH104HP MAIN BUILDING - WEST HALL - ATTIC DUCTWORK
MP101PP MAIN BUILDING - EAST HALL - ATTIC PIPING
M-401DP ENLARGED DEMOLITION PLANS - GROUND FLOOR - MAIN BUILDING - NORTH LOBBY
M-402EP ENLARGED PLANS - GROUND FLOOR - MAIN BUILDING - NORTH LOBBY
M-403EP ENLARGED PLANS - MAIN BUILDING
M-404EP ENLARGED PLANS - EAST WING - 1ST FLOOR
M-405EP ENLARGED PLANS - EAST WING - 2ND FLOOR
M-406EP ENLARGED PLANS - EAST WING - 3RD FLOOR
M-407EP ENLARGED PLANS - EAST WING - 4TH FLOOR
M-408EP ENLARGED PLANS - EAST WING - 5TH FLOOR
M-409EP ENLARGED PLANS - EAST WING DASH - 6TH FLOOR
M-410EP ENLARGED PLANS - WEST WING - 3RD FLOOR
M-411EP ENLARGED PLANS - WEST WING - 4TH FLOOR
M-412EP ENLARGED PLANS - WEST WING - 5TH FLOOR
M-413EP ENLARGED PLANS - WEST WING DASH - 6TH FLOOR
M-414EP ENLARGED PLANS - EAST COURT - 2ND FLOOR
M-501DT HVAC DETAILS
M-601SH HVAC SCHEDULES
M-801CP HVAC CONTROL DIAGRAMS
VOLUME #1 - GENERAL HAZMAT, CIVIL, ARCHITECTURAL, INTERIORS, STRUCTURAL, HVAC
t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
SF PROJECT NUMBER
DRAWING TITLE
WORKING STAFF
STAMP
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
A
B
C
D
E
F
G
H
J
K
REVISION # DATE REVISION DESCRIPTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
Federal Reserve Bank Building
100 N. 6th Street
Philadelphia, PA 19106
Tel: 215-923-2020
Fax: 215-574-9163 kjke rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp clo= `lkpqor`qflk
:4 :2
P
M DRAWING LIST - VOLUME #2
20190809
UPGRADE SANITARY AND STORM
SYSTEMS
12/05/25 BID SET ISSUANCE
G S H
B Y
A p p ro v e r
B
ID
S E T
IS
S U A N C
E NATIONAL MUSEUM OF NATURAL
HISTORY
10TH STREET & CONSTITUTION
AVE, WASHINGTON DC, 20560
1600103
PP/BK TVPP/BK
G-003SH
3 533
Sheet Number Sheet Name
PD-1WW3S WEST WING - THIRD FLOOR - SOUTH - DEMOLITION PLAN
PD-1WW4N WEST WING - FOURTH FLOOR - NORTH - DEMOLITION PLAN
PD-1WW4S WEST WING - FOURTH FLOOR - SOUTH - DEMOLITION PLAN
PD-1WW5N WEST WING - FIFTH FLOOR - NORTH - DEMOLITION PLAN
PD-1WW5S WEST WING - FIFTH FLOOR - SOUTH - DEMOLITION PLAN
PD-1WW6N WEST WING - SIXTH FLOOR - NORTH - DEMOLITION PLAN
PD-1WW6S WEST WING - SIXTH FLOOR - SOUTH - DEMOLITION PLAN
PD-1WWP WEST WING - PENTHOUSE - DEMOLITION PLAN
PD-1WWR WEST WING - ROOF - DEMOLITION PLAN
P-1ROT MAIN BUILDING - ROTUNDA - TUNNEL PLAN
P-1RO0 MAIN BUILDING - ROTUNDA - GROUND FLOOR PLAN
P-1RO0M MAIN BUILDING - ROTUNDA - GROUND FLOOR MEZZANINE PLAN
P-1RO1 MAIN BUILDING - ROTUNDA - FIRST FLOOR PLAN
P-1RO2 MAIN BUILDING - ROTUNDA - SECOND FLOOR PLAN
P-1RO3 MAIN BUILDING - ROTUNDA - THIRD FLOOR PLAN
P-1ROA MAIN BUILDING - ROTUNDA - ATTIC PLAN
P-1ROP MAIN BUILDING - ROTUNDA - PENTHOUSE PLAN
P-1ROR MAIN BUILDING - ROTUNDA - ROOF PLAN
P-1NHTN MAIN BUILDING - NORTH HALL - TUNNEL - NORTH - PLAN
P-1NHTS MAIN BUILDING - NORTH HALL - TUNNEL - SOUTH - PLAN
P-1NH0N MAIN BUILDING - NORTH HALL - GROUND FLOOR - NORTH - PLAN
P-1NH0S MAIN BUILDING - NORTH HALL - GROUND FLOOR - SOUTH - PLAN
P-1NH1N MAIN BUILDING - NORTH HALL - FIRST FLOOR - NORTH - PLAN
P-1NH1S MAIN BUILDING - NORTH HALL - FIRST FLOOR - SOUTH - PLAN
P-1NH2N MAIN BUILDING - NORTH HALL - SECOND FLOOR - NORTH - PLAN
P-1NH2S MAIN BUILDING - NORTH HALL - SECOND FLOOR - SOUTH - PLAN
P-1NH3N MAIN BUILDING - NORTH HALL - THIRD FLOOR - NORTH - PLAN
P-1NH3S MAIN BUILDING - NORTH HALL - THIRD FLOOR - SOUTH - PLAN
P-1NHAN MAIN BUILDING - NORTH HALL - ATTIC - NORTH - PLAN
P-1NHAS MAIN BUILDING - NORTH HALL - ATTIC - SOUTH - PLAN
P-1NHRN MAIN BUILDING - NORTH HALL - ROOF - NORTH - PLAN
P-1NHRS MAIN BUILDING - NORTH HALL - ROOF - SOUTH - PLAN
P-1EHT MAIN BUILDING - EAST HALL - TUNNEL PLAN
P-1EH0 MAIN BUILDING - EAST HALL - GROUND FLOOR PLAN
P-1EH0M MAIN BUILDING - EAST HALL - GROUND FLOOR MEZZANINE PLAN
P-1EH1 MAIN BUILDING - EAST HALL - FIRST FLOOR PLAN
P-1EH2 MAIN BUILDING - EAST HALL - SECOND FLOOR PLAN
P-1EH3 MAIN BUILDING - EAST HALL - THIRD FLOOR PLAN
P-1EHA MAIN BUILDING - EAST HALL - ATTIC PLAN
P-1EHR MAIN BUILDING - EAST HALL - ROOF PLAN
P-1WHT MAIN BUILDING - WEST HALL - TUNNEL PLAN
P-1WH0 MAIN BUILDING - WEST HALL - GROUND FLOOR PLAN
P-1WH0M MAIN BUILDING - WEST HALL - GROUND FLOOR MEZZANINE PLAN
P-1WH1 MAIN BUILDING - WEST HALL - FIRST FLOOR PLAN
P-1WH2 MAIN BUILDING - WEST HALL - SECOND FLOOR FLOOR PLAN
P-1WH3 MAIN BUILDING - WEST HALL - THIRD FLOOR PLAN
P-1WHA MAIN BUILDING - WEST HALL - ATTIC FLOOR PLAN
P-1WHR MAIN BUILDING - WEST HALL - ROOF PLAN
P-1ERTN MAIN BUILDING - EAST RANGE - TUNNEL - NORTH - PLAN
P-1ERTS MAIN BUILDING - EAST RANGE - TUNNEL - SOUTH - PLAN
P-1ER0N MAIN BUILDING - EAST RANGE - GROUND FLOOR - NORTH - PLAN
P-1ER0S MAIN BUILDING - EAST RANGE - GROUND FLOOR - SOUTH - PLAN
P-1ER0MN MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - NORTH - PLAN
P-1ER0MS MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - SOUTH - PLAN
P-1ER1N MAIN BUILDING - EAST RANGE - FIRST FLOOR - NORTH - PLAN
P-1ER1S MAIN BUILDING - EAST RANGE - FIRST FLOOR - SOUTH - PLAN
P-1ER2N MAIN BUILDING - EAST RANGE - SECOND FLOOR - NORTH - PLAN
P-1ER2S MAIN BUILDING - EAST RANGE - SECOND FLOOR - SOUTH - PLAN
P-1ER3N MAIN BUILDING - EAST RANGE - THIRD FLOOR - NORTH - PLAN
P-1ER3S MAIN BUILDING - EAST RANGE - THIRD FLOOR - SOUTH - PLAN
P-1ERAN MAIN BUILDING - EAST RANGE - ATTIC - NORTH - PLAN
P-1ERAS MAIN BUILDING - EAST RANGE - ATTIC - SOUTH - PLAN
P-1ERRN MAIN BUILDING - EAST RANGE - ROOF - NORTH - PLAN
P-1ERRS MAIN BUILDING - EAST RANGE - ROOF - SOUTH - PLAN
P-1WRTN MAIN BUILDING - WEST RANGE - TUNNEL - NORTH - PLAN
P-1WRTS MAIN BUILDING - WEST RANGE - TUNNEL - SOUTH - PLAN
P-1WR0N MAIN BUILDING - WEST RANGE - GROUND FLOOR - NORTH - PLAN
P-1WR0S MAIN BUILDING - WEST RANGE - GROUND FLOOR - SOUTH - PLAN
P-1WR0MN MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - NORTH - PLAN
P-1WR0MS MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - SOUTH - PLAN
P-1WR1N MAIN BUILDING - WEST RANGE - FIRST FLOOR - NORTH - PLAN
P-1WR1S MAIN BUILDING - WEST RANGE - FIRST FLOOR - SOUTH - PLAN
P-1WR2N MAIN BUILDING - WEST RANGE - SECOND FLOOR - NORTH - PLAN
P-1WR2S MAIN BUILDING - WEST RANGE - SECOND FLOOR - SOUTH - PLAN
P-1WR3N MAIN BUILDING - WEST RANGE - THIRD FLOOR - NORTH - PLAN
P-1WR3S MAIN BUILDING - WEST RANGE - THIRD FLOOR - SOUTH - PLAN
P-1WRAN MAIN BUILDING - WEST RANGE - ATTIC - NORTH - PLAN
P-1WRAS MAIN BUILDING - WEST RANGE - ATTIC - SOUTH - PLAN
P-1WRRN MAIN BUILDING - WEST RANGE - ROOF - NORTH - PLAN
P-1WRRS MAIN BUILDING - WEST RANGE - ROOF - SOUTH - PLAN
P-1EWBN EAST WING - BASEMENT - NORTH - PLAN
P-1EWBS EAST WING - BASEMENT - SOUTH - PLAN
P-1EW0N EAST WING - GROUND FLOOR - NORTH - PLAN
P-1EW0S EAST WING - GROUND FLOOR - SOUTH - PLAN
P-1EW1N EAST WING - FIRST FLOOR - NORTH - PLAN
P-1EW1S EAST WING - FIRST FLOOR - SOUTH - PLAN
P-1EW2N EAST WING - SECOND FLOOR - NORTH - PLAN
P-1EW2S EAST WING - SECOND FLOOR - SOUTH - PLAN
P-1EW3N EAST WING - THIRD FLOOR - NORTH - PLAN
P-1EW3S EAST WING - THIRD FLOOR - SOUTH - PLAN
P-1EW4N EAST WING - FOURTH FLOOR - NORTH - PLAN
P-1EW4S EAST WING - FOURTH FLOOR - SOUTH - PLAN
P-1EW5N EAST WING - FIFTH FLOOR - NORTH - PLAN
P-1EW5S EAST WING - FIFTH FLOOR - SOUTH - PLAN
P-1EW6N EAST WING - SIXTH FLOOR - NORTH - PLAN
P-1EW6S EAST WING - SIXTH FLOOR - SOUTH - PLAN
P-1EWP EAST WING - PENTHOUSE PLAN
P-1EWR EAST WING - ROOF PLAN
P-1WWBN WEST WING - BASEMENT - NORTH - PLAN
P-1WWBS WEST WING - BASEMENT - SOUTH - PLAN
P-1WW0N WEST WING - GROUND FLOOR - NORTH - PLAN
P-1WW0S WEST WING - GROUND FLOOR - SOUTH - PLAN
P-1WW1N WEST WING - FIRST FLOOR - NORTH - PLAN
P-1WW1S WEST WING - FIRST FLOOR - SOUTH - PLAN
P-1WW2N WEST WING - SECOND FLOOR - NORTH - PLAN
P-1WW2S WEST WING - SECOND FLOOR - SOUTH - PLAN
P-1WW3N WEST WING - THIRD FLOOR - NORTH - PLAN
P-1WW3S WEST WING - THIRD FLOOR - SOUTH - PLAN
P-1WW4N WEST WING - FOURTH FLOOR - NORTH - PLAN
P-1WW4S WEST WING - FOURTH FLOOR - SOUTH - PLAN
P-1WW5N WEST WING - FIFTH FLOOR - NORTH - PLAN
Sheet Number Sheet Name
P-1WW5S WEST WING - FIFTH FLOOR - SOUTH - PLAN
P-1WW6N WEST WING - SIXTH FLOOR - NORTH - PLAN
P-1WW6S WEST WING - SIXTH FLOOR - SOUTH - PLAN
P-1WWP WEST WING - PENTHOUSE PLAN
P-1WWR WEST WING - ROOF PLAN
P-500 PLUMBING DETAILS
P-501 PLUMBING SCHEDULES
P-502 PLUMBING SCHEDULES
P-503 PLUMBING PHASING DETAILS - EAST WING
P-504 PLUMBING PHASING DETAILS - EAST WING SINKS
P-505 PLUMBING DETAILS
P-506 PLUMBING DETAILS
P-6RO1 MAIN BUILDING - ROTUNDA - STORM RISER DIAGRAM
P-6RO2 MAIN BUILDING - ROTUNDA - SANITARY RISER DIAGRAM
P-6NH1 MAIN BUILDING - NORTH HALL - STORM RISER DIAGRAM
P-6NH2 MAIN BUILDING - NORTH HALL - SANITARY RISER DIAGRAM
P-6EH1 MAIN BUILDING - EAST HALL - STORM RISER DIAGRAM
P-6EH2 MAIN BUILDING - EAST HALL - SANITARY RISER DIAGRAM
P-6ER1 MAIN BUILDING - EAST RANGE - STORM RISER DIAGRAM
P-6ER2 MAIN BUILDING - EAST RANGE - SANITARY RISER DIAGRAM
P-6WH1 MAIN BUILDING - WEST HALL - STORM RISER DIAGRAM
P-6WH2 MAIN BUILDING - WEST HALL - SANITARY RISER DIAGRAM
P-6WR1 MAIN BUILDING - WEST RANGE - STORM RISER DIAGRAM
P-6WR2 MAIN BUILDING - WEST RANGE - SANITARY RISER DIAGRAM
P-6EW1 EAST WING - STORM RISER DIAGRAM
P-6EW2N EAST WING - SANITARY RISER DIAGRAM - NORTH
P-6EW2S EAST WING - SANITARY RISER DIAGRAM - SOUTH
P-6EW3N EAST WING - DOMESTIC WATER RISER DIAGRAM - NORTH
P-6EW3S EAST WING - DOMESTIC WATER RISER DIAGRAM - SOUTH
P-6EW4 EAST WING - SANITARY PARTIAL RISER DIAGRAMS - NEW RESTROOMS
P-6EW5 EAST WING - DOMESTIC WATER PARTIAL RISER DIAGRAMS - NEW RESTROOMS
P-6WW1 WEST WING - STORM RISER DIAGRAM
P-6WW2N WEST WING - SANITARY RISER DIAGRAM - NORTH
P-6WW2S WEST WING - SANITARY RISER DIAGRAM - SOUTH
P-6WW3N WEST WING - DOMESTIC WATER RISER DIAGRAM - NORTH
P-6WW3S WEST WING - DOMESTIC WATER RISER DIAGRAM - SOUTH
P-6WW4 WEST WING - SANITARY PARTIAL RISER DIAGRAMS - NEW RESTROOMS
P-6WW5 WEST WING - DOMESTIC WATER PARTIAL RISER DIAGRAMS - NEW RESTROOMS
P-6EC1 EAST COURT - STORM RISER DIAGRAM
P-6WC1 WEST COURT - STORM RISER DIAGRAM
VOLUME #2: PLUMBING
Sheet Number Sheet Name
08 - Plumbing
P-000 PLUMBING DRAWING INDEX
P-001 PLUMBING GENERAL NOTES
P-002 LOGISTICS AND PHASING - TYPICAL MAIN BUILDING STORM STACK OFFSET - SCENARIO 1
P-003 LOGISTICS AND PHASING - TYPICAL MAIN BUILDING STORM STACK OFFSET - SCENARIO 2
P-004 LOGISTICS AND PHASING - TYPICAL EXISTING COLLECTIONS AREAS STORM STACK
P-005 LOGISTICS AND PHASING - TYPICAL EAST WING TOILET ROOM STACK - PHASE 1-4
P-006 LOGISTICS AND PHASING - TYPICAL EAST WING TOILET ROOM STACK - PHASE 5-7
P-007 LOGISTICS AND PHASING - TYPICAL WEST WING TOILET ROOM STACK - PHASE 1-4
P-008 LOGISTICS AND PHASING - TYPICAL WEST WING TOILET ROOM STACK - PHASE 5
P-009 LOGISTICS AND PHASING - TYPICAL EAST WING EXISTING STAFF SINK WASTE STACK
P-010 LOGISTICS AND PHASING - TYPICAL WEST WING EXISTING STAFF SINK WASTE STACK
PD-1ROT MAIN BUILDING - ROTUNDA - TUNNEL - DEMOLITION PLAN
PD-1RO0 MAIN BUILDING - ROTUNDA - GROUND FLOOR - DEMOLITION PLAN
PD-1RO0M MAIN BUILDING - ROTUNDA - GROUND FLOOR MEZZANINE PLAN - DEMOLITION PLAN
PD-1RO1 MAIN BUILDING - ROTUNDA - FIRST FLOOR - DEMOLITION PLAN
PD-1RO2 MAIN BUILDING - ROTUNDA - SECOND FLOOR - DEMOLITION PLAN
PD-1RO3 MAIN BUILDING - ROTUNDA - THIRD FLOOR - DEMOLITION PLAN
PD-1ROA MAIN BUILDING - ROTUNDA - ATTIC - DEMOLITION PLAN
PD-1ROP MAIN BUILDING - ROTUNDA - PENTHOUSE - DEMOLITION PLAN
PD-1ROR MAIN BUILDING - ROTUNDA - ROOF - DEMOLITION PLAN
PD-1NHTN MAIN BUILDING - NORTH HALL - TUNNEL - NORTH - DEMOLITION PLAN
PD-1NHTS MAIN BUILDING - NORTH HALL - TUNNEL - SOUTH - DEMOLITION PLAN
PD-1NH0N MAIN BUILDING - NORTH HALL - GROUND FLOOR - NORTH - DEMOLITION PLAN
PD-1NH0S MAIN BUILDING - NORTH HALL - GROUND FLOOR - SOUTH - DEMOLITION PLAN
PD-1NH1N MAIN BUILDING - NORTH HALL - FIRST FLOOR - NORTH - DEMOLITION PLAN
PD-1NH1S MAIN BUILDING - NORTH HALL - FIRST FLOOR - SOUTH - DEMOLITION PLAN
PD-1NH2N MAIN BUILDING - NORTH HALL - SECOND FLOOR - NORTH - DEMOLITION PLAN
PD-1NH2S MAIN BUILDING - NORTH HALL - SECOND FLOOR - SOUTH - DEMOLITION PLAN
PD-1NH3N MAIN BUILDING - NORTH HALL - THIRD FLOOR - NORTH - DEMOLITION PLAN
PD-1NH3S MAIN BUILDING - NORTH HALL - THIRD FLOOR - SOUTH - DEMOLITION PLAN
PD-1NHAN MAIN BUILDING - NORTH HALL - ATTIC - NORTH - DEMOLITION PLAN
PD-1NHAS MAIN BUILDING - NORTH HALL - ATTIC - SOUTH - DEMOLITION PLAN
PD-1NHRN MAIN BUILDING - NORTH HALL - ROOF - NORTH - DEMOLITION PLAN
PD-1NHRS MAIN BUILDING - NORTH HALL - ROOF - SOUTH - DEMOLITION PLAN
PD-1EHT MAIN BUILDING - EAST HALL - TUNNEL - DEMOLITION PLAN
PD-1EH0 MAIN BUILDING - EAST HALL - GROUND FLOOR - DEMOLITION PLAN
PD-1EH0M MAIN BUILDING - EAST HALL - GROUND FLOOR MEZZANINE - DEMOLITION PLAN
PD-1EH1 MAIN BUILDING - EAST HALL - FIRST FLOOR - DEMOLITION PLAN
PD-1EH2 MAIN BUILDING - EAST HALL - SECOND FLOOR - DEMOLITION PLAN
PD-1EH3 MAIN BUILDING - EAST HALL - THIRD FLOOR - DEMOLITION PLAN
PD-1EHA MAIN BUILDING - EAST HALL - ATTIC - DEMOLITION PLAN
PD-1EHR MAIN BUILDING - EAST HALL - ROOF - DEMOLITION PLAN
PD-1ERTN MAIN BUILDING - EAST RANGE - TUNNEL - NORTH - DEMOLITION PLAN
PD-1ERTS MAIN BUILDING - EAST RANGE - TUNNEL - SOUTH - DEMOLITION PLAN
PD-1ER0N MAIN BUILDING - EAST RANGE - GROUND FLOOR - NORTH - DEMOLITION PLAN
PD-1ER0S MAIN BUILDING - EAST RANGE - GROUND FLOOR - SOUTH - DEMOLITION PLAN
PD-1ER0MN MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - NORTH - DEMOLITION PLAN
PD-1ER0MS MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - SOUTH - DEMOLITION PLAN
PD-1ER1N MAIN BUILDING - EAST RANGE - FIRST FLOOR - NORTH - DEMOLITION PLAN
PD-1ER1S MAIN BUILDING - EAST RANGE - FIRST FLOOR - SOUTH - DEMOLITION PLAN
PD-1ER2N MAIN BUILDING - EAST RANGE - SECOND FLOOR - NORTH - DEMOLITION PLAN
PD-1ER2S MAIN BUILDING - EAST RANGE - SECOND FLOOR - SOUTH - DEMOLITION PLAN
PD-1ER3N MAIN BUILDING - EAST RANGE - THIRD FLOOR - NORTH - DEMOLITION PLAN
PD-1ER3S MAIN BUILDING - EAST RANGE - THIRD FLOOR - SOUTH - DEMOLITION PLAN
PD-1ERAN MAIN BUILDING - EAST RANGE - ATTIC - NORTH - DEMOLITION PLAN
PD-1ERAS MAIN BUILDING - EAST RANGE - ATTIC - SOUTH - DEMOLITION PLAN
PD-1ERRN MAIN BUILDING - EAST RANGE - ROOF - NORTH - DEMOLITION PLAN
PD-1ERRS MAIN BUILDING - EAST RANGE - ROOF - SOUTH - DEMOLITION PLAN
PD-1WHT MAIN BUILDING - WEST HALL - TUNNEL - DEMOLITION PLAN
PD-1WH0 MAIN BUILDING - WEST HALL - GROUND FLOOR - DEMOLITION PLAN
PD-1WH0M MAIN BUILDING - WEST HALL - GROUND FLOOR MEZZANINE - DEMOLITION PLAN
PD-1WH1 MAIN BUILDING - WEST HALL - FIRST FLOOR - DEMOLITION PLAN
PD-1WH2 MAIN BUILDING - WEST HALL - SECOND FLOOR - DEMOLITION PLAN
PD-1WH3 MAIN BUILDING - WEST HALL - THIRD FLOOR - DEMOLITION PLAN
PD-1WHA MAIN BUILDING - WEST HALL - ATTIC - DEMOLITION PLAN
PD-1WHR MAIN BUILDING - WEST HALL - ROOF - DEMOLITION PLAN
PD-1WRTN MAIN BUILDING - WEST RANGE - TUNNEL - NORTH - DEMOLITION PLAN
PD-1WRTS MAIN BUILDING - WEST RANGE - TUNNEL - SOUTH - DEMOLITION PLAN
PD-1WR0N MAIN BUILDING - WEST RANGE - GROUND FLOOR - NORTH - DEMOLITION PLAN
PD-1WR0S MAIN BUILDING - WEST RANGE - GROUND FLOOR - SOUTH - DEMOLITION PLAN
PD-1WR0MN MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - NORTH - DEMOLITION PLAN
PD-1WR0MS MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - SOUTH - DEMOLITION PLAN
PD-1WR1N MAIN BUILDING - WEST RANGE - FIRST FLOOR - NORTH - DEMOLITION PLAN
PD-1WR1S MAIN BUILDING - WEST RANGE - FIRST FLOOR - SOUTH - DEMOLITION PLAN
PD-1WR2N MAIN BUILDING - WEST RANGE - SECOND FLOOR - NORTH - DEMOLITION PLAN
PD-1WR2S MAIN BUILDING - WEST RANGE - SECOND FLOOR - SOUTH - DEMOLITION PLAN
PD-1WR3N MAIN BUILDING - WEST RANGE - THIRD FLOOR - NORTH - DEMOLITION PLAN
PD-1WR3S MAIN BUILDING - WEST RANGE - THIRD FLOOR - SOUTH - DEMOLITION PLAN
PD-1WRAN MAIN BUILDING - WEST RANGE - ATTIC - NORTH - DEMOLITION PLAN
PD-1WRAS MAIN BUILDING - WEST RANGE - ATTIC - SOUTH - DEMOLITION PLAN
PD-1WRRN MAIN BUILDING - WEST RANGE - ROOF - NORTH - DEMOLITION PLAN
PD-1WRRS MAIN BUILDING - WEST RANGE - ROOF - SOUTH - DEMOLITION PLAN
PD-1EWBN EAST WING - BASEMENT - NORTH - DEMOLITION PLAN
PD-1EWBS EAST WING - BASEMENT - SOUTH - DEMOLITION PLAN
PD-1EW0N EAST WING - GROUND FLOOR - NORTH - DEMOLITION PLAN
PD-1EW0S EAST WING - GROUND FLOOR - SOUTH - DEMOLITION PLAN
PD-1EW1N EAST WING - FIRST FLOOR - NORTH - DEMOLITION PLAN
PD-1EW1S EAST WING - FIRST FLOOR - SOUTH - DEMOLITION PLAN
PD-1EW2N EAST WING - SECOND FLOOR - NORTH - DEMOLITION PLAN
PD-1EW2S EAST WING - SECOND FLOOR - SOUTH - DEMOLITION PLAN
PD-1EW3N EAST WING - THIRD FLOOR - NORTH - DEMOLITION PLAN
PD-1EW3S EAST WING - THIRD FLOOR - SOUTH - DEMOLITION PLAN
PD-1EW4N EAST WING - FOURTH FLOOR - NORTH - DEMOLITION PLAN
PD-1EW4S EAST WING - FOURTH FLOOR - SOUTH - DEMOLITION PLAN
PD-1EW5N EAST WING - FIFTH FLOOR - NORTH - DEMOLITION PLAN
PD-1EW5S EAST WING - FIFTH FLOOR - SOUTH - DEMOLITION PLAN
PD-1EW6N EAST WING - SIXTH FLOOR - NORTH - DEMOLITION PLAN
PD-1EW6S EAST WING - SIXTH FLOOR - SOUTH - DEMOLITION PLAN
PD-1EWP EAST WING - PENTHOUSE - DEMOLITION PLAN
PD-1WWBN WEST WING - BASEMENT - NORTH - DEMOLITION PLAN
PD-1WWBS WEST WING - BASEMENT - SOUTH - DEMOLITION PLAN
PD-1WW0N WEST WING - GROUND FLOOR - NORTH - DEMOLITION PLAN
PD-1WW0S WEST WING - GROUND FLOOR - SOUTH - DEMOLITION PLAN
PD-1EWR EAST WING - ROOF - DEMOLITION PLAN
PD-1WW1N WEST WING - FIRST FLOOR - NORTH - DEMOLITION PLAN
PD-1WW1S WEST WING - FIRST FLOOR - SOUTH - DEMOLITION PLAN
PD-1WW2N WEST WING - SECOND FLOOR - NORTH - DEMOLITION PLAN
PD-1WW2S WEST WING - SECOND FLOOR - SOUTH - DEMOLITION PLAN
PD-1WW3N WEST WING - THIRD FLOOR - NORTH - DEMOLITION PLAN
t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
SF PROJECT NUMBER
DRAWING TITLE
WORKING STAFF
STAMP
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
A
B
C
D
E
F
G
H
J
K
REVISION # DATE REVISION DESCRIPTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
Federal Reserve Bank Building
100 N. 6th Street
Philadelphia, PA 19106
Tel: 215-923-2020
Fax: 215-574-9163 kjke rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp clo= `lkpqor`qflk
:4 :3
P
M DRAWING LIST - VOLUME #3
20190809
UPGRADE SANITARY AND STORM
SYSTEMS
12/05/25 BID SET ISSUANCE
G S H
B Y
A p p ro v e r
B
ID
S E T
IS
S U A N C
E NATIONAL MUSEUM OF NATURAL
HISTORY
10TH STREET & CONSTITUTION
AVE, WASHINGTON DC, 20560
1600103
PP/BK TVPP/BK
G-004SH
4 533
VOLUME #3 - ELECTRICAL, FIRE PROTECTION, FIRE ALARM
Sheet
Number Sheet Name
09 - Electrical
E-001SH LEGEND AND ABBREVIATIONS
E-401DP DEMOLITION PLAN - NORTH HALL - GROUND FLOOR
E-401PP POWER PLAN - NORTH HALL - GROUND FLOOR
E-401LP LIGHTING PLAN - NORTH HALL - GROUND FLOOR
E-402EP ENLARGED PLANS - WEST HALL - GROUND FLOOR
E-403EP ENLARGED PLANS - NORTH HALL - THIRD FLOOR
E-404EP ENLARGED PLANS - EAST RANGE - THIRD FLOOR - RESTROOM
E-405PP POWER PLAN - EAST RANGE - THIRD FLOOR - PANTRY
E-406EP ENLARGED PLANS - EAST HALL - THIRD FLOOR - PANTRY
E-407EP ENLARGED PLANS - EAST WING DASH - FIRST FLOOR
E-408EP ENLARGED PLANS - EAST WING - FIRST FLOOR
E-409EP ENLARGED PLANS - EAST WING DASH - SECOND FLOOR
E-410EP ENLARGED PLANS - EAST WING - SECOND FLOOR
E-411EP ENLARGED PLANS - EAST WING DASH - THIRD FLOOR
E-412EP ENLARGED PLANS - EAST WING - THIRD FLOOR
E-413EP ENLARGED PLANS - EAST WING DASH - FOURTH FLOOR
E-414EP ENLARGED PLANS - EAST WING - FOURTH FLOOR
E-415EP ENLARGED PLANS - EAST WING DASH - FIFTH FLOOR
E-416EP ENLARGED PLANS - EAST WING - FIFTH FLOOR
E-417EP ENLARGED PLANS - EAST WING DASH - SIXTH FLOOR
E-418EP ENLARGED PLANS - WEST WING DASH - THIRD FLOOR
E-419EP ENLARGED PLANS - WEST WING - THIRD FLOOR
E-420EP ENLARGED PLANS - WEST WING DASH - FOURTH FLOOR
E-421EP ENLARGED PLANS - WEST WING - FOURTH FLOOR
E-422EP ENLARGED PLANS - WEST WING DASH - FIFTH FLOOR
E-423EP ENLARGED PLANS - WEST WING - FIFTH FLOOR
E-424EP ENLARGED PLANS - WEST WING DASH - SIXTH FLOOR
E-425EP ENLARGED PLANS - EAST COURT - SECOND FLOOR
E-426EP ENLARGED PLANS - MAIN BUILDING, EAST WING & WEST WING
E-601SH LUMINAIRE SCHEDULE
E-611SH PANELBOARD SCHEDULES - MAIN BUILDING
E-612SH PANELBOARD SCHEDULES - MAIN BUILDING AND EAST COURT
E-613SH PANELBOARD SCHEDULES - EAST WING
E-614SH PANELBOARD SCHEDULES - EAST WING
E-615SH PANELBOARD SCHEDULES - EAST WING
E-616SH PANELBOARD SCHEDULES - EAST WING
E-617SH PANELBOARD SCHEDULES - EAST WING
E-618SH PANELBOARD SCHEDULES - WEST WING
E-619SH PANELBOARD SCHEDULES - WEST WING
E-620SH PANELBOARD SCHEDULES - WEST WING
E-621SH EMERGENCY PANELBOARD SCHEDULES
E-701SH LIGHTING CONTROL DIAGRAMS
E-702SH ELECTRICAL DETAILS
11 - Fire Protection
F-001CS COVER SHEET
F-401KP ENLARGED DEMOLITION PLANS - MAIN BUILDING - NORTH HALL - GROUND FLOOR - RESTROOMS
F-402 KP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - GROUND FLOOR - RESTROOMS
F-403KP ENLARGED PLANS - MAIN BUILDING - WEST HALL - GROUND FLOOR - RESTROOMS
F-404KP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - 3RD FLOOR - WOMEN'S RESTROOM
F-405KP ENLARGED PLANS - MAIN BUILDING - EAST RANGE - 3RD FLOOR - RESTROOM
F-406KP ENLARGED PLANS - EAST WING DASH - 1ST FLOOR - RESTROOMS
F-407KP ENLARGED PLANS - EAST WING - 1ST FLOOR - RESTROOMS
F-408KP ENLARGED PLANS - EAST WING DASH - 2ND FLOOR - RESTROOMS
F-409KP ENLARGED PLANS - EAST WING - 2ND FLOOR - RESTROOMS
F-410KP ENLARGED PLANS - EAST WING DASH - 3RD FLOOR - RESTROOMS
F-411KP ENLARGED PLANS - EAST WING - 3RD FLOOR - RESTROOMS
F-412KP ENLARGED PLANS - EAST WING DASH - 4TH FLOOR - RESTROOMS
F-413KP ENLARGED PLANS - EAST WING - 4TH FLOOR - RESTROOMS
F-414KP ENLARGED PLANS - EAST WING DASH - 5TH FLOOR - RESTROOMS
F-415KP ENLARGED PLANS - EAST WING - 5TH FLOOR - RESTROOMS
F-416KP ENLARGED PLANS - EAST WING DASH - 6TH FLOOR - RESTROOMS
F-417KP ENLARGED PLANS - WEST WING DASH - 3RD FLOOR - RESTROOMS
F-418KP ENLARGED PLANS - WEST WING - 3RD FLOOR - RESTROOMS
F-419KP ENLARGED PLANS - WEST WING DASH - 4TH FLOOR - RESTROOMS
F-420KP ENLARGED PLANS - WEST WING - 4TH FLOOR - RESTROOMS
F-421KP ENLARGED PLANS - WEST WING DASH - 5TH FLOOR - RESTROOMS
F-422KP ENLARGED PLANS - WEST WING - 5TH FLOOR - RESTROOMS
F-423KP ENLARGED PLANS - WEST WING DASH - 6TH FLOOR - RESTROOMS
F-424KP ENLARGED PLANS - EAST COURT - 2ND FLOOR - RESTROOM
F-501KP FIRE PROTECTION DETAILS
12 - Fire Alarm
FA-001CS COVER SHEET
FA-401EP ENLARGED DEMOLITION PLANS - MAIN BUILDING - NORTH HALL - GROUND FLOOR - RESTROOMS
FA-402EP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - GROUND FLOOR - RESTROOMS
FA-403EP ENLARGED PLANS - MAIN BUILDING - WEST HALL - GROUND FLOOR - RESTROOMS
FA-404EP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - 3RD FLOOR - WOMEN'S RESTROOM
FA-405EP ENLARGED PLANS - MAIN BUILDING - EAST RANGE - 3RD FLOOR - RESTROOM
FA-406EP ENLARGED PLANS - EAST WING DASH - 1ST FLOOR - RESTROOMS
FA-407EP ENLARGED PLANS - EAST WING - 1ST FLOOR - RESTROOMS
FA-408EP ENLARGED PLANS - EAST WING DASH - 2ND FLOOR - RESTROOMS
FA-409EP ENLARGED PLANS - EAST WING - 2ND FLOOR - RESTROOMS
FA-410EP ENLARGED PLANS - EAST WING DASH - 3RD FLOOR - RESTROOMS
FA-411EP ENLARGED PLANS - EAST WING - 3RD FLOOR - RESTROOMS
FA-412EP ENLARGED PLANS - EAST WING DASH - 4TH FLOOR - RESTROOMS
FA-413EP ENLARGED PLANS - EAST WING - 4TH FLOOR - RESTROOMS
FA-414EP ENLARGED PLANS - EAST WING DASH - 5TH FLOOR - RESTROOMS
FA-415EP ENLARGED PLANS - EAST WING - 5TH FLOOR - RESTROOMS
FA-416EP ENLARGED PLANS - EAST WING DASH - 6TH FLOOR - RESTROOMS
FA-417EP ENLARGED PLANS - WEST WING DASH - 3RD FLOOR - RESTROOMS
FA-418EP ENLARGED PLANS - WEST WING - 3RD FLOOR - RESTROOMS
FA-419EP ENLARGED PLANS - WEST WING DASH - 4TH FLOOR - RESTROOMS
FA-420EP ENLARGED PLANS - WEST WING - 4TH FLOOR - RESTROOMS
FA-421EP ENLARGED PLANS - WEST WING DASH - 5TH FLOOR - RESTROOMS
FA-422EP ENLARGED PLANS - WEST WING - 5TH FLOOR - RESTROOMS
FA-423EP ENLARGED PLANS - WEST WING DASH - 6TH FLOOR - RESTROOMS
FA-424EP ENLARGED PLANS - EAST COURT - 2ND FLOOR - RESTROOM
FA-501EP DETAILS
@ AT
A AMPERE
ABV ABOVE
AF AMP FRAME
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC AMPERE INTERRUPTING CURRENT
AL ALUMINUM
ALT ALTERNATE
AM AMMETER
AMP AMPERE
ANNUN ANNUNCIATOR
ANT ANTENNA
ARCH ARCHITECT
AS AMMETER SWITCH
AT AMP TRIP
ATC AUTOMATIC TEMPERATURE CONTROL
ATS AUTOMATIC TRANSFER SWITCH
AUX AUXILIARY
BD BUS DUCT
BKBD BACKBOARD
BKR BREAKER
C CONDUIT
CAB CABINET
C/B CIRCUIT BREAKER
CBL CABLE
CDT CONDUIT
CKT CIRCUIT
CLG CEILING
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CPT CONTROL POWER TRANSFORMER
CT CURRENT TRANSFORMER
CU COPPER
DEMO DEMOLITION
DC DIRECT CURRENT
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DWG DRAWING
DP DISTRIBUTION PANEL
E EMERGENCY
EA EACH
EC ELECTRICAL CONTRACTOR
EDP ELECTRICAL DATA PROCESSING
ELEC ELECTRICAL
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EO ELECTRICALLY OPERATED
ER EXISTING RELOCATED
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EX EXISTING TO REMAIN
F FUSED
F/A FIRE ALARM
FBO FURNISHED BY OWNER
FD FEEDER DUCT
FDR FEEDER
FL FLOOR
FS FLOW SWITCH
FUT FUTURE
G EQUIPMENT GROUND CONDUCTOR
GA GAUGE
GC GENERAL CONTRACTOR
GFI GROUND FAULT INTERRUPTER
GFSC GROUND FAULT SENSING RELAY
GND GROUND
GSC SYSTEM CIRCUIT GROUND CONDUCTOR
HD HAND DRYER
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HV HIGH VOLTAGE
HVAC HEATING, VENTILATION, AIR CONDITIONING
ID INSIDE DIMENSION
ILL ILLUMINATION
IMC INTERMEDIATE METAL CONDUIT
INV INVERT
JB JUNCTION BOX
JUNC JUNCTION
KVA KILOVOLT-AMPERE
KW KILOWATT
KWH KILOWATT-HOUR
LA LIGHTNING SURGE ARRESTER
LCP LOCAL CONTROL PANEL
LIM LINE ISOLATION MONITOR
LS LIMIT SWITCH
LT LIGHT
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCP MOTOR CIRCUIT PROTECTOR
MCS MOLDED CASE SWITCH
ME MODIFY EXISTING
MFR MANUFACTURER
MIN MINIMUM
MO MECHANICALLY OPERATED
MLO MAIN LUGS ONLY
MTD MOUNTED
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
N NEUTRAL
NAC NOTIFICATION APPLIANCE CIRCUIT
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OCP OVERCURRENT PROTECTION
OD OUTSIDE DIMENSION
P POLE
PB PULL BOX
PC PLUMBING CONTRACTOR
PF POWER FACTOR
PH PHASE
PL PILOT LIGHT
PNL PANEL
PRI PRIMARY
PS PULL STATION
PSI POUNDS PER SQUARE INCH
PT POTENTIAL TRANSFORMER
PWR POWER
RCVR RECEIVER
RE REMOVE EXISTING
REQ REQUIRED
REX RELOCATE EXISTING
SEC SECONDARY
SLC SIGNALING LINE CIRCUIT
SLD SINGLE LINE DIAGRAM
SLV SLEEVE
SPEC SPECIFICATION
SS SUBSTATION
ST SHUNT TRIP
STD STANDARD
STR STARTER
SW SWITCH
SWGR SWITCHGEAR
SYS SYSTEM
TEL TELEPHONE
TEMP TEMPERATURE
TERM TERMINAL
TV TELEVISION
TYP TYPICAL
UC UNDERCOUNTER
U/F UNFUSED
UL UNDERWRITERS' LABORATORY
UON UNLESS OTHERWISE NOTED
V VOLT
VFD VARIABLE FREQUENCY DRIVE
VM VOLTMETER
VS VOLTMETER SWITCH
W WATT
WP WEATHERPROOF
XDR TRANSDUCER
XFMR TRANSFORMER
XFR TRANSFER
XMTR TRANSMITTER
XP EXPLOSION-PROOF
XPDR TRANSPONDER
GENERAL ABBREVIATIONS
MOUNTING HEIGHTS
STANDARD MOUNTING HEIGHTS
WALL-MOUNTED CLOCKS AND PROGRAM BELLS (LOWEST OF TWO
HEIGHTS OR AS SHOWN ON ARCHITECTURAL DETAILS)
9" BELOW
FINISHED
CEILING OR
10'-0" AFF
NOTES:
1. THE ABOVE MOUNTING HEIGHTS SHALL BE ADHERED TO UNLESS SPECIFICALLY NOTED OR
DETAILED OTHERWISE ON THE DRAWINGS OR SPECIFICATIONS. REFER TO ARCHITECTURAL 'G'
SERIES DRAWINGS TITLES "MOUNTING HEIGHTS AND CLEARANCES" AND INTERIOR ELEVATIONS
FOR ADDITIONAL MOUNTING HEIGHT REQUIREMENTS.
2. MOUNTING HEIGHTS TO CENTER OF OUTLETS UNLESS OTHERWISE NOTED. IN MASONRY
CONSTRUCTION THE ABOVE MOUNTING HEIGHTS SHALL BE USED FOR REFERENCE TO NEAREST
BLOCK OR BRICK COURSING.
3. A + SYMBOL BESIDE A DEVICE INDICATES DEVICE MOUNTED ABOVE COUNTER OR CASEWORK.
REFER TO ARCHITECTURAL AND CASEWORK DETAILS FOR ACTUAL ELEVATION.
BATTERY LIGHTING UNITS AND REMOTE WALL MOUNTED LIGHT
HEADS (OR 1'-0" BELOW FINISHED CEILING TO TOP OF UNIT)
10'-0"
8'-6"
7'-6"+
7'-6"
PENDANT HUNG INDUSTRIAL AND STRIP LUMINARIES
TELEVISION OUTLET AND SERVICE RECEPTACLE FOR SHELF
MOUNTED TV IN BEDROOMS
TOP OF BACK MOUNTED WALL EXIT LUMINARIES
(NOT MOUNTED ABOVE DOORS)
WARNING AND SIGNALING LUMINARIES/SIGNS
TOP OF FLUSH AND SURFACE MOUNTED ELECTRICAL LIGHTING
OR POWER PANELBOARDS
CENTERED
ABOVE DOOR
OR WINDOW
OPENING
6'-6"
6'-0"
4'-0"
TOP OF HIGHEST ELECTRICAL SAFETY DISCONNECT SWITCHES,
MAGNETIC STARTERS AND CONTRACTORS
WALL-MOUNTED WIREWAY
3'-8" WALL-MOUNTED PAY STATIONS (3'-6" AT ADA LOCATIONS)
3'-8"
WALL-MOUNTED ELECTRICAL DEVICES, LIGHTING SWITCHES,
OCCUPANCY SENSORS, AND MANUAL MOTOR STARTERS
2'-0" ELECTRICAL RECEPTACLES WITHIN MECHANICAL SPACES,
ELECTRICAL AND ELEVATOR ROOMS
18" ELECTRICAL RECEPTACLES, PATIENT ROOM NIGHTLIGHTS
6" ELECTRICAL CONNECTIONS TO SYSTEMS FURNITURE
0'-0" FINISHED FLOOR
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
FOR DESCRIPTION OF SYMBOLS, SEE "ELECTRICAL SYMBOL LIST" AND SPECIFICATIONS.
WHERE THERE IS A CONFLICT BETWEEN THE FLOOR PLANS, DETAILS, SCHEDULES, DIAGRAMS, OR
SPECIFICATIONS, THE MORE STRINGENT CRITERIA SHALL APPLY.
DIMENSIONS MARKED +/- ARE TO BE VERIFIED IN THE FIELD. THOSE MARKED N.T.S. ARE SHOWN NOT TO SCALE. ALL OTHERS SHOULD BE CHECKED WITH OTHER TRADE DRAWINGS AND VERIFIED BY THE
CONTRACTOR.
MOUNTING HEIGHTS SHALL BE AS INDICATED IN "MOUNTING HEIGHTS" SCHEDULE.
FOR EXACT LOCATION OF REMOVABLE PARTITIONS, REFER TO ARCHITECTURAL DRAWINGS.
CONTRACTOR SHALL VERIFY ALL DOOR SWINGS BEFORE INSTALLING SWITCH BOXES.
FOR EXACT LOCATIONS OF LUMINARIES, SEE REFLECTED CEILING PLAN DRAWINGS.
FOR MOUNTING HEIGHT OF UNDERCOUNTER LUMINARIES AND OTHER TASK LIGHTING, REFER TO
ARCHITECTURAL DRAWINGS.
ELECTRICAL CONTRACTOR SHALL COORDINATE THE EXACT LOCATION OF SUSPENDED AND/OR
SURFACE MOUNTED LUMINARIES IN MECHANICAL AND STORAGE AREAS WITH OTHER TRADES PRIOR
TO ROUGH-IN AND INSTALLATION.
REFER TO HEATING, VENTILATING, AIR-CONDITIONING, AND PLUMBING SECTIONS OF THE
SPECIFICATIONS AND MECHANICAL EQUIPMENT COORDINATION SCHEDULES FOR REQUIRED
CONTROL WIRING OF MECHANICAL EQUIPMENT.
THE ELECTRICAL CONTRACTOR SHALL PROVIDE EXPANSION FITTINGS IN ALL RACEWAYS CROSSING CONSTRUCTION EXPANSION JOINTS. REFER TO STRUCTURAL DRAWINGS FOR LOCATION OF JOINTS.
UNLESS INDICATED OTHERWISE, ALL PANELS, CABINETS, AND THE LIKE IN ELECTRIC CLOSETS OR
EQUIPMENT ROOMS ARE TO BE MOUNTED ON STRUCTURAL CHANNEL FRAMING WHICH SHALL BE
SECURED TO STRUCTURAL FLOOR AND CEILING SLABS.
WHERE THE NUMBER OF CURRENT-CARRYING CONDUCTORS IN A RACEWAY EXCEED THREE,
ADJUST THE WIRE SIZE IN ACCORDANCE WITH NEC ARTICLE 310 TABLE TITLED "ADJUSTMENT
FACTORS FOR MORE THAN THREE CURRENT-CARRYING CONDUCTORS IN A RACEWAY OR CABLE". IN
ACCORDANCE WITH THE SPECIFICATIONS, A MAXIMUM OF SIX CURRENT CARRYING CONDUCTORS
SHALL BE PERMITTED TO BE INSTALLED IN A RACEWAY.
DRAWING INDEX
3'-8"
ELECTRICAL RECEPTACLES FOR REFRIGERATORS, FREEZERS, AND
VENDING MACHINES (18" FOR UNDER COUNTER)
WIRING DEVICES AND BOXES
SINGLE RECEPTACLE
INDICATES CIRCUIT AT PANELBOARD
DUPLEX RECEPTACLE SPLIT WIRED
DUPLEX RECEPTACLE5
XX
(FUNCTION)
TR - TAMPER RESISTANT
EP - EXPLOSION PROOF
NE - NON-EXPLOSION PROOF ENCLOSED
IG - ISOLATED GROUND
C - CONTROLLED RECEPTACLE
QUADRUPLEX RECEPTACLE
GROUND FAULT CIRCUIT INTERRUPTER DUPLEX RECEPTACLE
GROUND FAULT CIRCUIT INTERRUPTER QUADRUPLEX RECEPTACLE
INDICATES NEMA TYPE
SPECIAL PURPOSE RECEPTACLE
XX
DUPLEX RECEPTACLE - CEILING MOUNTED
FLOOR BOX IN SLAB
COUNTERTOP MOUNTED RECEPTACLE WITH DEVICE AS SHOWN
POKE-THROUGH FLOOR OUTLET WITH DEVICE AS SHOWN
DROP CORD REEL OUTLET - CEILING OR WALL MOUNTED
DEVICE DIRECT CONNECTED TO EQUIPMENT
OUTLET BOX WITH BLANK COVER
CONCEALED JUNCTION BOX
SURFACE MOUNTED JUNCTION BOX
PULL BOX WITH SYSTEM AS INDICATED
PUSH BUTTON
BUZZER
MOTOR BY DIV. 23
POWER POLE
PUSH PLATE SWITCH FOR AUTOMATIC DOOR OPENER
R R
J
BB
J J
J J
PB
CONDUIT
CONDUIT DROP
CONDUIT RISE
CONDUIT FLOOR TO FLOOR
CONDUIT STUBBED OUT OR INTO HUNG CEILING SPACE
THROUGH WALL CONDUIT SEALANT FITTING
WIRING
BRANCH CIRCUIT WIRING CONCEALED IN WALL OR ABOVE CEILING CONSTRUCTION
CIRCUIT NUMBER AT PANELBOARD
BRANCH CIRCUIT WIRING RUN EXPOSED
EMERGENCY SYSTEM BRANCH CIRCUIT WIRING
BRANCH CIRCUIT WIRING TO PANEL
BRANCH CIRCUIT WIRING IN OR BELOW FLOOR CONSTRUCTION
E
LUMINARIES
EXTERIOR LUMINAIRE - POLE MOUNTED
EXTERIOR LUMINAIRE - WALL MOUNTED
EXTERIOR DIRECTIONAL FLOOD LUMINAIRE - MOUNTED ON POLE, BUILDING OR AT GRADE
LUMINAIRE - NUMBER INDICATES CIRCUIT; LETTER INDICATES SWITCH LEG
INDICATES LUMINAIRE WITH SEPARATELY SWITCHED BALLASTS
PENDANT MOUNTED LUMINAIRE
DOWNLIGHT - SURFACE OR RECESSED
WALLWASHER
PENDANT LUMINAIRE
INDUSTRIAL LUMINAIRE - STRIPS AND CHANNELS
WALL MOUNTED OR UNDERCOUNTER LUMINAIRE
WALL SCONCE
TRACK SYSTEM WITH DOWNLIGHT OR FLOOD LIGHTING
PERIMETER SYSTEMS OR COVES
SURFACE OR PENDANT MOUNTED H.I.D.
NIGHT LIGHT OR STEP LIGHT
INTERIOR DIRECTIONAL FLOOD LUMINAIRE
WARNING LIGHT - CEILING OR WALL MOUNTED
EXIT LUMINAIRE - CEILING OR WALL MOUNTED
EMERGENCY BATTERY UNIT WITH REMOTE HEAD
INDICATES LUMINAIRE ON EMERGENCY CIRCUIT OR EQUIPPED WITH BATTERY
EXTERIOR BOLLARD
a a b
E E
EM
CONTROL DEVICES
TOGGLE SWITCH (SINGLE POLE UNLESS OTHERWISE NOTED)
D - DIMMING
LX - LOW VOLTAGE (X INDICATES # OF SELECTOR BUTTONS)
LM - LOW VOLTAGE MASTER SWITCH
OC - OCCUPANCY SENSOR
S
PC
x
(FUNCTION)
a, b, c - INDICATES SWITCHLEG
2 - DOUBLE POLE SINGLE THROW
3 - THREE WAY
4 - FOUR WAY
CEILING MOUNTED OCCUPANCY SENSOR
PHOTOCELL
M - MANUAL MOTOR STARTER
V - VARIABLE SPEED CONTROL
3P - SINGLE POLE, 3 POSITION, CENTER OFF MOMENTARY CONTACT SWITCH
CO - SINGLE POLE, CENTER OFF MOMENTARY CONTACT SWITCH
P - WITH PILOT LIGHT
LT - LIGHTED TOGGLE (LIGHTED WHEN LOAD IS OFF)
E - INDICATES EMERGENCY CIRCUIT AND LIGHTED TOGGLE
POWER DISTRIBUTION
BUS DUCT
BUS DUCT WITH CIRCUIT PROTECTIVE DEVICE
BD
BUS DUCT RISER
BUS DUCT RISER WITH CIRCUIT PROTECTIVE DEVICE
TROLLEY DUCT
TROLLEY DUCT WITH BOOX TOOL HANGER
BD
BD
BD
TD
TD
CIRCUIT PROTECTION / DISCONNECT
CIRCUIT BREAKER
(INDICATES FUSE TYPE)
DE - DUAL ELEMENT
CL - CURRENT LIMITING TIME DELAY
MOLDED CASE SWITCH
UNFUSED SAFETY DISCONNECT SWITCH
FUSED SAFETY DISCONNECT SWITCH
DISCONNECT AND/OR MOTOR PROTECTION BY DIV. 22/23
EMERGENCY POWER SHUTDOWN STATION (EPO)
EMERGENCY GENERATOR POWER SHUTDOWN STATION
M
MCS
SE
S G
MOTOR CONTROL
COMBINATION MOTOR STARTED AND MOTOR CIRCUIT BREAKER
COMBINATION MOTOR STARTER AND DISCONNECT SWITCH
COMBINATION MOTOR STARTER AND FUSED DISCONNECT SWITCH
CONTROL PANEL
MOTOR STARTER
CP
VARIABLE FREQUENCY DRIVEVFD
PANELBOARDS
ELECTRICAL DISTRIBUTION PANELBOARD (ACTUAL SIZE)
ELECTRICAL PANELBOARD
RACEWAYS
SURFACE MOUNTED WIREWAY
SURFACE MOUNTED MULTI-OUTLET RACEWAY
RACEWAY SYSTEM
UNDERFLOOR TRENCH DUCT JUNCTION BOX
(INDICATES TYPE OF RACEWAY)
CT - CABLE TRAY UF - UNDERFLOOR DUCT
WW - WIREWAY TD - TRENCH DUCT
CF - CELLULAR FLOOR SYSTEM WD - WALL DUCT
P
W
CT
EQUIPMENT GROUNDING AND LIGHTNING
PROTECTION
EQUIPMENT GROUND CONDUCTOR
EXISTING EQUIPMENT GROUND CONDUCTOR
EQUIPMENT GROUND BUS BAR
EXISTING LIGHTNING PROTECTION CONDUCTOR
LIGHTNING PROTECTION AIR TERMINAL
GROUND ROD AND LIGHTNING PROTECTION CONDUCTOR THROUGH BUILDING
WALL TO STEEL
GB
XL
DL
GROUND ROD
GROUND ROD AND ACCESS WELL
LIGHTNING PROTECTION CONDUCTOR
LIGHTNING PROTECTION CONDUCTOR
LIGHTNING PROTECTION CONDUCTOR, CHANGE IN LEVEL
LIGHTNING PROTECTION CONDUCTOR, CHANGE IN LEVEL
L
G
XG
LG
WALL MOUNTED OCCUPANCY SENSOR
SPORTS LIGHTING FIXTURE - SINGLE MAST
SPORTS LIGHTING FIXTURE - DOUBLE MAST
FURNITURE FEED FLOOR BOX IN SLABJ
ELECTRICAL CONSTRUCTION LOGISTICS
1.
2.
3.
4.
5.
6.
7.
8.
ALL WORK REQUIRING ELECTRICAL SHUTDOWNS OF EQUIPMENT OR DEVICES SERVING OCCUPIED
AREAS OR AFFECTED THE OPERATION OF THE BUILDING MUST BE PERFORMED BEFORE OR AFTER
NORMAL MUSEUM OPERATING HOURS AND SPECIAL ‘AFTER HOURS’ EVENTS AT NO ADDITIONAL
COST TO THE OWNER. REFER TO SPECIFICATION 01 10 00.
PROVIDE TEMPORARY CONNECTIONS NECESSARY TO PERMIT THE OWNER TO OCCUPY AREAS OF
THE BUILDING OUTSIDE THE SCOPE OF WORK DURING NORMAL MUSEUM OPERATING HOURS.
ELECTRICAL CONTRACTOR MUST BE RESPONSIBLE FOR PROVIDING TEMPORARY OR PERMANENT
POWER TO EQUIPMENT AS REQUIRED TO SUPPORT PROJECT PHASING. REFER TO CONSTRUCTION
PLANS AND PLUMBING PHASING PLANS FOR FURTHER INFORMATION.
ALL EXISTING AND NEW LIFE SAFETY EMERGENCY BUILDING SYSTEMS IMPACTED BY PROJECT
SCOPE MUST E TESTED, INSPECTED AND WITNESSED AT THE END OF EACH PHASE.
ELECTRICAL SHUTDOWN AFFECTING THE NORMAL OPERATION OF EQUIPMENT IN CRITICAL SPACES MUST BE MINIMIZED TO THE FURTHEST EXTENT POSSIBLE. THE SMITHSONIAN MUST BE NOTIFIED IN
ADVANCE IF ANY CRITICAL SPACES WILL EXPERIENCES A LOSS OF POWER LONGER THAN 30
MINUTES. CRITICAL SPACES INCLUDE THE FOLLOWING BUT ARE NOT LIMITED TO: IT
ROOMS/CLOSETS, SECURITY ROOMS/CLOSETS AND CALL CENTER ROOM 11K2.
NEW PLUMBING AND MECHANICAL WORK WILL OCCUR OUTSIDE OF THE PROJECT AREAS SHOWN ON THE FOLLOWING ELECTRICAL DRAWINGS THAT MAY AFFECT EXISTING ELECTRICAL SYSTEMS. THE
ELECTRICAL CONTRACTOR MUST REFER TO THE FULL PROJECT DRAWING SET AND FAMILIARIZE
THEMSELVES WITH ALL ASPECTS OF OTHER DISCIPLINES' SCOPE. ANY ELECTRICAL EQUIPMENT, WIRING, CONDUIT AND/OR JUNCTION BOXES FOUND TO BE INTERFERING WITH PROPOSED NEW
CONSTRUCTION IN THESE AREAS MUST BE REMOVED AND RELOCATED TO CLEAR THE CONFLICT
AREA.
NEW PLUMBING WORK WILL OCCUR IN THE NMNH TUNNELS (BELOW MAIN BUILDING GROUND
FLOOR). ANY EXISTING ELECTRICAL EQUIPMENT, WIRING, CONDUIT AND/OR JUNCTION BOXES FOUND TO BE INTERFERING WITH PROPOSED NEW CONSTRUCTION MUST BE REMOVED AND RELOCATED TO
CLEAR THE CONFLICT AREA.
FOR NMNH MAIN BUILDING TUNNEL WORK BELOW PAINT BOOTH ROOM 71, THE CONTRACTOR WILL
NEED TO DENERGIZE THE WEST COURT 208/120V MAIN FEEDERS SUPPLIED FROM THE MAIN
BUILDING SWITCHBOARD. ALL SHUTDOWNS MUST BE PERFORMED OUTSIDE OF NORMAL MUSEUM
OPERATING HOURS AND THEY MUST BE COORDINATED WITH COTR PRIOR TO SCHEDULING.
REFER TO CONSTRUCTION LOGISTICS AND PHASING DRAWINGS
IN THE GENERAL SERIES FOR MORE INFORMATION ON PROJECT
IMPLEMENTATION. REFER TO DIVISION 01 SPECIFICATIONS FOR
ADDITIONAL INFORMATION ON BASE BID AND PRICED OPTIONS.
pãáíÜëçåá~å=c~ÅáäáíáÉë= SMM=j~êóä~åÇ=^îÉåìÉ=pKtK=pìáíÉ=RMMN t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå
KEY PLAN
GRAPHIC SCALE(S)
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
SF PROJECT NUMBER
DRAWING TITLE
WORKING STAFF
STAMP
DATE SUBMISSION
A
B
C
D
E
F
G
H
J
K
A
B
C
D
E
F
G
H
J
K
REVISION # DATE REVISION DESCRIPTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
WEST
WING
WEST
COURT
Federal Reserve Bank Building
100 N. 6th Street
Philadelphia, PA 19106
Tel: 215-923-2020
Fax: 215-574-9163
EAST
COURT
WEST HALL
EAST
WING
CHILLER PLANT
kjke rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp
D A S H
D A S H
EAST HALL
WEST RANGE EAST RANGE
NORTH
HALL
ROTUNDA
MAIN BUILDING
clo= `lkpqor`qflk
:1 :0
P
M LEGEND AND ABBREVIATIONS
20190809
UPGRADE SANITARY AND STORM
SYSTEMS
12/05/25 BID SET ISSUANCE
E S H
B Y
A p p ro v e r
B
ID
S E T
IS
S U A N C E
NATIONAL MUSEUM OF NATURAL
HISTORY
10TH STREET & CONSTITUTION
AVE, WASHINGTON DC, 20560
1600103
ETC JFJF
E-001SH
438 533
E-001SH LEGEND AND ABBREVIATIONS
E-401DP DEMOLITION PLAN - NORTH HALL - GROUND FLOOR
E-401PP POWER PLAN - NORTH HALL - GROUND FLOOR
E-401LP LIGHTING PLAN - NORTH HALL - GROUND FLOOR
E-402EP ENLARGED PLANS - WEST HALL - GROUND FLOOR
E-403EP ENLARGED PLANS - NORTH HALL - THIRD FLOOR
E-404EP ENLARGED PLANS - EAST RANGE - THIRD FLOOR -
RESTROOM
E-405PP POWER PLAN - EAST RANGE - THIRD FLOOR - PANTRY
E-406EP ENLARGED PLANS - EAST HALL - THIRD FLOOR - PANTRY
E-407EP ENLARGED PLANS - EAST WING DASH - FIRST FLOOR
E-408EP ENLARGED PLANS - EAST WING - FIRST FLOOR
E-409EP ENLARGED PLANS - EAST WING DASH - SECOND FLOOR
E-410EP ENLARGED PLANS - EAST WING - SECOND FLOOR
E-411EP ENLARGED PLANS - EAST WING DASH - THIRD FLOOR
E-412EP ENLARGED PLANS - EAST WING - THIRD FLOOR
E-413EP ENLARGED PLANS - EAST WING DASH - FOURTH FLOOR
E-414EP ENLARGED PLANS - EAST WING - FOURTH FLOOR
E-415EP ENLARGED PLANS - EAST WING DASH - FIFTH FLOOR
E-416EP ENLARGED PLANS - EAST WING - FIFTH FLOOR
E-417EP ENLARGED PLANS - EAST WING DASH - SIXTH FLOOR
E-418EP ENLARGED PLANS - WEST WING DASH - THIRD FLOOR
E-419EP ENLARGED PLANS - WEST WING - THIRD FLOOR
E-420EP ENLARGED PLANS - WEST WING DASH - FOURTH FLOOR
E-421EP ENLARGED PLANS - WEST WING - FOURTH FLOOR
E-422EP ENLARGED PLANS - WEST WING DASH - FIFTH FLOOR
E-423EP ENLARGED PLANS - WEST WING - FIFTH FLOOR
E-424EP ENLARGED PLANS - WEST WING DASH - SIXTH FLOOR
E-425EP ENLARGED PLANS - EAST COURT - SECOND FLOOR
E-426EP ENLARGED PLANS - MAIN BUILDING, EAST WING & WEST
WING
E-601SH LUMINAIRE SCHEDULE
E-611SH PANELBOARD SCHEDULES - MAIN BUILDING
E-612SH PANELBOARD SCHEDULES - MAIN BUILDING AND…