33330226RF0010002 Amendment 0005.pdf

PDF 29 MB Posted

Attached to
Upgrade Sanitary and Storm Systems at the National Museum of Natural History
Solicitation number
33330226RF0010002
Issued by

About this file

This is Amendment 0005 to a federal solicitation issued by the Smithsonian Institution for upgrades to sanitary and storm systems at the National Museum of Natural History (NMNH) located in Washington, DC. The amendment incorporates Responses to Requests for Information (RFIs) for Questions 76-82 and Addendum No. 1 containing updated specifications and drawings dated May 12, 2026. Key modifications address architectural details including door head and jamb information, mirror specifications, signage material standards (aluminum sheet and plate per ASTM specifications, acrylic sheet per ASTM D 4802, and vinyl characters), concrete sealer products for custodial closets, terrazzo flooring acceptance in toilet rooms and elevator lobbies, existing electrical panel information, and door hardware set specifications. The amendment extends the proposal due date to June 3, 2026, at 3:00 PM EST. Addendum No. 1 modifies specifications across multiple divisions including alteration procedures, testing and inspection services, selective demolition, masonry, door hardware, panel signage, plumbing systems and fixtures, HVAC materials and methods, and earthmoving. Numerous architectural drawings are updated to reflect integral base elevations, access hatch modifications with terrazzo infill, remediation recommendations changes from encapsulation to abatement, updated tree designations, and attic stair dimensions. Plumbing drawings incorporate revised implementation steps for storm and sanitary stack removal with updated logistics and phasing notes. All offerors must acknowledge receipt of all amendments signed and dated with their proposal submissions.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

33330226RF0010002

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

OCON

Washington DC 20013-7012 PO Box 37012

MRC 1200

OCON

OCON

Washington DC 20013-7012 PO Box 37012

MRC 1200

SMITHSONIAN INSTITUTION

05/14/20260005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/12/2026

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. The Solicitation Number cited above, to upgrade Sanitary and Storm Systems at the

National Museum of Natural History (NMNH), located in Washington, DC, is hereby amended as follows:

A.1. Attached hereto and made a part of this Amendment Five are the SI Responses to RFIs for Questions Nos. 76-82.

A.2. Attached Addendum No. 1, including the narrative, specifications, and drawings dated

05/12/2026, is hereby incorporated into the solicitation.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Thomas Dempsey

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 336CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

33330226RF0010002/0005

A.3. Offerors shall acknowledge receipt of all amendments to this solicitation signed and dated and submit with proposal.

B. The Due Date for Receipt of Proposals is extended to June 3, 2026, at 3:00 PM EST.

Except as provided herein, all other provisions, terms and conditions of the Solicitation remain unchanged.

END OF AMENDMENT FIVE

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

1600103 NMNH Upgrade Sanitary and Storm Systems May 13, 2026

Upgrade Sanitary and Storm Issued May 13, 2026

NMNH

Bid Phase RFIs

Number Date Received Discipline Question Response

76 5/4/2026 Architectural

Per drawing A-506DT, please provide head & jamb details associated with the scheduled doors. Head and jamb details have been updated in addendum 1.

77 5/4/2026 Architectural Confirm if all mirrors (over sink and full length) require plywood on z clip backer or if only mirrors at sinks) All mirrors are Frameless (GL-1) and require detail J1/00SH.

78 5/4/2026

Architectural Please clarify the signage material and thickness. Is there an existing standard to match for the signage?

There are no bronze signs.

Aluminum Sheet and Plate: ASTM B 209 (ASTM B 209M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with at least the strength and durability properties of Alloy 5005-H32.

Aluminum Extrusions: ASTM B 221 (ASTM B 221M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with at least the strength and durability properties of Alloy 6063-T5.

Acrylic Sheet: ASTM D 4802, Category A-1 (cell-cast sheet), Type UVA (UV absorbing).

Applied Vinyl: Die-cut characters from vinyl film of nominal thickness of 0.003” (0.076mm) with pressure–sensitive adhesive backing.

Interior Panel Signs: Provide smooth sign panel surfaces constructed to remain flat under installed conditions within a tolerance of plus or minus 1/16 inch (1.5 mm) measured diagonally from corner to corner, complying with the following requirements:

1. Laminated Sheet: High-pressure engraved stock with contrasting color face laminated to acrylic core as selected by COTR from manufacturer's full range.

2. Laminated, Etched Photopolymer: Raised graphics with Braille 1/32 inch (0.8 mm) above surface with contrasting colors as selected by Architect from manufacturer's full range and laminated to acrylic back.

3. Edge Condition: Bullnose.

4. Corner Condition: Square Rounded to ½” (12.7mm) Radius.

5. Mounting: As indicated.

a. Wall mounted with concealed anchors.

b. Manufacturer's standard anchors for substrates encountered.

6. Color: As selected by Architect from manufacturer's full range.

7. Tactile Characters: Characters and Grade 2 Braille raised 1/32 inch (0.8 mm) above surface with contrasting colors.

Tactile and Braille Sign: Manufacturer's standard process for producing text and symbols complying with ADA-ABA Accessibility Guidelines and with ICC/ANSI A117.1. Text shall be accompanied by Grade 2 Braille. Produce precisely formed characters with square-cut edges free from burrs and cut marks; Braille dots with domed or rounded shape.

1. Panel Material: Opaque acrylic sheet.

2. Raised-Copy Thickness: Not less than 1/32 inch (0.8 mm).

F. Subsurface Engraved Acrylic Sheet: Reverse-engrave back face of clear acrylic sheet.

Fill resulting copy with enamel. Apply opaque background color coating over enamel-filled copy.

G. Colored Coatings for Acrylic Sheet: For copy background and frame colors, provide colored coatings, including inks, dyes, and paints, that are recommended by acrylic manufacturers for optimum adherence to acrylic surface and are UV and water resistant for five years for application intended.

1. Color: As selected by COTR from manufacturer's full range Acrylic Sheet Finishes:

Colored Coatings for Acrylic Sheet: For copy background and frame colors, provide colored coatings, including inks, dyes, and paints, that are recommended by acrylic manufacturers for optimum adherence to acrylic surface and that are UV and water resistant for five years for application intended.

79 5/4/2026

Architectural

The Interior Finish Schedule on I-001SH lists the 03 54 16 as the spec section for the SC1 sealer that is installed within custodial closets throughout the project. The 03 54 16 specification lists a hydraulic cement underlayment as the product. This product is typically installed as a floor leveler for another finish to be installed atop, and not as a concrete sealer. Please advise if a concrete sealer from Benjamin

Moore would be an acceptable product in these custodial closets.

Yes, a concrete sealer from Benjamin Moore would be acceptable, but Benjamin Moore is not a required manufacturer.

80 5/4/2026

Architectural

The response to RFI #27 states that Terrazzo is part of the base bid. Keynote 2 specifies that the alternate was to install TZ2 and IB2 in lieu of TF1, TF2, and MB1 in Toilet

Rooms with flooring and RF1 and B2 in Dash Elevator

Lobbies. Please confirm that all Toilet Rooms and Dash

Elevator Lobbies are now to receive terrazzo flooring.

Confirmed, all toilet rooms and dash elevator lobbies are to receive terrazzo flooring.

1600103 NMNH Upgrade Sanitary and Storm Systems May 13, 2026

81 5/4/2026 electrical Please provide the model & serial number of the following existing electrical panels:

82 5/8/2026

Architectural

Drawing A-506DT shows the door schedule with hardware set numbers (0001 to 0009) but there is no hardware schedule in the specifications or drawings indicating the make-up of these sets. Please provide this information. Door hardware sets have been updated in Addendum 1.

The following information is provided for reference as a convinience.

Contracto to verify in field.

Main Building:

Panel A – Square D type NQ w/ Catalog No. / Factory Order No.

46434207743140001 Panel G8E – GE type A Series w/ Cat. No. AQF3302MTX AXQ3 Panel BC6 – Square D type NQ w/ Cat. # 12289171420010001 Panel EH3NL1 – Square D type NQ w/ Catalog No. / Factory Order No.

46434207744980001 Panel N3F2 – Square D type NQ Panel ER3NL2 – Cutler-Hammer Westinghouse type PRL1 Panel ER3NL3 – Square D type NQOB w/ Catalog No. NQOB-424 East Wing:

Panel 1EB2 – Square D type NQ w/ Catalog No. / Factory Order No.

29434207741780001 Panel L2A (located in East Court) – Cutler-Hammer Westinghouse type PRL2 Panel R2B (located in East Court) – Cutler-Hammer Westinghouse type PRL1 Panel 2EA – Square D type NQ w/ Catalog No. / Factory Order No.

46434207741900001 West Wing:

Panel 4WB1 – Square D type NQ w/ Catalog No. / Factory Order No.

46434207745750001 Panel WW6NL1 – Square D type NQOD w/ Cat. No. 12198711910070001

Federal Reserve Bank Building, 100 North 6th Street, Philadelphia, PA 19106 TEL 215.923.2020 FAX 215.574.9163 ewingcole.com

ADDENDUM 1

DATE:

PROJECT:

TO:

May 12th, 2026

Smithsonian Institution

NMNH Upgrade Sanitary & Storm Systems

SF Project 1600103

EC Project No. 20190809

Mauricio Rodriguez

Design Manager

Office of Facilities Engineering & Operations

Office of Planning, Design & Construction

600 Maryland Avenue, SW

Suite 5001

Washington, DC 20024-2540

Addendum No. 1

The following information shall modify the contract documents, and the work shall be accomplished in accordance with such stated modifications. It is suggested that this addendum be stapled to the back of the front cover of the project manual.

Specifications

1. Section 01 35 16 – ALTERATION PROJECT PROCEDURES

a. Page 7 of 14 - Remove 1.12.C.

2. Section 01 41 00 – TESTING AND INSPECTION SERVICES

a. Page 01 of 08 – 1.2A Revised as “Contractor”

b. Page 05 of 07 – 1.8 Revised as “Contractor”

c. Page 08 of 08 – 1.8.D.7 Revised as “Contractor”

3. Section 01 41 00 – STATEMENT OF SPECIAL INSPECTIONS

a. Page 02 of 17 – Revised table as “To be hired by Contactor”

4. Section 01 78 39 – PROJECT RECORD DOCUMENTS

a. Page 02 of 06 – 1.3.A – Revised as “Section 01 00 00”

b. Page 04 of 06 – 1.5.B.1.a. - Revised as “Section 01 00 00”

NMNH Sanitary and Storm System Upgrades

Addendum #1 – May 12, 2026

SF Project 1600103 / EC Project No. 20190809

5. Section 02 41 19 – SELECTIVE DEMOLITION

a. Page 02 of 08 – 1.5.D. - Revised as “Comply With Section 43 of the

Supplementary Condition for Construction.”

b. Page 03 of 08 – 1.7.D.1 – Revised as “Contractor”

6. Section 04 20 00 – UNIT MASONRY

a. Page 14 of 16. – 3.8.A. - Revised as “Contractor”

7. Section 08 11 13 – HOLLOW METAL DOOR FRAMES

a. Page 10 of 10 – 3.4.A. - Revised as “Contractor”

8. Section 08 71 00 – DOOR HARDWARE

a. Page 14-16 Added containing Door Hardware Set listings.

9. Section 10 14 23 – PANEL SIGNAGE

a. Page 03 of 07 - 2.2.A.2 - Revised as “Acrylic”

10. Section 22 05 00 – COMMON MATERIALS AND METHODS FOR PLUMBING

a. Page 02 of 29 – 1.5.A - Revised as “Section 01 00 00”

b. Page 02 of 29 – 1.5.B - Revised as "Section 01 00 00”

c. Page 02 of 29 – 1.6.B - Revised as “Section 01 00 00”

11. Section 22 10 00 – PLUMBING SYSTEMS

a. Page 02 of 11 – 1.5.A - Revised to “Division 01.”

12. Section 22 40 00 – PLUMBING FIXTURES AND TRIM

a. Page 01 of 04 – 1.4.A - Revised to “Section 01 00 00”

b. Page 02 of 04 – 1.6A - Revised to “Division 01”

13. Section 22 60 00 – PLUMBING – SPECIAL SYSTEMS

a. Page 01 of 03 - 1.3 SUBMITTALS revised.

i. B. For each plumbing fixture category and type specified, include selected unit, fittings, accessories, appliances, appliances, appurtenances, equipment and supports. Indicate materials and finishes, dimensions, construction details, and flow-control rates.

ii. C. Submit wiring diagrams from manufacturer for electrically operated units.

14. Section 23 05 00 – COMMON MATERIALS AND METHODS FOR HVAC

a. Page 02 of 27 – 1.5.A – Revised to “Section 01 00 00”

b. Page 02 of 27 – 1.5.B - Revised to “Section 01 00 00”

c. Page 02 of 27 – 1.6.A – Revised to “Division 01”

d. Page 04 of 27 – 1.11.A - Revised as “OFMR”

e. Page 04 of 27 – 1.11.B - Revised as “OFMR”

15. Section 23 25 00 – HVAC WATER TREATMENT

a. Page 02 of 07 – 1.6.A – Revised to “Division 01”

b. Page 03 of 07 – 1.11.A - Revised as “OFMR”

Page 03 of 07 – 1.11.B - Revised as “OFMR”

16. Section 23 30 00 – DUCTWORK AND DUCTWORK ACCESSORIES

a. Page 03 of 16 – 1.8.A – Revised as “OFMR”

b. Page 03 of 16 – 1.8.B – Revised as “OFMR”

17. Section 23 80 00 – HEAT TRANSFER

a. Page 02 of 02 – 1.5.A – Revised as “OFMR”

b. Page 02 of 02 – 1.5.B – Revised as “OFMR”

18. Section 26 05 00 -COMMON MATERIALS AND METHODS FOR ELECTRICAL

a. Page 02 of 13 – 1.5.A – Revised as “Section 01 00 00”

b. Page 02 of 13 – 1.5.B – Revised as “Section 01 00 00”

c. Page 02 of 13 – 1.6.B – Removed as “Division 00”

19. Section 31 20 00 – EARTH MOVING

a. Page 11 of 13 – 3.17.B – Revised as “Contractor”

Drawings

REPLACE EACH sheet with revised sheet dated May 12th, 2026.

Volume 1:

1. Sheet G-002SH

a. Update drawing index to indicate which drawings are issued as part of Addendum #1.

2. Sheet G-003SH

3. Sheet G-004SH

4. Sheet G-100

a. Reconfigured schedule to incorporate the following information:

i. Updated Suggested Phasing to incorporate Plumbing Logistics and Phasing and additional NMNH specific language.

ii. Updated General Phasing Note 3. To incorporate peak visitor months. March through September.

iii. Updating General Phasing Note Numbering 9-19.

5. Sheet G-102

a. Updated access hatch dimensions.

b. AH-3 to have terrazzo infill.

6. Sheet H-100

a. Revised Remediation Recommendations to replace encapsulate language with abatement.

b. Terrazzo accepted as Base Bid.

7. Sheet H-401

a. Revised Abatement Notes to replace encapsulate language with abatement.

8. Sheet H-402

9. Sheet H-403

10. Sheet H-404

11. Sheet C-100

a. Updated tree designation per Planting schedule on C-105

12. Sheet C-101

13. Sheet C-104

14. Sheet C-106

15. Sheet C-107

16. Sheet C-110

17. Sheet A-401EP

a. Revised elevation annotations to incorporate integral base.

18. Sheet A-401CP

a. Updated dimensions for attic stair.

19. Sheet A-401IE

20. Sheet A-402EP

a. Updated wall tag locations.

21. Sheet A-402IE

22. Sheet A-403EP

23. Sheet A-404EP

24. Sheet A-407EP

25. Sheet A-407IE

26. Sheet A-408IE

27. Sheet A-409IE

28. Sheet A-410IE

29. Sheet A-411IE

30. Sheet A-412E

31. Sheet A-413IE

32. Sheet A-414IE

33. Sheet A-415IE

34. Sheet A-416IE

35. Sheet A-417EP

36. Sheet A-417IE

37. Sheet A-418EP

b. Updated Demo note 6 to be 7.

38. Sheet A-418IE

39. Sheet A-419IE

40. Sheet A-420IE

41. Sheet A-421IE

42. Sheet A-422EP

43. Sheet A-422IE

44. Sheet A-423IE

45. Sheet A-424IE

46. Sheet A-425EP

47. Sheet A-506DT

a. Update Head and Jamb information in Door Schedule.

48. Sheet I-001SH

a. Updated Finish Legend Material Codes and Finish Keynotes to reflect changes for accepted add alternate scope.

b. Updated Finish Schedule to reflect accepted add alternate scope.

c. Added location for TZ1 scope at access hatches.

49. Sheet I-002SH accepted add alternate scope.

b. Updated spec section reference for millwork surfaces .

50. Sheet I-003SH

a. Updated details C4, C7, and J4 to reflect accepted add alternate.

b. Removed details A4, A7, and J7 to reflect accepted add alternate. Details no longer used.

c. Moved detail C1 to reflect accepted add alternate. See detail A1.

51. Sheet I-401NP accepted add alternate scope.

b. Updated Finish Plans to reflect changes for accepted add alternate scope.

c. Updated Finish Plans to capture corner guard scope.

52. Sheet I-402NP accepted add alternate scope.

53. Sheet I-403NP accepted add alternate scope.

54. Sheet I-404NP accepted add alternate scope.

55. Sheet I-405NP accepted add alternate scope.

56. Sheet I-406NP accepted add alternate scope.

57. Sheet I-601NP

a. Updated Floor Pattern Legend Material Codes and Finish Keynotes to reflect changes for accepted add alternate scope.

b. Updated Floor Pattern Plans to reflect changes for accepted add alternate scope.

58. Sheet I-602NP

59. Sheet I-603NP

60. Sheet I-601SH

a. Removed sign type T-3. No longer used.

61. Sheet S-100FP

a. Added Section designations for foundation penetrations.

62. Sheet S-301SC

a. Added East and West Wing Foundation Wall Penetration Section.

b. Updated section title naming.

63. Sheet M-401DP

a. Existing ductwork was modeled and annotated in Women’s Restroom TMG01

b. Existing ductwork was modeled and annotated in Men’s Restroom TMG02

64. Sheet M-402EP

a. New ductwork was modeled in Women’s Restroom TMG01

Volume 2:

65. Sheet P-001

a. Updated general note number 7 and number 11.

66. Sheet P-002

a. Adjusted the titles from “Phases” to “Implementation Steps” for each riser view.

b. Added further direction for contractors on riser views and logistic notes.

67. Sheet P-003

68. Sheet P-004

c. Added note regarding storm stacks in collection areas.

69. Sheet P-005

b. Added further direction for contractors in logistic notes.

c. Adjusted view title and sheet title.

70. Sheet P-006

b. Added further direction for contractors in logistic notes.

c. Adjusted view title and sheet title.

71. Sheet P-007

b. Added further direction for contractors in logistic notes

c. Adjusted view title and sheet title

72. Sheet P-008

c. Adjusted view title and sheet title

73. Sheet P-009

74. Sheet P-010

75. Sheet PD-1WHT

a. Adjusted keynote near grid WH/7.

76. Sheet PD-1WH2

a. Adjusted keynotes near grids WH/1 & WH/9.

77. Sheet PD-1WRRN

a. Added “FOR INFORMATION ONLY”

78. Sheet PD-1EW2N

a. Adjusted keynote in between grids EW/19 & EW/20.

79. Sheet PD-1EW2S

a. Adjusted keynote near grid EW/17.

80. Sheet PD-1EW3N

a. Adjusted keynote near grid EW/17.

81. Sheet PD-1EW4S

a. Adjusted keynote near grid EW/G

82. Sheet PD-1EW6S

a. Adjusted note near grid EW/17

83. Sheet PD-1EWR

84. Sheet PD-1WWBN

85. Sheet PD-1WWBS

86. Sheet PD-1WW0S

87. Sheet PD-1WW1S

a. Adjusted note in between grids WW/4 & WW/5.

88. Sheet PD-1WW2N

a. Adjusted note near grid WW/3

89. Sheet PD-1WW5S

a. Adjusted keynote near grid WW/6

90. Sheet P-503

a. Adjusted sheet title

91. Sheet P-504

a. Adjusted sheet title

EwingCole

Troy Varner AIA, NCARB

DIRECT 215.625.4614

EMAIL tvarner@ewingcole.com cc: Abby Tourellotte, EC pãáíÜëçåá~å=c~ÅáäáíáÉë= SMM=j~êóä~åÇ=^îÉåìÉ=pKtK=pìáíÉ=RMMN t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå

GRAPHIC SCALE(S)

SHEET NO.

OF

PROJECT TITLE

A/E PROJECT NUMBER

ADDRESS

BUILDING NAME

SF PROJECT NUMBER

DRAWING TITLE

WORKING STAFF

STAMP

DATE SUBMISSION

A

B

C

D

E

F

G

H

J

K

A

B

C

D

E

F

G

H

J

K

REVISION # DATE REVISION DESCRIPTION

TYPE

DRAWN BY

SEQUENCEDISCIPLINE

CHECKED BYDESIGNED BY

Federal Reserve Bank Building

100 N. 6th Street

Philadelphia, PA 19106

Tel: 215-923-2020

Fax: 215-574-9163 kjke rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp clo= `lkpqor`qflk

:5 :0

P

M DRAWING LIST - VOLUME #1

20190809

UPGRADE SANITARY AND STORM

SYSTEMS

12/05/25 BID SET ISSUANCE

G S H

B Y

A p p ro v e r

B

ID

S E T

IS

S U A N C

E NATIONAL MUSEUM OF NATURAL

HISTORY

10TH STREET & CONSTITUTION

AVE, WASHINGTON DC, 20560

1600103

PP/BK TVPP/BK

G-002SH

2 533

Sheet

Number Sheet Name A D

D E

N D

U M

00 - General

G-001CS COVER SHEET

G-002SH DRAWING LIST - VOLUME #1 X

G-003SH DRAWING LIST - VOLUME #2 X

G-004SH DRAWING LIST - VOLUME #3 X

G-005SH PROJECT DATA

G-006SH CODE STUDY

G-007SH MOUNTING HEIGHTS & CLEARANCES

G-100 CONSTRUCTION LOGISTICS SUGGESTED PHASING PLAN X

G-101 CONSTRUCTION LOGISTICS STAGING PLANS

G-102 CONSTRUCTION LOGISTICS PLANS - ACCESS HATCHES X

G-103 CONSTRUCTION LOGISTICS PLANS - MAIN BUILDING

G-104 CONSTRUCTION LOGISTICS PLANS - MAIN BUILDING

G-105 CONSTRUCTION LOGISTICS PLANS - EAST WING

G-106 CONSTRUCTION LOGISTICS PLANS - WEST WING

01 - Hazmat

H-100 HAZARDOUS MATERIALS LOGISTICS X

H-101 HAZARDOUS MATERIALS ATTIC ABATEMENT PLAN

H-401 HAZARDOUS MATERIALS ABATEMENT PLANS X

H-402 HAZARDOUS MATERIALS ABATEMENT PLANS X

H-403 HAZARDOUS MATERIALS ABATEMENT PLANS X

H-404 HAZARDOUS MATERIALS ABATEMENT PLANS X

02 - Civil

C-000 COVER SHEET

C-100 DEMOLITION AND RESTORATION - AREA 1 X

C-101 DEMOLITION AND RESTORATION - AREA 2&3 X

C-102 DEMOLITION AND RESTORATION - AREA 4

C-103 DEMOLITION AND RESTORATION - AREA 5

C-104 DEMOLITION AND RESTORATION - AREA 6 X

C-105 DEMOLITION AND RESTORATION - AREA 7

C-106 UTILITY PLAN - AREA 1 X

C-107 UTILITY PLAN - AREA 2&3 X

C-108 UTILITY PLAN - AREA 4

C-109 UTILITY PLAN - AREA 5

C-110 UTILITY PLAN - AREA 6 X

C-111 UTILITY PLAN - AREA 7

C-112 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 1

C-113 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 2&3

C-114 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 4

C-115 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 5

C-116 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 6

C-117 EROSION AND SEDIMENT CONTROL - EXCAVATION AREA 7

C-118 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 1

C-119 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 2&3

C-120 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 4

C-121 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 5

C-122 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 6

C-123 MAINTENANCE OF TRAFFIC/LOGISTICS PLAN - AREA 7

C-124 STORM DRAIN PROFILES

C-125 STORM DRAIN PROFILES

C-501 EROSION & SEDIMENT CONTROL

C-500 SITE DETAILS

C-502 EROSION & SEDIMENT CONTROL

C-503 EROSION & SEDIMENT CONTROL

C-504 EROSION & SEDIMENT CONTROL

C-505 EROSION & SEDIMENT CONTROL

04 - Architectural

A-100FP A-BASEMENT - REFERENCE PLAN

A-101FP B-GROUND FLOOR - REFERENCE PLAN

A-102FP C-GROUND FLOOR MEZZANINE - REFERENCE PLAN

A-103FP D-FIRST FLOOR - REFERENCE PLAN

A-104FP E-FIRST FLOOR MEZZANINE - REFERENCE PLAN

A-105FP F-SECOND FLOOR - REFERENCE PLAN

A-106FP G-SECOND FLOOR MEZZANINE - REFERENCE PLAN

A-107FP H-THIRD FLOOR - REFERENCE PLAN

A-108FP J-ATTIC AND PENTHOUSE - REFERENCE PLAN

A-109FP K-MECHANICAL AND ROOF- REFERENCE PLAN

A-401DP ENLARGED DEMOLITION PLANS - GROUND FLOOR - MAIN BUILDING - NORTH HALL - RESTROOMS

A-401EP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - RESTROOMS X

A-401CP REFLECTED CEILING PLANS - MAIN BUILDING - NORTH HALL - RESTROOMS X

A-401IE INTERIOR ELEVATIONS - MAIN BUILDING - NORTH HALL - RESTROOMS X

A-402EP ENLARGED PLANS - MAIN BUILDING - WEST HALL - GROUND FLOOR - RESTROOMS X

A-402IE INTERIOR ELEVATIONS - MAIN BUILDING - WEST HALL - GROUND FLOOR - RESTROOMS X

A-403EP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - 3RD FLOOR - WOMENS RESTROOM X

A-404EP ENLARGED PLANS - MAIN BUILDING - EAST RANGE - 3RD FLOOR - RESTROOM X

A-405EP ENLARGED PLANS - MAIN BUILDING - EAST RANGE - 3RD FLOOR - ROSE ROOM PANTRY

A-406EP ENLARGED PLANS - MAIN BUILDING - EAST HALL - 3RD FLOOR - PANTRY

A-407EP ENLARGED PLANS - EAST WING DASH - 1ST FLOOR - RESTROOMS X

A-407IE INTERIOR ELEVATIONS - EAST WING DASH - 1ST FLOOR - RESTROOMS X

A-408EP ENLARGED PLANS - EAST WING - 1ST FLOOR - RESTROOMS

A-408IE INTERIOR ELEVATIONS - EAST WING - 1ST FLOOR - RESTROOMS X

A-409EP ENLARGED PLANS - EAST WING DASH - 2ND FLOOR - RESTROOMS

A-409IE INTERIOR ELEVATIONS - EAST WING DASH - 2ND FLOOR - RESTROOMS X

A-410EP ENLARGED PLANS - EAST WING - 2ND FLOOR - RESTROOMS

A-410IE INTERIOR ELEVATIONS - EAST WING - 2ND FLOOR - RESTROOMS X

A-411EP ENLARGED PLANS - EAST WING DASH - 3RD FLOOR - RESTROOMS

A-411IE INTERIOR ELEVATIONS - EAST WING DASH - 3RD FLOOR - RESTROOMS X

A-412EP ENLARGED PLANS - EAST WING - 3RD FLOOR - RESTROOMS

A-412IE INTERIOR ELEVATIONS - EAST WING - 3RD FLOOR - RESTROOMS X

A-413EP ENLARGED PLANS - EAST WING DASH - 4TH FLOOR - RESTROOMS

A-413IE INTERIOR ELEVATIONS - EAST WING DASH - 4TH FLOOR - RESTROOMS X

A-414EP ENLARGED PLANS - EAST WING - 4TH FLOOR - RESTROOM

A-414IE INTERIOR ELEVATIONS - EAST WING - 4TH FLOOR - RESTROOM X

A-415EP ENLARGED PLANS - EAST WING DASH - 5TH FLOOR - RESTROOMS

A-415IE INTERIOR ELEVATIONS - EAST WING DASH - 5TH FLOOR - RESTROOMS X

A-416EP ENLARGED PLANS - EAST WING - 5TH FLOOR - RESTROOMS

A-416IE INTERIOR ELEVATIONS - EAST WING - 5TH FLOOR - RESTROOMS X

A-417EP ENLARGED PLANS - EAST WING DASH - 6TH FLOOR - RESTROOMS X

A-417IE INTERIOR ELEVATIONS - EAST WING DASH - 6TH FLOOR - RESTROOMS X

A-418EP ENLARGED PLANS - WEST WING DASH - 3RD FLOOR - RESTROOMS X

A-418IE INTERIOR ELEVATIONS - WEST WING DASH - 3RD FLOOR - RESTROOMS X

A-419EP ENLARGED PLANS - WEST WING - 3RD FLOOR - RESTROOMS

Sheet

Number Sheet Name A D

D E

N D

U M

A-419IE INTERIOR ELEVATIONS - WEST WING - 3RD FLOOR - RESTROOMS X

A-420EP ENLARGED PLANS - WEST WING DASH - 4TH FLOOR - RESTROOMS

A-420IE INTERIOR ELEVATIONS - WEST WING DASH - 4TH FLOOR - RESTROOMS X

A-421EP ENLARGED PLANS - WEST WING - 4TH FLOOR - RESTROOMS

A-421IE INTERIOR ELEVATIONS - WEST WING - 4TH FLOOR - RESTROOMS X

A-422EP ENLARGED PLANS - WEST WING DASH - 5TH FLOOR - RESTROOMS X

A-422IE INTERIOR ELEVATIONS - WEST WING DASH - 5TH FLOOR - RESTROOMS X

A-423EP ENLARGED PLANS - WEST WING - 5TH FLOOR - RESTROOMS

A-423IE INTERIOR ELEVATIONS - WEST WING - 5TH FLOOR - RESTROOMS X

A-424EP ENLARGED PLANS -WEST WING DASH - 6TH FLOOR - RESTROOMS

A-424IE INTERIOR ELEVATIONS -WEST WING DASH - 6TH FLOOR - RESTROOMS X

A-425EP ENLARGED PLANS - EAST COURT - 2ND FLOOR - RESTROOM X

A-426EP ENLARGED PLANS - MISCELLANEOUS AREAS

A-501DT PARTITION DETAILS

A-502DT PARTITION DETAILS

A-503DT PLAN DETAILS

A-504DT CASEWORK DETAILS

A-505DT CASEWORK DETAILS

A-506DT DOOR DETAILS X

A-507DT CEILING DETAILS

05 - Interiors

I-001SH GENERAL FINISH NOTES & INTERIOR FINISH SCHEDULE 1 OF 2 X

I-002SH INTERIOR FINISH SCHEDULE 2 OF 2 X

I-003SH INTERIOR FINISH & TRANSITION DETAILS X

I-401NP FINISH PLANS - MAIN BUILDING - RESTROOMS X

I-402NP FINISH PLANS - MAIN BUILDING - PANTRIES, MISCELLANEOUS AREAS & EAST COURT RESTROOM X

I-403NP FINISH PLANS - EAST WING - RESTROOMS X

I-404NP FINISH PLANS - EAST WING DASH - RESTROOMS X

I-405NP FINISH PLANS - WEST WING - RESTROOMS X

I-406NP FINISH PLANS - WEST WING DASH - RESTROOMS X

I-601NP FLOOR PATTERN PLANS - MAIN BUILDING - RESTROOMS AND PANTRIES X

I-602NP FLOOR PATTERN PLANS - EAST COURT, EAST WING AND EAST WING DASH - RESTROOMS X

I-603NP FLOOR PATTERN PLANS - WEST WING AND WEST WING DASH - RESTROOMS X

I-601SH INTERIOR SIGNAGE - GENERAL NOTES, SIGNAGE SCHEDULE & DETAILS X

I-601EP SIGNAGE LOCATION PLANS - MAIN BUILDING - RESTROOMS

I-602EP SIGNAGE LOCATION PLANS - MAIN BUILDING - PANTRIES & RESTROOM

I-603EP SIGNAGE LOCATION PLANS - EAST WING - RESTROOMS

I-604EP SIGNAGE LOCATION PLANS - EAST WING DASH - RESTROOMS

I-605EP SIGNAGE LOCATION PLANS - WEST WING - RESTROOMS

I-606EP SIGNAGE LOCATION PLANS - WEST WING DASH - RESTROOMS

06 - Structural

S-001 GENERAL STRUCTURAL NOTES & STRUCTURAL INDEX SHEET

S-002 GENERAL STRUCTURAL NOTES, DESIGN CRITERIA, & ABBREVIATIONS

S-100 FP GROUND FLOOR AND TUNNEL ACCESS REFERENCE PLAN X

S-401 FP NORTH HALL RESTROOM ENLARGED PLANS

S-402 FP WEST HALL RESTROOM ENLARGED PLANS

S-403 FP 3RD FLOOR NORTH HALL RESTROOM ENLARGED PLANS

S-404 FP EAST WING DASH RESTROOMS ENLARGED PLANS

S-405 FP EAST WING RESTROOMS ENLARGED PLANS

S-406 FP WEST WING DASH RESTROOMS ENLARGED PLANS

S-407 FP WEST WING RESTROOMS ENLARGED PLANS

S-408 FP EAST COURT RESTROOMS ENLARGED PLANS

S-301 SC STRUCTURAL SECTIONS X

S-501 DT TYPICAL STRUCTURAL DETAILS

07 - HVAC

M-001CS HVAC INDEX SHEET

M-002CS HVAC GENERAL NOTES

MD101DP DEMOLITION PLAN - MAIN BUILDING - EAST HALL ATTIC

MD102DP DEMOLITION PLAN - MAIN BUILDING - NORTH HALL - NORTH ATTIC

MD103DP DEMOLITION PLAN - MAIN BUILDING - NORTH HALL - SOUTH ATTIC

MD104DP DEMOLITION PLAN - MAIN BUILDING - WEST HALL - ATTIC

MH101HP MAIN BUILDING - EAST HALL - ATTIC DUCTWORK

MH102HP MAIN BUILDING - NORTH HALL - NORTH ATTIC DUCTWORK

MH103HP MAIN BUILDING - NORTH HALL - SOUTH ATTIC DUCTWORK

MH104HP MAIN BUILDING - WEST HALL - ATTIC DUCTWORK

MP101PP MAIN BUILDING - EAST HALL - ATTIC PIPING

M-401DP ENLARGED DEMOLITION PLANS - GROUND FLOOR - MAIN BUILDING - NORTH LOBBY X

M-402EP ENLARGED PLANS - GROUND FLOOR - MAIN BUILDING - NORTH LOBBY X

M-403EP ENLARGED PLANS - MAIN BUILDING

M-404EP ENLARGED PLANS - EAST WING - 1ST FLOOR

M-405EP ENLARGED PLANS - EAST WING - 2ND FLOOR

M-406EP ENLARGED PLANS - EAST WING - 3RD FLOOR

M-407EP ENLARGED PLANS - EAST WING - 4TH FLOOR

M-408EP ENLARGED PLANS - EAST WING - 5TH FLOOR

M-409EP ENLARGED PLANS - EAST WING DASH - 6TH FLOOR

M-410EP ENLARGED PLANS - WEST WING - 3RD FLOOR

M-411EP ENLARGED PLANS - WEST WING - 4TH FLOOR

M-412EP ENLARGED PLANS - WEST WING - 5TH FLOOR

M-413EP ENLARGED PLANS - WEST WING DASH - 6TH FLOOR

M-414EP ENLARGED PLANS - EAST COURT - 2ND FLOOR

M-501DT HVAC DETAILS

M-601SH HVAC SCHEDULES

M-801CP HVAC CONTROL DIAGRAMS

VOLUME #1 - GENERAL HAZMAT, CIVIL, ARCHITECTURAL, INTERIORS, STRUCTURAL, HVAC

1 05/12/26 ADDENDUM #1

tvarner Text Box X tvarner Text Box X tvarner Text Box X tvarner Text Box X tvarner Text Box X tvarner Text Box X tvarner Text Box X tvarner Text Box X t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå

GRAPHIC SCALE(S)

SHEET NO.

OF

PROJECT TITLE

A/E PROJECT NUMBER

ADDRESS

BUILDING NAME

SF PROJECT NUMBER

DRAWING TITLE

WORKING STAFF

STAMP

DATE SUBMISSION

A

B

C

D

E

F

G

H

J

K

A

B

C

D

E

F

G

H

J

K

REVISION # DATE REVISION DESCRIPTION

TYPE

DRAWN BY

SEQUENCEDISCIPLINE

CHECKED BYDESIGNED BY

Federal Reserve Bank Building

100 N. 6th Street

Philadelphia, PA 19106

Tel: 215-923-2020

Fax: 215-574-9163 kjke rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp clo= `lkpqor`qflk

:5 :0

P

M DRAWING LIST - VOLUME #2

20190809

UPGRADE SANITARY AND STORM

SYSTEMS

12/05/25 BID SET ISSUANCE

G S H

B Y

A p p ro v e r

B

ID

S E T

IS

S U A N C

E NATIONAL MUSEUM OF NATURAL

HISTORY

10TH STREET & CONSTITUTION

AVE, WASHINGTON DC, 20560

1600103

PP/BK TVPP/BK

G-003SH

3 533

Sheet Number Sheet Name A

D D

E N

D U

M

PD-1WW1S WEST WING - FIRST FLOOR - SOUTH - DEMOLITION PLAN X

PD-1WW2N WEST WING - SECOND FLOOR - NORTH - DEMOLITION PLAN X

PD-1WW2S WEST WING - SECOND FLOOR - SOUTH - DEMOLITION PLAN

PD-1WW3N WEST WING - THIRD FLOOR - NORTH - DEMOLITION PLAN

PD-1WW3S WEST WING - THIRD FLOOR - SOUTH - DEMOLITION PLAN

PD-1WW4N WEST WING - FOURTH FLOOR - NORTH - DEMOLITION PLAN

PD-1WW4S WEST WING - FOURTH FLOOR - SOUTH - DEMOLITION PLAN

PD-1WW5N WEST WING - FIFTH FLOOR - NORTH - DEMOLITION PLAN

PD-1WW5S WEST WING - FIFTH FLOOR - SOUTH - DEMOLITION PLAN X

PD-1WW6N WEST WING - SIXTH FLOOR - NORTH - DEMOLITION PLAN

PD-1WW6S WEST WING - SIXTH FLOOR - SOUTH - DEMOLITION PLAN

PD-1WWP WEST WING - PENTHOUSE - DEMOLITION PLAN

PD-1WWR WEST WING - ROOF - DEMOLITION PLAN

P-1ROT MAIN BUILDING - ROTUNDA - TUNNEL PLAN

P-1RO0 MAIN BUILDING - ROTUNDA - GROUND FLOOR PLAN

P-1RO0M MAIN BUILDING - ROTUNDA - GROUND FLOOR MEZZANINE PLAN

P-1RO1 MAIN BUILDING - ROTUNDA - FIRST FLOOR PLAN

P-1RO2 MAIN BUILDING - ROTUNDA - SECOND FLOOR PLAN

P-1RO3 MAIN BUILDING - ROTUNDA - THIRD FLOOR PLAN

P-1ROA MAIN BUILDING - ROTUNDA - ATTIC PLAN

P-1ROP MAIN BUILDING - ROTUNDA - PENTHOUSE PLAN

P-1ROR MAIN BUILDING - ROTUNDA - ROOF PLAN

P-1NHTN MAIN BUILDING - NORTH HALL - TUNNEL - NORTH - PLAN

P-1NHTS MAIN BUILDING - NORTH HALL - TUNNEL - SOUTH - PLAN

P-1NH0N MAIN BUILDING - NORTH HALL - GROUND FLOOR - NORTH - PLAN

P-1NH0S MAIN BUILDING - NORTH HALL - GROUND FLOOR - SOUTH - PLAN

P-1NH1N MAIN BUILDING - NORTH HALL - FIRST FLOOR - NORTH - PLAN

P-1NH1S MAIN BUILDING - NORTH HALL - FIRST FLOOR - SOUTH - PLAN

P-1NH2N MAIN BUILDING - NORTH HALL - SECOND FLOOR - NORTH - PLAN

P-1NH2S MAIN BUILDING - NORTH HALL - SECOND FLOOR - SOUTH - PLAN

P-1NH3N MAIN BUILDING - NORTH HALL - THIRD FLOOR - NORTH - PLAN

P-1NH3S MAIN BUILDING - NORTH HALL - THIRD FLOOR - SOUTH - PLAN

P-1NHAN MAIN BUILDING - NORTH HALL - ATTIC - NORTH - PLAN

P-1NHAS MAIN BUILDING - NORTH HALL - ATTIC - SOUTH - PLAN

P-1NHRN MAIN BUILDING - NORTH HALL - ROOF - NORTH - PLAN

P-1NHRS MAIN BUILDING - NORTH HALL - ROOF - SOUTH - PLAN

P-1EHT MAIN BUILDING - EAST HALL - TUNNEL PLAN

P-1EH0 MAIN BUILDING - EAST HALL - GROUND FLOOR PLAN

P-1EH0M MAIN BUILDING - EAST HALL - GROUND FLOOR MEZZANINE PLAN

P-1EH1 MAIN BUILDING - EAST HALL - FIRST FLOOR PLAN

P-1EH2 MAIN BUILDING - EAST HALL - SECOND FLOOR PLAN

P-1EH3 MAIN BUILDING - EAST HALL - THIRD FLOOR PLAN

P-1EHA MAIN BUILDING - EAST HALL - ATTIC PLAN

P-1EHR MAIN BUILDING - EAST HALL - ROOF PLAN

P-1WHT MAIN BUILDING - WEST HALL - TUNNEL PLAN

P-1WH0 MAIN BUILDING - WEST HALL - GROUND FLOOR PLAN

P-1WH0M MAIN BUILDING - WEST HALL - GROUND FLOOR MEZZANINE PLAN

P-1WH1 MAIN BUILDING - WEST HALL - FIRST FLOOR PLAN

P-1WH2 MAIN BUILDING - WEST HALL - SECOND FLOOR FLOOR PLAN

P-1WH3 MAIN BUILDING - WEST HALL - THIRD FLOOR PLAN

P-1WHA MAIN BUILDING - WEST HALL - ATTIC FLOOR PLAN

P-1WHR MAIN BUILDING - WEST HALL - ROOF PLAN

P-1ERTN MAIN BUILDING - EAST RANGE - TUNNEL - NORTH - PLAN

P-1ERTS MAIN BUILDING - EAST RANGE - TUNNEL - SOUTH - PLAN

P-1ER0N MAIN BUILDING - EAST RANGE - GROUND FLOOR - NORTH - PLAN

P-1ER0S MAIN BUILDING - EAST RANGE - GROUND FLOOR - SOUTH - PLAN

P-1ER0MN MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - NORTH - PLAN

P-1ER0MS MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - SOUTH - PLAN

P-1ER1N MAIN BUILDING - EAST RANGE - FIRST FLOOR - NORTH - PLAN

P-1ER1S MAIN BUILDING - EAST RANGE - FIRST FLOOR - SOUTH - PLAN

P-1ER2N MAIN BUILDING - EAST RANGE - SECOND FLOOR - NORTH - PLAN

P-1ER2S MAIN BUILDING - EAST RANGE - SECOND FLOOR - SOUTH - PLAN

P-1ER3N MAIN BUILDING - EAST RANGE - THIRD FLOOR - NORTH - PLAN

P-1ER3S MAIN BUILDING - EAST RANGE - THIRD FLOOR - SOUTH - PLAN

P-1ERAN MAIN BUILDING - EAST RANGE - ATTIC - NORTH - PLAN

P-1ERAS MAIN BUILDING - EAST RANGE - ATTIC - SOUTH - PLAN

P-1ERRN MAIN BUILDING - EAST RANGE - ROOF - NORTH - PLAN

P-1ERRS MAIN BUILDING - EAST RANGE - ROOF - SOUTH - PLAN

P-1WRTN MAIN BUILDING - WEST RANGE - TUNNEL - NORTH - PLAN

P-1WRTS MAIN BUILDING - WEST RANGE - TUNNEL - SOUTH - PLAN

P-1WR0N MAIN BUILDING - WEST RANGE - GROUND FLOOR - NORTH - PLAN

P-1WR0S MAIN BUILDING - WEST RANGE - GROUND FLOOR - SOUTH - PLAN

P-1WR0MN MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - NORTH - PLAN

P-1WR0MS MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - SOUTH - PLAN

P-1WR1N MAIN BUILDING - WEST RANGE - FIRST FLOOR - NORTH - PLAN

P-1WR1S MAIN BUILDING - WEST RANGE - FIRST FLOOR - SOUTH - PLAN

P-1WR2N MAIN BUILDING - WEST RANGE - SECOND FLOOR - NORTH - PLAN

P-1WR2S MAIN BUILDING - WEST RANGE - SECOND FLOOR - SOUTH - PLAN

P-1WR3N MAIN BUILDING - WEST RANGE - THIRD FLOOR - NORTH - PLAN

P-1WR3S MAIN BUILDING - WEST RANGE - THIRD FLOOR - SOUTH - PLAN

P-1WRAN MAIN BUILDING - WEST RANGE - ATTIC - NORTH - PLAN

P-1WRAS MAIN BUILDING - WEST RANGE - ATTIC - SOUTH - PLAN

P-1WRRN MAIN BUILDING - WEST RANGE - ROOF - NORTH - PLAN

P-1WRRS MAIN BUILDING - WEST RANGE - ROOF - SOUTH - PLAN

P-1EWBN EAST WING - BASEMENT - NORTH - PLAN

P-1EWBS EAST WING - BASEMENT - SOUTH - PLAN

P-1EW0N EAST WING - GROUND FLOOR - NORTH - PLAN

P-1EW0S EAST WING - GROUND FLOOR - SOUTH - PLAN

P-1EW1N EAST WING - FIRST FLOOR - NORTH - PLAN

P-1EW1S EAST WING - FIRST FLOOR - SOUTH - PLAN

P-1EW2N EAST WING - SECOND FLOOR - NORTH - PLAN

P-1EW2S EAST WING - SECOND FLOOR - SOUTH - PLAN

P-1EW3N EAST WING - THIRD FLOOR - NORTH - PLAN

P-1EW3S EAST WING - THIRD FLOOR - SOUTH - PLAN

P-1EW4N EAST WING - FOURTH FLOOR - NORTH - PLAN

P-1EW4S EAST WING - FOURTH FLOOR - SOUTH - PLAN

P-1EW5N EAST WING - FIFTH FLOOR - NORTH - PLAN

P-1EW5S EAST WING - FIFTH FLOOR - SOUTH - PLAN

P-1EW6N EAST WING - SIXTH FLOOR - NORTH - PLAN

P-1EW6S EAST WING - SIXTH FLOOR - SOUTH - PLAN

P-1EWP EAST WING - PENTHOUSE PLAN

P-1EWR EAST WING - ROOF PLAN

P-1WWBN WEST WING - BASEMENT - NORTH - PLAN

P-1WWBS WEST WING - BASEMENT - SOUTH - PLAN

P-1WW0N WEST WING - GROUND FLOOR - NORTH - PLAN

P-1WW0S WEST WING - GROUND FLOOR - SOUTH - PLAN

P-1WW1N WEST WING - FIRST FLOOR - NORTH - PLAN

P-1WW1S WEST WING - FIRST FLOOR - SOUTH - PLAN

Sheet Number Sheet Name A

D D

E N

D U

M

P-1WW2N WEST WING - SECOND FLOOR - NORTH - PLAN

P-1WW2S WEST WING - SECOND FLOOR - SOUTH - PLAN

P-1WW3N WEST WING - THIRD FLOOR - NORTH - PLAN

P-1WW3S WEST WING - THIRD FLOOR - SOUTH - PLAN

P-1WW4N WEST WING - FOURTH FLOOR - NORTH - PLAN

P-1WW4S WEST WING - FOURTH FLOOR - SOUTH - PLAN

P-1WW5N WEST WING - FIFTH FLOOR - NORTH - PLAN

P-1WW5S WEST WING - FIFTH FLOOR - SOUTH - PLAN

P-1WW6N WEST WING - SIXTH FLOOR - NORTH - PLAN

P-1WW6S WEST WING - SIXTH FLOOR - SOUTH - PLAN

P-1WWP WEST WING - PENTHOUSE PLAN

P-1WWR WEST WING - ROOF PLAN

P-500 PLUMBING DETAILS

P-501 PLUMBING SCHEDULES

P-502 PLUMBING SCHEDULES

P-503 PLUMBING RESTROOMS DETAILS - EAST WING X

P-504 PLUMBING DETAILS - EAST WING SINKS X

P-505 PLUMBING DETAILS

P-506 PLUMBING DETAILS

P-6RO1 MAIN BUILDING - ROTUNDA - STORM RISER DIAGRAM

P-6RO2 MAIN BUILDING - ROTUNDA - SANITARY RISER DIAGRAM

P-6NH1 MAIN BUILDING - NORTH HALL - STORM RISER DIAGRAM

P-6NH2 MAIN BUILDING - NORTH HALL - SANITARY RISER DIAGRAM

P-6EH1 MAIN BUILDING - EAST HALL - STORM RISER DIAGRAM

P-6EH2 MAIN BUILDING - EAST HALL - SANITARY RISER DIAGRAM

P-6ER1 MAIN BUILDING - EAST RANGE - STORM RISER DIAGRAM

P-6ER2 MAIN BUILDING - EAST RANGE - SANITARY RISER DIAGRAM

P-6WH1 MAIN BUILDING - WEST HALL - STORM RISER DIAGRAM

P-6WH2 MAIN BUILDING - WEST HALL - SANITARY RISER DIAGRAM

P-6WR1 MAIN BUILDING - WEST RANGE - STORM RISER DIAGRAM

P-6WR2 MAIN BUILDING - WEST RANGE - SANITARY RISER DIAGRAM

P-6EW1 EAST WING - STORM RISER DIAGRAM

P-6EW2N EAST WING - SANITARY RISER DIAGRAM - NORTH

P-6EW2S EAST WING - SANITARY RISER DIAGRAM - SOUTH

P-6EW3N EAST WING - DOMESTIC WATER RISER DIAGRAM - NORTH

P-6EW3S EAST WING - DOMESTIC WATER RISER DIAGRAM - SOUTH

P-6EW4 EAST WING - SANITARY PARTIAL RISER DIAGRAMS - NEW RESTROOMS

P-6EW5 EAST WING - DOMESTIC WATER PARTIAL RISER DIAGRAMS - NEW RESTROOMS

P-6WW1 WEST WING - STORM RISER DIAGRAM

P-6WW2N WEST WING - SANITARY RISER DIAGRAM - NORTH

P-6WW2S WEST WING - SANITARY RISER DIAGRAM - SOUTH

P-6WW3N WEST WING - DOMESTIC WATER RISER DIAGRAM - NORTH

P-6WW3S WEST WING - DOMESTIC WATER RISER DIAGRAM - SOUTH

P-6WW4 WEST WING - SANITARY PARTIAL RISER DIAGRAMS - NEW RESTROOMS

P-6WW5 WEST WING - DOMESTIC WATER PARTIAL RISER DIAGRAMS - NEW RESTROOMS

P-6EC1 EAST COURT - STORM RISER DIAGRAM

P-6WC1 WEST COURT - STORM RISER DIAGRAM

VOLUME #2: PLUMBING

Sheet Number Sheet Name A

D D

E N

D U

M

08 - Plumbing

P-000 PLUMBING DRAWING INDEX

P-001 PLUMBING GENERAL NOTES X

P-002 LOGISTICS AND PHASING - TYPICAL MAIN BUILDING STORM STACK OFFSET - SCENARIO 1 X

P-003 LOGISTICS AND PHASING - TYPICAL MAIN BUILDING STORM STACK OFFSET - SCENARIO 2 X

P-004 LOGISTICS AND PHASING - TYPICAL EXISTING COLLECTIONS AREAS STORM STACK X

P-005 LOGISTICS AND PHASING - TYPICAL EAST WING TOILET ROOM STACK - STEPS 1-4 X

P-006 LOGISTICS AND PHASING - TYPICAL EAST WING TOILET ROOM STACK - STEPS 5-7 X

P-007 LOGISTICS AND PHASING - TYPICAL WEST WING TOILET ROOM STACK - STEPS 1-4 X

P-008 LOGISTICS AND PHASING - TYPICAL WEST WING TOILET ROOM STACK CONT. X

P-009 LOGISTICS AND PHASING - TYPICAL EAST WING EXISTING STAFF SINK WASTE STACK X

P-010 LOGISTICS AND PHASING - TYPICAL WEST WING EXISTING STAFF SINK WASTE STACK X

PD-1ROT MAIN BUILDING - ROTUNDA - TUNNEL - DEMOLITION PLAN

PD-1RO0 MAIN BUILDING - ROTUNDA - GROUND FLOOR - DEMOLITION PLAN

PD-1RO0M MAIN BUILDING - ROTUNDA - GROUND FLOOR MEZZANINE PLAN - DEMOLITION PLAN

PD-1RO1 MAIN BUILDING - ROTUNDA - FIRST FLOOR - DEMOLITION PLAN

PD-1RO2 MAIN BUILDING - ROTUNDA - SECOND FLOOR - DEMOLITION PLAN

PD-1RO3 MAIN BUILDING - ROTUNDA - THIRD FLOOR - DEMOLITION PLAN

PD-1ROA MAIN BUILDING - ROTUNDA - ATTIC - DEMOLITION PLAN

PD-1ROP MAIN BUILDING - ROTUNDA - PENTHOUSE - DEMOLITION PLAN

PD-1ROR MAIN BUILDING - ROTUNDA - ROOF - DEMOLITION PLAN

PD-1NHTN MAIN BUILDING - NORTH HALL - TUNNEL - NORTH - DEMOLITION PLAN

PD-1NHTS MAIN BUILDING - NORTH HALL - TUNNEL - SOUTH - DEMOLITION PLAN

PD-1NH0N MAIN BUILDING - NORTH HALL - GROUND FLOOR - NORTH - DEMOLITION PLAN

PD-1NH0S MAIN BUILDING - NORTH HALL - GROUND FLOOR - SOUTH - DEMOLITION PLAN

PD-1NH1N MAIN BUILDING - NORTH HALL - FIRST FLOOR - NORTH - DEMOLITION PLAN

PD-1NH1S MAIN BUILDING - NORTH HALL - FIRST FLOOR - SOUTH - DEMOLITION PLAN

PD-1NH2N MAIN BUILDING - NORTH HALL - SECOND FLOOR - NORTH - DEMOLITION PLAN

PD-1NH2S MAIN BUILDING - NORTH HALL - SECOND FLOOR - SOUTH - DEMOLITION PLAN

PD-1NH3N MAIN BUILDING - NORTH HALL - THIRD FLOOR - NORTH - DEMOLITION PLAN

PD-1NH3S MAIN BUILDING - NORTH HALL - THIRD FLOOR - SOUTH - DEMOLITION PLAN

PD-1NHAN MAIN BUILDING - NORTH HALL - ATTIC - NORTH - DEMOLITION PLAN

PD-1NHAS MAIN BUILDING - NORTH HALL - ATTIC - SOUTH - DEMOLITION PLAN

PD-1NHRN MAIN BUILDING - NORTH HALL - ROOF - NORTH - DEMOLITION PLAN

PD-1NHRS MAIN BUILDING - NORTH HALL - ROOF - SOUTH - DEMOLITION PLAN

PD-1EHT MAIN BUILDING - EAST HALL - TUNNEL - DEMOLITION PLAN

PD-1EH0 MAIN BUILDING - EAST HALL - GROUND FLOOR - DEMOLITION PLAN

PD-1EH0M MAIN BUILDING - EAST HALL - GROUND FLOOR MEZZANINE - DEMOLITION PLAN

PD-1EH1 MAIN BUILDING - EAST HALL - FIRST FLOOR - DEMOLITION PLAN

PD-1EH2 MAIN BUILDING - EAST HALL - SECOND FLOOR - DEMOLITION PLAN

PD-1EH3 MAIN BUILDING - EAST HALL - THIRD FLOOR - DEMOLITION PLAN

PD-1EHA MAIN BUILDING - EAST HALL - ATTIC - DEMOLITION PLAN

PD-1EHR MAIN BUILDING - EAST HALL - ROOF - DEMOLITION PLAN

PD-1ERTN MAIN BUILDING - EAST RANGE - TUNNEL - NORTH - DEMOLITION PLAN

PD-1ERTS MAIN BUILDING - EAST RANGE - TUNNEL - SOUTH - DEMOLITION PLAN

PD-1ER0N MAIN BUILDING - EAST RANGE - GROUND FLOOR - NORTH - DEMOLITION PLAN

PD-1ER0S MAIN BUILDING - EAST RANGE - GROUND FLOOR - SOUTH - DEMOLITION PLAN

PD-1ER0MN MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - NORTH - DEMOLITION PLAN

PD-1ER0MS MAIN BUILDING - EAST RANGE - GROUND FLOOR MEZZANINE - SOUTH - DEMOLITION PLAN

PD-1ER1N MAIN BUILDING - EAST RANGE - FIRST FLOOR - NORTH - DEMOLITION PLAN

PD-1ER1S MAIN BUILDING - EAST RANGE - FIRST FLOOR - SOUTH - DEMOLITION PLAN

PD-1ER2N MAIN BUILDING - EAST RANGE - SECOND FLOOR - NORTH - DEMOLITION PLAN

PD-1ER2S MAIN BUILDING - EAST RANGE - SECOND FLOOR - SOUTH - DEMOLITION PLAN

PD-1ER3N MAIN BUILDING - EAST RANGE - THIRD FLOOR - NORTH - DEMOLITION PLAN

PD-1ER3S MAIN BUILDING - EAST RANGE - THIRD FLOOR - SOUTH - DEMOLITION PLAN

PD-1ERAN MAIN BUILDING - EAST RANGE - ATTIC - NORTH - DEMOLITION PLAN

PD-1ERAS MAIN BUILDING - EAST RANGE - ATTIC - SOUTH - DEMOLITION PLAN

PD-1ERRN MAIN BUILDING - EAST RANGE - ROOF - NORTH - DEMOLITION PLAN

PD-1ERRS MAIN BUILDING - EAST RANGE - ROOF - SOUTH - DEMOLITION PLAN

PD-1WHT MAIN BUILDING - WEST HALL - TUNNEL - DEMOLITION PLAN X

PD-1WH0 MAIN BUILDING - WEST HALL - GROUND FLOOR - DEMOLITION PLAN

PD-1WH0M MAIN BUILDING - WEST HALL - GROUND FLOOR MEZZANINE - DEMOLITION PLAN

PD-1WH1 MAIN BUILDING - WEST HALL - FIRST FLOOR - DEMOLITION PLAN

PD-1WH2 MAIN BUILDING - WEST HALL - SECOND FLOOR - DEMOLITION PLAN X

PD-1WH3 MAIN BUILDING - WEST HALL - THIRD FLOOR - DEMOLITION PLAN

PD-1WHA MAIN BUILDING - WEST HALL - ATTIC - DEMOLITION PLAN

PD-1WHR MAIN BUILDING - WEST HALL - ROOF - DEMOLITION PLAN

PD-1WRTN MAIN BUILDING - WEST RANGE - TUNNEL - NORTH - DEMOLITION PLAN

PD-1WRTS MAIN BUILDING - WEST RANGE - TUNNEL - SOUTH - DEMOLITION PLAN

PD-1WR0N MAIN BUILDING - WEST RANGE - GROUND FLOOR - NORTH - DEMOLITION PLAN

PD-1WR0S MAIN BUILDING - WEST RANGE - GROUND FLOOR - SOUTH - DEMOLITION PLAN

PD-1WR0MN MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - NORTH - DEMOLITION PLAN

PD-1WR0MS MAIN BUILDING - WEST RANGE - GROUND FLOOR MEZZANINE - SOUTH - DEMOLITION PLAN

PD-1WR1N MAIN BUILDING - WEST RANGE - FIRST FLOOR - NORTH - DEMOLITION PLAN

PD-1WR1S MAIN BUILDING - WEST RANGE - FIRST FLOOR - SOUTH - DEMOLITION PLAN

PD-1WR2N MAIN BUILDING - WEST RANGE - SECOND FLOOR - NORTH - DEMOLITION PLAN

PD-1WR2S MAIN BUILDING - WEST RANGE - SECOND FLOOR - SOUTH - DEMOLITION PLAN

PD-1WR3N MAIN BUILDING - WEST RANGE - THIRD FLOOR - NORTH - DEMOLITION PLAN

PD-1WR3S MAIN BUILDING - WEST RANGE - THIRD FLOOR - SOUTH - DEMOLITION PLAN

PD-1WRAN MAIN BUILDING - WEST RANGE - ATTIC - NORTH - DEMOLITION PLAN

PD-1WRAS MAIN BUILDING - WEST RANGE - ATTIC - SOUTH - DEMOLITION PLAN

PD-1WRRN MAIN BUILDING - WEST RANGE - ROOF - NORTH - DEMOLITION PLAN X

PD-1WRRS MAIN BUILDING - WEST RANGE - ROOF - SOUTH - DEMOLITION PLAN

PD-1EWBN EAST WING - BASEMENT - NORTH - DEMOLITION PLAN

PD-1EWBS EAST WING - BASEMENT - SOUTH - DEMOLITION PLAN

PD-1EW0N EAST WING - GROUND FLOOR - NORTH - DEMOLITION PLAN

PD-1EW0S EAST WING - GROUND FLOOR - SOUTH - DEMOLITION PLAN

PD-1EW1N EAST WING - FIRST FLOOR - NORTH - DEMOLITION PLAN

PD-1EW1S EAST WING - FIRST FLOOR - SOUTH - DEMOLITION PLAN

PD-1EW2N EAST WING - SECOND FLOOR - NORTH - DEMOLITION PLAN X

PD-1EW2S EAST WING - SECOND FLOOR - SOUTH - DEMOLITION PLAN X

PD-1EW3N EAST WING - THIRD FLOOR - NORTH - DEMOLITION PLAN X

PD-1EW3S EAST WING - THIRD FLOOR - SOUTH - DEMOLITION PLAN

PD-1EW4N EAST WING - FOURTH FLOOR - NORTH - DEMOLITION PLAN

PD-1EW4S EAST WING - FOURTH FLOOR - SOUTH - DEMOLITION PLAN X

PD-1EW5N EAST WING - FIFTH FLOOR - NORTH - DEMOLITION PLAN

PD-1EW5S EAST WING - FIFTH FLOOR - SOUTH - DEMOLITION PLAN

PD-1EW6N EAST WING - SIXTH FLOOR - NORTH - DEMOLITION PLAN

PD-1EW6S EAST WING - SIXTH FLOOR - SOUTH - DEMOLITION PLAN X

PD-1EWP EAST WING - PENTHOUSE - DEMOLITION PLAN

PD-1WWBN WEST WING - BASEMENT - NORTH - DEMOLITION PLAN X

PD-1WWBS WEST WING - BASEMENT - SOUTH - DEMOLITION PLAN X

PD-1WW0N WEST WING - GROUND FLOOR - NORTH - DEMOLITION PLAN

PD-1WW0S WEST WING - GROUND FLOOR - SOUTH - DEMOLITION PLAN X

PD-1EWR EAST WING - ROOF - DEMOLITION PLAN X

PD-1WW1N WEST WING - FIRST FLOOR - NORTH - DEMOLITION PLAN

1 05/12/26 ADDENDUM #1

t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå

GRAPHIC SCALE(S)

SHEET NO.

OF

PROJECT TITLE

A/E PROJECT NUMBER

ADDRESS

BUILDING NAME

SF PROJECT NUMBER

DRAWING TITLE

WORKING STAFF

STAMP

DATE SUBMISSION

A

B

C

D

E

F

G

H

J

K

A

B

C

D

E

F

G

H

J

K

REVISION # DATE REVISION DESCRIPTION

TYPE

DRAWN BY

SEQUENCEDISCIPLINE

CHECKED BYDESIGNED BY

Federal Reserve Bank Building

100 N. 6th Street

Philadelphia, PA 19106

Tel: 215-923-2020

Fax: 215-574-9163 kjke rmdo^ab= p^kfq^ov=^ka= pqloj=pvpqbjp clo= `lkpqor`qflk

:1 :1

A

M DRAWING LIST - VOLUME #3

20190809

UPGRADE SANITARY AND STORM

SYSTEMS

12/05/25 BID SET ISSUANCE

G S H

B Y

A p p ro v e r

B

ID

S E T

IS

S U A N C

E NATIONAL MUSEUM OF NATURAL

HISTORY

10TH STREET & CONSTITUTION

AVE, WASHINGTON DC, 20560

1600103

PP/BK TVPP/BK

G-004SH

4 533

VOLUME #3 - ELECTRICAL, FIRE PROTECTION, FIRE ALARM

Sheet Number Sheet Name A

D D

E N

D U

M

09 - Electrical

E-001SH LEGEND AND ABBREVIATIONS

E-401DP DEMOLITION PLAN - NORTH HALL - GROUND FLOOR

E-401PP POWER PLAN - NORTH HALL - GROUND FLOOR

E-401LP LIGHTING PLAN - NORTH HALL - GROUND FLOOR

E-402EP ENLARGED PLANS - WEST HALL - GROUND FLOOR

E-403EP ENLARGED PLANS - NORTH HALL - THIRD FLOOR

E-404EP ENLARGED PLANS - EAST RANGE - THIRD FLOOR - RESTROOM

E-405PP POWER PLAN - EAST RANGE - THIRD FLOOR - PANTRY

E-406EP ENLARGED PLANS - EAST HALL - THIRD FLOOR - PANTRY

E-407EP ENLARGED PLANS - EAST WING DASH - FIRST FLOOR

E-408EP ENLARGED PLANS - EAST WING - FIRST FLOOR

E-409EP ENLARGED PLANS - EAST WING DASH - SECOND FLOOR

E-410EP ENLARGED PLANS - EAST WING - SECOND FLOOR

E-411EP ENLARGED PLANS - EAST WING DASH - THIRD FLOOR

E-412EP ENLARGED PLANS - EAST WING - THIRD FLOOR

E-413EP ENLARGED PLANS - EAST WING DASH - FOURTH FLOOR

E-414EP ENLARGED PLANS - EAST WING - FOURTH FLOOR

E-415EP ENLARGED PLANS - EAST WING DASH - FIFTH FLOOR

E-416EP ENLARGED PLANS - EAST WING - FIFTH FLOOR

E-417EP ENLARGED PLANS - EAST WING DASH - SIXTH FLOOR

E-418EP ENLARGED PLANS - WEST WING DASH - THIRD FLOOR

E-419EP ENLARGED PLANS - WEST WING - THIRD FLOOR

E-420EP ENLARGED PLANS - WEST WING DASH - FOURTH FLOOR

E-421EP ENLARGED PLANS - WEST WING - FOURTH FLOOR

E-422EP ENLARGED PLANS - WEST WING DASH - FIFTH FLOOR

E-423EP ENLARGED PLANS - WEST WING - FIFTH FLOOR

E-424EP ENLARGED PLANS - WEST WING DASH - SIXTH FLOOR

E-425EP ENLARGED PLANS - EAST COURT - SECOND FLOOR

E-426EP ENLARGED PLANS - MAIN BUILDING, EAST WING & WEST WING

E-601SH LUMINAIRE SCHEDULE

E-611SH PANELBOARD SCHEDULES - MAIN BUILDING

E-612SH PANELBOARD SCHEDULES - MAIN BUILDING AND EAST COURT

E-613SH PANELBOARD SCHEDULES - EAST WING

E-614SH PANELBOARD SCHEDULES - EAST WING

E-615SH PANELBOARD SCHEDULES - EAST WING

E-616SH PANELBOARD SCHEDULES - EAST WING

E-617SH PANELBOARD SCHEDULES - EAST WING

E-618SH PANELBOARD SCHEDULES - WEST WING

E-619SH PANELBOARD SCHEDULES - WEST WING

E-620SH PANELBOARD SCHEDULES - WEST WING

E-621SH EMERGENCY PANELBOARD SCHEDULES

E-701SH LIGHTING CONTROL DIAGRAMS

E-702SH ELECTRICAL DETAILS

11 - Fire Protection

F-001CS COVER SHEET

F-401KP ENLARGED DEMOLITION PLANS - MAIN BUILDING - NORTH HALL - GROUND FLOOR - RESTROOMS

F-402 KP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - GROUND FLOOR - RESTROOMS

F-403KP ENLARGED PLANS - MAIN BUILDING - WEST HALL - GROUND FLOOR - RESTROOMS

F-404KP ENLARGED PLANS - MAIN BUILDING - NORTH HALL - 3RD FLOOR - WOMEN'S RESTROOM

F-405KP ENLARGED PLANS - MAIN BUILDING - EAST RANGE - 3RD FLOOR - RESTROOM

F-406KP ENLARGED PLANS - EAST WING DASH - 1ST FLOOR - RESTROOMS

F-407KP ENLARGED PLANS - EAST WING - 1ST FLOOR - RESTROOMS

F-408KP ENLARGED PLANS - EAST WING DASH - 2ND FLOOR - RESTROOMS

F-409KP ENLARGED PLANS - EAST WING - 2ND FLOOR - RESTROOMS

F-410KP ENLARGED PLANS - EAST WING DASH - 3RD FLOOR - RESTROOMS

F-411KP ENLARGED PLANS - EAST WING - 3RD FLOOR - RESTROOMS

F-412KP ENLARGED PLANS - EAST WING DASH - 4TH FLOOR - RESTROOMS

F-413KP ENLARGED PLANS - EAST WING - 4TH FLOOR - RESTROOMS

F-414KP ENLARGED PLANS - EAST WING DASH - 5TH FLOOR - RESTROOMS

F-415KP ENLARGED PLANS - EAST WING - 5TH FLOOR - RESTROOMS

F-416KP ENLARGED PLANS - EAST WING DASH - 6TH FLOOR - RESTROOMS

F-417KP ENLARGED PLANS - WEST WING DASH - 3RD FLOOR - RESTROOMS

F-418KP ENLARGED PLANS - WEST WING - 3RD FLOOR - RESTROOMS

F-419KP ENLARGED PLANS - WEST WING DASH - 4TH FLOOR - RESTROOMS

F-420KP…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .