TX FLAP FM 709(1) – Access to Navarro Mills Lake

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
6982AF23B000037
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Dawson, Texas, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Transportation Federal Highway Administration is seeking bids for a highway construction project designated as TX FLAP FM 709(1) - Access to Navarro Mills Lake. The proposed improvements involve 3R (Resurfacing, Restoration, and Rehabilitation) of approximately 3.8 miles of FM 709 in Texas to provide access to the Navarro Mills Harbor Marina and Dam Road. The key scope of work includes full depth reclamation, shoulder widening, asphalt concrete pavement, guardrail installation, culvert extensions/replacements, and various safety enhancements such as signing, pavement markings, and rumble strips. The solicitation has an estimated cost range between $5,000,000 and $10,000,000, with an anticipated advertisement date in September 2024, award in Fall 2024, and construction from November 2024 to August 2025.

This is an unrestricted solicitation with no set-aside designation. The government has not identified any potential incumbents or current contractors for this project. The evaluation criteria will likely focus on the contractor's technical approach, schedule, and pricing, with a 10% price evaluation preference for HUBZone small business concerns that do not waive the preference. The project location is in Dawson, Texas, and the contracting agency is the civilian Department of Transportation Federal Highway Administration.

Notice text

PROJECT NUMBER:TX FLAP FM 709(1)

PROJECT NAME:Navarro Mills Lake Road

PROJECT DESCRIPTION:

The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709.  The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road.  The improvements begin approximately at intersection SH 31 in the City of Dawson and ends at the Liberty Hill Park junction.

The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP).  In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety.

PRINCIPAL WORK ITEMS:

  • 7,820 Embankment Construction
  • 29,000 tons of Aggregate base
  • 49,750 square yards of Recycled aggregate base, 9-inch depth (with cement)
  • 7000 Tons of Asphalt Concrete Pavement
  • 4000 hours of temporary traffic control, flagger
  • 60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel.
  • 20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert
  • 390 linear feet, 30-inch pipe culvert (concrete)
  • 660 linear feet, 24-inch pipe culvert (concrete)
  • 210 linear feet, 54-inch pipe culvert (concrete)

ANTICIPATED SCHEDULE: 

Advertise:  September 2024

Award:  Fall 2024

Construction:  November 2024 –August 2025

ESTIMATED COST RANGE:  The anticipated cost range is between $5,000,000 and $10,000,000.

Files

Show all 14

Notice history

Notice Type Posted
TX FLAP FM 709(1) – Access to Navarro Mills Lake Award Award Notice
This notice Latest solicitation Solicitation
TX FLAP FM 709(1) – Access to Navarro Mills Lake Pre-Solicitation
TX FLAP FM 709(1) – Access to Navarro Mills Lake Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors