Tabulation of Bids - Navarro Mills Lake Road.pdf
PDF 651 KB Posted
- Attached to
- TX FLAP FM 709(1) – Access to Navarro Mills Lake
- Solicitation number
- 6982AF23B000037
About this file
This document is a Tabulation of Bids for the "Access to Navarro Mills Lake" project, federal project number TX FLAP FM709(1). The project will rehabilitate 3.8 miles of FM 709 in Texas, including full depth reclamation, shoulder widening, and asphalt concrete pavement. Key work items include embankment construction, aggregate base, cement-treated aggregate, asphalt paving, drainage structure replacements, guardrail, and other roadway improvements. The solicitation number is 6982AF23B000037, with an estimated cost range between $5-10 million. The contract was awarded to McKenzie Construction and Site Development with a bid of $6,742,627. Other bids ranged from $8.3 million to $11.1 million. The project is anticipated to be advertised in September 2024, awarded in Fall 2024, and constructed from November 2024 to August 2025.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 11/06/24
1 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF23B000037
Division: Central Federal Lands
State: TX County: Navarro
Federal Land: Opened at: Lakewood
Opened by: Jorey Deml
Date: 10/30/24
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
McKenzie Construction and Site Development $6,742,627.00 2301 Calvert ST NW Washington, DC 20008
C-A Native Constructors Inc $8,302,206.33 4000 E Harris Road Muskogee, OK 74403
Central Southern Construction Corp. $8,710,595.00 119 Sewald Street Jacksonville, FL 32204
Steve Manning Construction, Inc $11,144,990.00 5211 Churn Creek Road Redding, CA 96002
Engineer's Estimate $9,370,000.00
2 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
McKenzie Construction and Site Development Lump Sum $294,756.00 C-A Native Constructors Inc Lump Sum $983,990.87 Central Southern Construction Corp. Lump Sum $1,250,000.00 Steve Manning Construction, Inc Lump Sum $900,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,053,530.00
A0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
McKenzie Construction and Site Development $308.00 $18,480.00 C-A Native Constructors Inc $631.67 $37,900.20 Central Southern Construction Corp. $750.00 $45,000.00 Steve Manning Construction, Inc $1,100.00 $66,000.00 Engineer's Estimate 60 EACH $1,000.00 $60,000.00
A0060 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
McKenzie Construction and Site Development $12,305.00 $44,298.00 C-A Native Constructors Inc $28,425.16 $102,330.58 Central Southern Construction Corp. $10,000.00 $36,000.00 Steve Manning Construction, Inc $24,500.00 $88,200.00 Engineer's Estimate 3.600 MILE $8,000.00 $28,800.00
A0080 15236-2000 SURVEY CONTROL, GRADE FINISHING
McKenzie Construction and Site Development $6,152.50 $66,447.00 C-A Native Constructors Inc $6,316.70 $68,220.36 Central Southern Construction Corp. $4,800.00 $51,840.00 Steve Manning Construction, Inc $7,500.00 $81,000.00 Engineer's Estimate 10.800 MILE $5,000.00 $54,000.00
A0100 15301-0000 CONTRACTOR QUALITY CONTROL
McKenzie Construction and Site Development Lump Sum $88,951.00 C-A Native Constructors Inc Lump Sum $349,310.74 Central Southern Construction Corp. Lump Sum $375,000.00 Steve Manning Construction, Inc Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $260,000.00
A0120 15401-0000 CONTRACTOR TESTING
McKenzie Construction and Site Development Lump Sum $90,179.00 C-A Native Constructors Inc Lump Sum $203,764.59 Central Southern Construction Corp. Lump Sum $400,000.00 Steve Manning Construction, Inc Lump Sum $180,000.00 Engineer's Estimate ALL LPSM Lump Sum $230,000.00
3 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0140 15501-0000 CONSTRUCTION SCHEDULE
McKenzie Construction and Site Development Lump Sum $30,762.00 C-A Native Constructors Inc Lump Sum $18,847.39 Central Southern Construction Corp. Lump Sum $25,000.00 Steve Manning Construction, Inc Lump Sum $23,000.00 Engineer's Estimate ALL LPSM Lump Sum $75,000.00
A0160 15701-0000 SOIL EROSION CONTROL
McKenzie Construction and Site Development Lump Sum $159,962.00 C-A Native Constructors Inc Lump Sum $64,040.30 Central Southern Construction Corp. Lump Sum $175,000.00 Steve Manning Construction, Inc Lump Sum $70,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00
A0180 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
McKenzie Construction and Site Development Lump Sum $1,230.00 C-A Native Constructors Inc Lump Sum $4,075.29 Central Southern Construction Corp. Lump Sum $24,800.00 Steve Manning Construction, Inc Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A0200 15802-0000 WATERING FOR DUST CONTROL
McKenzie Construction and Site Development Lump Sum $61,524.00 C-A Native Constructors Inc Lump Sum $226,263.90 Central Southern Construction Corp. Lump Sum $300,000.00 Steve Manning Construction, Inc Lump Sum $180,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
A0220 20101-0000 CLEARING AND GRUBBING
McKenzie Construction and Site Development $2,461.00 $63,986.00 C-A Native Constructors Inc $1,041.21 $27,071.46 Central Southern Construction Corp. $2,220.00 $57,720.00 Steve Manning Construction, Inc $4,700.00 $122,200.00 Engineer's Estimate 26.0 ACRE $1,900.00 $49,400.00
A0240 20301-0300 REMOVAL OF BOX CULVERT (PARTIAL)
McKenzie Construction and Site Development $6,152.00 $6,152.00 C-A Native Constructors Inc $3,493.10 $3,493.10 Central Southern Construction Corp. $3,000.00 $3,000.00 Steve Manning Construction, Inc $12,000.00 $12,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00
4 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 20301-0700 REMOVAL OF DELINEATOR (OBJECT MARKER)
McKenzie Construction and Site Development $615.00 $8,610.00 C-A Native Constructors Inc $82.01 $1,148.14 Central Southern Construction Corp. $200.00 $2,800.00 Steve Manning Construction, Inc $75.00 $1,050.00 Engineer's Estimate 14 EACH $10.00 $140.00
A0280 20301-1900 REMOVAL OF PIPE CULVERT
McKenzie Construction and Site Development $378.00 $21,924.00 C-A Native Constructors Inc $465.75 $27,013.50 Central Southern Construction Corp. $400.00 $23,200.00 Steve Manning Construction, Inc $1,500.00 $87,000.00 Engineer's Estimate 58 EACH $2,000.00 $116,000.00
A0300 20301-2400 REMOVAL OF SIGN
McKenzie Construction and Site Development $369.00 $16,605.00 C-A Native Constructors Inc $76.54 $3,444.30 Central Southern Construction Corp. $100.00 $4,500.00 Steve Manning Construction, Inc $100.00 $4,500.00 Engineer's Estimate 45 EACH $250.00 $11,250.00
A0320 20302-0200 REMOVAL OF CURB
McKenzie Construction and Site Development $31.00 $1,240.00 C-A Native Constructors Inc $21.77 $870.80 Central Southern Construction Corp. $50.00 $2,000.00 Steve Manning Construction, Inc $100.00 $4,000.00 Engineer's Estimate 40 LNFT $25.00 $1,000.00
A0340 20402-0000 SUBEXCAVATION
McKenzie Construction and Site Development $37.00 $18,500.00 C-A Native Constructors Inc $109.87 $54,935.00 Central Southern Construction Corp. $110.00 $55,000.00 Steve Manning Construction, Inc $255.00 $127,500.00 Engineer's Estimate 500 CUYD $60.00 $30,000.00
A0360 20420-0000 EMBANKMENT CONSTRUCTION
McKenzie Construction and Site Development $43.00 $335,400.00 C-A Native Constructors Inc $62.29 $485,862.00 Central Southern Construction Corp. $53.50 $417,300.00 Steve Manning Construction, Inc $198.00 $1,544,400.00 Engineer's Estimate 7,800 CUYD $120.00 $936,000.00
5 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 20820-0000 DEWATERING
McKenzie Construction and Site Development Lump Sum $19,688.00 C-A Native Constructors Inc Lump Sum $17,465.53 Central Southern Construction Corp. Lump Sum $250,000.00 Steve Manning Construction, Inc Lump Sum $9,000.00 Engineer's Estimate ALL LPSM Lump Sum $30,000.00
A0400 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
McKenzie Construction and Site Development $80.00 $52,000.00 C-A Native Constructors Inc $261.98 $170,287.00 Central Southern Construction Corp. $225.00 $146,250.00 Steve Manning Construction, Inc $240.00 $156,000.00 Engineer's Estimate 650 CUYD $300.00 $195,000.00
A0420 30101-0000 AGGREGATE BASE
McKenzie Construction and Site Development $37.00 $1,054,500.00 C-A Native Constructors Inc $49.49 $1,410,465.00 Central Southern Construction Corp. $42.50 $1,211,250.00 Steve Manning Construction, Inc $56.00 $1,596,000.00 Engineer's Estimate 28,500 TON $45.00 $1,282,500.00
A0460 30302-1000 DITCH RECONDITIONING
McKenzie Construction and Site Development $61.00 $122,000.00 C-A Native Constructors Inc $17.47 $34,940.00 Central Southern Construction Corp. $15.00 $30,000.00 Steve Manning Construction, Inc $15.00 $30,000.00 Engineer's Estimate 2,000 LNFT $20.00 $40,000.00
A0480 30703-0000 CEMENT TREATED AGGREGATE COURSE
McKenzie Construction and Site Development $49.00 $583,100.00 C-A Native Constructors Inc $19.44 $231,336.00 Central Southern Construction Corp. $16.70 $198,730.00 Steve Manning Construction, Inc $66.00 $785,400.00 Engineer's Estimate 11,900 CUYD $67.00 $797,300.00
A0500 30715-0000 CEMENT
McKenzie Construction and Site Development $301.00 $141,470.00 C-A Native Constructors Inc $266.64 $125,320.80 Central Southern Construction Corp. $229.00 $107,630.00 Steve Manning Construction, Inc $278.00 $130,660.00 Engineer's Estimate 470 TON $275.00 $129,250.00
6 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0520 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
McKenzie Construction and Site Development $238.00 $1,666,000.00 C-A Native Constructors Inc $200.27 $1,401,890.00 Central Southern Construction Corp. $172.00 $1,204,000.00 Steve Manning Construction, Inc $220.00 $1,540,000.00 Engineer's Estimate 7,000 TON $190.00 $1,330,000.00
A0540 41102-1000 PRIME COAT, METHOD 1
McKenzie Construction and Site Development $1.00 $66,000.00 C-A Native Constructors Inc $2.04 $134,640.00 Central Southern Construction Corp. $1.75 $115,500.00 Steve Manning Construction, Inc $1.66 $109,560.00 Engineer's Estimate 66,000 SQYD $3.00 $198,000.00
A0560 41301-0600 ASPHALT PAVEMENT MILLING, 2-INCH DEPTH
McKenzie Construction and Site Development $25.00 $50,000.00 C-A Native Constructors Inc $17.52 $35,040.00 Central Southern Construction Corp. $15.00 $30,000.00 Steve Manning Construction, Inc $8.00 $16,000.00 Engineer's Estimate 2,000 SQYD $10.00 $20,000.00
A0580 60103-0000 CONCRETE, HEADWALL (WINGWALL)
McKenzie Construction and Site Development $14,766.00 $88,596.00 C-A Native Constructors Inc $50,417.18 $302,503.08 Central Southern Construction Corp. $43,300.00 $259,800.00 Steve Manning Construction, Inc $54,000.00 $324,000.00 Engineer's Estimate 6 EACH $30,000.00 $180,000.00
A0600 60201-0600 18-INCH PIPE CULVERT (CONCRETE)
McKenzie Construction and Site Development $129.00 $98,040.00 C-A Native Constructors Inc $102.46 $77,869.60 Central Southern Construction Corp. $90.00 $68,400.00 Steve Manning Construction, Inc $300.00 $228,000.00 Engineer's Estimate 760 LNFT $165.00 $125,400.00
A0620 60201-0800 24-INCH PIPE CULVERT (CONCRETE)
McKenzie Construction and Site Development $203.00 $133,980.00 C-A Native Constructors Inc $125.75 $82,995.00 Central Southern Construction Corp. $110.00 $72,600.00 Steve Manning Construction, Inc $360.00 $237,600.00 Engineer's Estimate 660 LNFT $200.00 $132,000.00
7 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0640 60201-0900 30-INCH PIPE CULVERT (CONCRETE)
McKenzie Construction and Site Development $215.00 $83,850.00 C-A Native Constructors Inc $174.66 $68,117.40 Central Southern Construction Corp. $150.00 $58,500.00 Steve Manning Construction, Inc $420.00 $163,800.00 Engineer's Estimate 390 LNFT $250.00 $97,500.00
A0660 60201-1000 36-INCH PIPE CULVERT (CONCRETE)
McKenzie Construction and Site Development $283.00 $35,375.00 C-A Native Constructors Inc $267.80 $33,475.00 Central Southern Construction Corp. $230.00 $28,750.00 Steve Manning Construction, Inc $520.00 $65,000.00 Engineer's Estimate 125 LNFT $260.00 $32,500.00
A0680 60201-1100 42-INCH PIPE CULVERT (CONCRETE)
McKenzie Construction and Site Development $400.00 $18,000.00 C-A Native Constructors Inc $360.95 $16,242.75 Central Southern Construction Corp. $310.00 $13,950.00 Steve Manning Construction, Inc $700.00 $31,500.00 Engineer's Estimate 45 LNFT $310.00 $13,950.00
A0700 60201-1200 48-INCH PIPE CULVERT (CONCRETE)
McKenzie Construction and Site Development $461.00 $20,745.00 C-A Native Constructors Inc $436.64 $19,648.80 Central Southern Construction Corp. $375.00 $16,875.00 Steve Manning Construction, Inc $800.00 $36,000.00 Engineer's Estimate 45 LNFT $370.00 $16,650.00
A0720 60201-1300 54-INCH PIPE CULVERT (CONCRETE)
McKenzie Construction and Site Development $615.00 $129,150.00 C-A Native Constructors Inc $617.12 $129,595.20 Central Southern Construction Corp. $530.00 $111,300.00 Steve Manning Construction, Inc $876.00 $183,960.00 Engineer's Estimate 210 LNFT $430.00 $90,300.00
A0740 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
McKenzie Construction and Site Development $2,461.00 $103,362.00 C-A Native Constructors Inc $1,688.34 $70,910.28 Central Southern Construction Corp. $1,450.00 $60,900.00 Steve Manning Construction, Inc $1,500.00 $63,000.00 Engineer's Estimate 42 EACH $700.00 $29,400.00
8 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0760 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
McKenzie Construction and Site Development $2,768.00 $99,648.00 C-A Native Constructors Inc $2,124.97 $76,498.92 Central Southern Construction Corp. $1,850.00 $66,600.00 Steve Manning Construction, Inc $1,900.00 $68,400.00 Engineer's Estimate 36 EACH $750.00 $27,000.00
A0780 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
McKenzie Construction and Site Development $4,553.00 $95,613.00 C-A Native Constructors Inc $3,493.11 $73,355.31 Central Southern Construction Corp. $3,000.00 $63,000.00 Steve Manning Construction, Inc $3,900.00 $81,900.00 Engineer's Estimate 21 EACH $1,000.00 $21,000.00
A0800 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT (SAFETY)
McKenzie Construction and Site Development $10,336.00 $62,016.00 C-A Native Constructors Inc $5,938.28 $35,629.68 Central Southern Construction Corp. $5,100.00 $30,600.00 Steve Manning Construction, Inc $5,000.00 $30,000.00 Engineer's Estimate 6 EACH $1,400.00 $8,400.00
A0820 60210-1100 END SECTION FOR 42-INCH PIPE CULVERT (SAFETY)
McKenzie Construction and Site Development $12,182.00 $24,364.00 C-A Native Constructors Inc $7,219.09 $14,438.18 Central Southern Construction Corp. $6,200.00 $12,400.00 Steve Manning Construction, Inc $6,600.00 $13,200.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00
A0840 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT (SAFETY)
McKenzie Construction and Site Development $13,252.00 $26,504.00 C-A Native Constructors Inc $11,643.69 $23,287.38 Central Southern Construction Corp. $10,000.00 $20,000.00 Steve Manning Construction, Inc $11,000.00 $22,000.00 Engineer's Estimate 2 EACH $3,000.00 $6,000.00
A0860 60213-0900 BRANCH CONNECTION, 30-INCH
McKenzie Construction and Site Development $4,922.00 $4,922.00 C-A Native Constructors Inc $1,164.36 $1,164.36 Central Southern Construction Corp. $1,000.00 $1,000.00 Steve Manning Construction, Inc $1,200.00 $1,200.00 Engineer's Estimate 1 EACH $1,200.00 $1,200.00
9 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0880 60220-0350 4 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
McKenzie Construction and Site Development $1,292.00 $77,520.00 C-A Native Constructors Inc $1,385.60 $83,136.00 Central Southern Construction Corp. $1,190.00 $71,400.00 Steve Manning Construction, Inc $1,695.00 $101,700.00 Engineer's Estimate 60 LNFT $2,000.00 $120,000.00
A0900 60223-0550 5 FEET SPAN, 3 FEET RISE REINFORCED CONCRETE BOX CULVERT, TRIPLE BARREL (EXTENSION ONLY)
McKenzie Construction and Site Development $2,313.00 $46,260.00 C-A Native Constructors Inc $1,502.04 $30,040.80 Central Southern Construction Corp. $1,290.00 $25,800.00 Steve Manning Construction, Inc $5,400.00 $108,000.00 Engineer's Estimate 20 LNFT $8,000.00 $160,000.00
A0920 60704-0000 CLEANING CULVERT IN PLACE
McKenzie Construction and Site Development $1,477.00 $5,908.00 C-A Native Constructors Inc $4,657.48 $18,629.92 Central Southern Construction Corp. $4,000.00 $16,000.00 Steve Manning Construction, Inc $2,000.00 $8,000.00 Engineer's Estimate 4 EACH $5,000.00 $20,000.00
A0940 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS (TXDOT GF31-19)
McKenzie Construction and Site Development $33.00 $32,175.00 C-A Native Constructors Inc $40.75 $39,731.25 Central Southern Construction Corp. $100.00 $97,500.00 Steve Manning Construction, Inc $112.00 $109,200.00 Engineer's Estimate 975.0 LNFT $90.00 $87,750.00
A0960 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
McKenzie Construction and Site Development $3,322.00 $23,254.00 C-A Native Constructors Inc $4,249.95 $29,749.65 Central Southern Construction Corp. $6,600.00 $46,200.00 Steve Manning Construction, Inc $6,900.00 $48,300.00 Engineer's Estimate 7 EACH $5,000.00 $35,000.00
A0980 61703-0000 TERMINAL END (TXDOT NARROW SMART CRASH CUSHION)
McKenzie Construction and Site Development $38,145.00 $38,145.00 C-A Native Constructors Inc $38,424.18 $38,424.18 Central Southern Construction Corp. $15,000.00 $15,000.00 Steve Manning Construction, Inc $50,600.00 $50,600.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00
10 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1000 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
McKenzie Construction and Site Development $169.00 $3,380.00 C-A Native Constructors Inc $142.84 $2,856.80 Central Southern Construction Corp. $150.00 $3,000.00 Steve Manning Construction, Inc $180.00 $3,600.00 Engineer's Estimate 20 HOUR $175.00 $3,500.00
A1020 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
McKenzie Construction and Site Development $231.00 $4,620.00 C-A Native Constructors Inc $176.75 $3,535.00 Central Southern Construction Corp. $150.00 $3,000.00 Steve Manning Construction, Inc $180.00 $3,600.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00
A1040 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
McKenzie Construction and Site Development $236.00 $4,720.00 C-A Native Constructors Inc $259.02 $5,180.40 Central Southern Construction Corp. $200.00 $4,000.00 Steve Manning Construction, Inc $220.00 $4,400.00 Engineer's Estimate 20 HOUR $175.00 $3,500.00
A1060 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
McKenzie Construction and Site Development $314.00 $6,280.00 C-A Native Constructors Inc $259.02 $5,180.40 Central Southern Construction Corp. $200.00 $4,000.00 Steve Manning Construction, Inc $250.00 $5,000.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
A1080 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
McKenzie Construction and Site Development $252.00 $5,040.00 C-A Native Constructors Inc $209.16 $4,183.20 Central Southern Construction Corp. $200.00 $4,000.00 Steve Manning Construction, Inc $200.00 $4,000.00 Engineer's Estimate 20 HOUR $250.00 $5,000.00
A1100 62301-0000 GENERAL LABOR
McKenzie Construction and Site Development $70.00 $2,800.00 C-A Native Constructors Inc $44.49 $1,779.60 Central Southern Construction Corp. $55.00 $2,200.00 Steve Manning Construction, Inc $100.00 $4,000.00 Engineer's Estimate 40 HOUR $50.00 $2,000.00
11 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1120 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
McKenzie Construction and Site Development $121.00 $2,420.00 C-A Native Constructors Inc $270.94 $5,418.80 Central Southern Construction Corp. $100.00 $2,000.00 Steve Manning Construction, Inc $300.00 $6,000.00 Engineer's Estimate 20 HOUR $195.00 $3,900.00
A1140 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
McKenzie Construction and Site Development $150.00 $3,000.00 C-A Native Constructors Inc $270.94 $5,418.80 Central Southern Construction Corp. $250.00 $5,000.00 Steve Manning Construction, Inc $400.00 $8,000.00 Engineer's Estimate 20 HOUR $225.00 $4,500.00
A1160 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
McKenzie Construction and Site Development $2,853.00 $29,956.50 C-A Native Constructors Inc $8,463.80 $88,869.90 Central Southern Construction Corp. $7,300.00 $76,650.00 Steve Manning Construction, Inc $15,000.00 $157,500.00 Engineer's Estimate 10.5 ACRE $7,000.00 $73,500.00
A1180 62510-2000 SEEDING, HYDRAULIC METHOD
McKenzie Construction and Site Development $3,801.50 $50,179.80 C-A Native Constructors Inc $2,210.85 $29,183.22 Central Southern Construction Corp. $7,500.00 $99,000.00 Steve Manning Construction, Inc $3,000.00 $39,600.00 Engineer's Estimate 13.2 ACRE $2,800.00 $36,960.00
A1200 62515-2000 MULCHING, HYDRAULIC METHOD
McKenzie Construction and Site Development $1,438.50 $18,988.20 C-A Native Constructors Inc $6,000.87 $79,211.48 Central Southern Construction Corp. $7,500.00 $99,000.00 Steve Manning Construction, Inc $3,000.00 $39,600.00 Engineer's Estimate 13.2 ACRE $3,800.00 $50,160.00
A1220 63301-0000 SIGN SYSTEM
McKenzie Construction and Site Development $1,104.00 $66,240.00 C-A Native Constructors Inc $925.67 $55,540.20 Central Southern Construction Corp. $250.00 $15,000.00 Steve Manning Construction, Inc $1,750.00 $105,000.00 Engineer's Estimate 60 EACH $1,000.00 $60,000.00
12 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1240 63308-2000 OBJECT MARKER, TYPE 2
McKenzie Construction and Site Development $49.00 $686.00 C-A Native Constructors Inc $151.60 $2,122.40 Central Southern Construction Corp. $200.00 $2,800.00 Steve Manning Construction, Inc $90.00 $1,260.00 Engineer's Estimate 14 EACH $90.00 $1,260.00
A1260 63309-0200 DELINEATOR, TYPE 2
McKenzie Construction and Site Development $25.00 $3,000.00 C-A Native Constructors Inc $120.02 $14,402.40 Central Southern Construction Corp. $200.00 $24,000.00 Steve Manning Construction, Inc $90.00 $10,800.00 Engineer's Estimate 120 EACH $115.00 $13,800.00
A1280 63314-0000 RUMBLE STRIP
McKenzie Construction and Site Development $870.00 $8,700.00 C-A Native Constructors Inc $1,389.67 $13,896.70 Central Southern Construction Corp. $5,000.00 $50,000.00 Steve Manning Construction, Inc $1,330.00 $13,300.00 Engineer's Estimate 10.0 MILE $4,200.00 $42,000.00
A1300 63402-1500 PAVEMENT MARKINGS, TYPE H, SOLID
McKenzie Construction and Site Development $4,873.00 $56,039.50 C-A Native Constructors Inc $6,316.70 $72,642.05 Central Southern Construction Corp. $4,350.00 $50,025.00 Steve Manning Construction, Inc $4,550.00 $52,325.00 Engineer's Estimate 11.5 MILE $4,800.00 $55,200.00
A1320 63402-1600 PAVEMENT MARKINGS, TYPE H, BROKEN
McKenzie Construction and Site Development $2,436.00 $6,090.00 C-A Native Constructors Inc $7,580.04 $18,950.10 Central Southern Construction Corp. $4,330.00 $10,825.00 Steve Manning Construction, Inc $2,270.00 $5,675.00 Engineer's Estimate 2.5 MILE $4,800.00 $12,000.00
A1340 63406-0400 RAISED PAVEMENT MARKER, PLOWABLE, BI-DIRECTIONAL REFLECTIVE
McKenzie Construction and Site Development $86.00 $38,700.00 C-A Native Constructors Inc $12.63 $5,683.50 Central Southern Construction Corp. $60.00 $27,000.00 Steve Manning Construction, Inc $80.00 $36,000.00 Engineer's Estimate 450 EACH $50.00 $22,500.00
13 out of 13
Project No: TX FLAP FM709(1)
Project Name: Access to Navarro Mills Lake
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1360 63501-0000 TEMPORARY TRAFFIC CONTROL
McKenzie Construction and Site Development Lump Sum $51,415.00 C-A Native Constructors Inc Lump Sum $309,810.96 Central Southern Construction Corp. Lump Sum $450,000.00 Steve Manning Construction, Inc Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $550,000.00
A1380 63701-0000 FIELD OFFICE
McKenzie Construction and Site Development $39,941.00 $39,941.00 C-A Native Constructors Inc $81,505.83 $81,505.83 Central Southern Construction Corp. $75,000.00 $75,000.00 Steve Manning Construction, Inc $22,000.00 $22,000.00 Engineer's Estimate 1 EACH $35,000.00 $35,000.00
A1400 64620-0400 REMOVE AND RESET MAILBOX
McKenzie Construction and Site Development $308.00 $9,240.00 C-A Native Constructors Inc $247.50 $7,425.00 Central Southern Construction Corp. $200.00 $6,000.00 Steve Manning Construction, Inc $650.00 $19,500.00 Engineer's Estimate 30 EACH $600.00 $18,000.00
Total Schedule - All Items
McKenzie Construction and Site Development $6,742,627.00 C-A Native Constructors Inc $8,302,206.33 Central Southern Construction Corp. $8,710,595.00 Steve Manning Construction, Inc $11,144,990.00 Engineer's Estimate $9,370,000.00
| 2024-11-18T14:48:08-0700 | |
| Jorey Deml |
File details come from the government source that posted it. Updated .