TX FLAP FM 709(1) – Access to Navarro Mills Lake
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF23SSN0007
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Dawson, Texas, United States
- Points of contact
-
- Kelly Palmer cflacquisitions@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The Department of Transportation Federal Highway Administration is seeking qualified prime contractors to submit bids for the TX FLAP FM 709(1) - Access to Navarro Mills Lake project. The scope of work includes 3R rehabilitation to rehabilitate 3.8 miles of FM 709, including full depth reclamation, shoulder widening, asphalt concrete pavement, guardrail installation, culvert work, and safety enhancements. Interested contractors must submit their intention to bid, socioeconomic status, bonding capability, and relevant project experience by January 25, 2023. The project is anticipated to be advertised in August 2023 with construction from November 2023 to August 2024.
Paragraph 2:
This opportunity is not set aside for any specific business size or socioeconomic category. The estimated price range for the project is between $5,000,000 and $10,000,000. The Federal Highway Administration is looking for prime contractors with experience in road and bridge construction, cultural and natural resource sensitive areas, and projects with environmental constraints that impact the construction schedule and operations.
Notice text
2 versions
Update #2 · Latest ·
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to cflcontracts@dot.gov (Attn: Stephanie Navarro) for receipt by close of business (2 p.m. local Denver time) on July 18, 2024:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the TX FLAP FM 709(1) – Access to Navarro Mills Lakeproject in which you performed work cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
PROJECT DESCRIPTION:
The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709. The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road. The improvements begin approximately at the intersection with SH 31 in the City of Dawson and ends at the Liberty Hill Park junction.
SCOPE OF THE WORK:
The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP). In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety.
PRINCIPAL WORK ITEMS:
7,820 Embankment Construction
29,000 tons of Aggregate base
49,750 square yards of Recycled aggregate base, 9-inch depth (with cement)
7000 Tons of Asphalt Concrete Pavement
4000 hours of temporary traffic control, flagger
60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel.
20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert
390 linear feet, 30-inch pipe culvert (concrete)
660 linear feet, 24-inch pipe culvert (concrete)
210 linear feet, 54-inch pipe culvert (concrete)
ANTICIPATED SCHEDULE: The anticipated advertisement date for the project is August/September 2024 with construction anticipated from November 2024 to August 2025.
The estimated price range of the project work is between $5,000,000 and $10,000,000.
Update #1 ·
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service-disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to cflcontracts@dot.gov (Attn: Kelly Palmer) for receipt by close of business (2 p.m. local Denver time) on January 25, 2023:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $10 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the TX FLAP FM 709(1) – Access to Navarro Mills Lakeproject in which you performed work cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
PROJECT DESCRIPTION:
The proposed improvements are for 3R rehabilitation to rehabilitate 3.8 miles of FM 709. The roadway provides access to the Navarro Mills Harbor Marina and the Dam Road. The improvements begin approximately at the intersection with SH 31 in the City of Dawson and ends at the Liberty Hill Park junction.
SCOPE OF THE WORK:
The proposed project is anticipated to be full depth reclamation, shoulder widening, and asphalt concrete pavement (ACP). In addition, the project will add guardrail, replace bridge transition rail, guardrail end terminals, mow strips, extend or replacement culverts and install safety end treatments to drainage structures. The roadway will be widened to 11-foot lanes and 3-foot shoulders. Signing and pavement markets and rumble strips will be included to improve safety.
PRINCIPAL WORK ITEMS:
7,820 Embankment Construction
29,000 tons of Aggregate base
49,750 square yards of Recycled aggregate base, 9-inch depth (with cement)
7000 Tons of Asphalt Concrete Pavement
4000 hours of temporary traffic control, flagger
60 Linear feet, 5 feet span, 3 feet rise reinforced concrete box culvert, triple barrel.
20 liner feet, 4 feet span, 4 feet rise precast reinforced concrete box culvert
390 linear feet, 30-inch pipe culvert (concrete)
660 linear feet, 24-inch pipe culvert (concrete)
210 linear feet, 54-inch pipe culvert (concrete)
ANTICIPATED SCHEDULE: The anticipated advertisement date for the project is August 2023 with construction anticipated from November 2023 to August 2024.
EXPERIENCE:
Provide a list of roadway construction projects of equal or greater value and similar scope to that described herein and in which you performed (as the prime contractor) work cultural and natural resource sensitive areas and there are numerous environmental constraints that will affect the construction schedule and type of operations. State whether your firm was the prime contractor or subcontractor on the project.
Great attention to detail will be required in achieving customer satisfaction in areas of road and bridge construction, traffic control, and timely completion of work. Prior experience with road and bridge construction is required.
The estimated price range of the project work is between $5,000,000 and $10,000,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| TX FLAP FM 709(1) – Access to Navarro Mills Lake | Award Notice | |
| TX FLAP FM 709(1) – Access to Navarro Mills Lake | Solicitation | |
| TX FLAP FM 709(1) – Access to Navarro Mills Lake | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY27 Texas City Ship Channel Main Channel and Turning Basin | ENDIST Galveston | No set-aside | |
| Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY24(1) | Federal Highway Administration | Total Small Business | |
| WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs | Federal Highway Administration | No set-aside | |
| Invitation for Bids, Wright Patman Lake, Texas, LUMP SUM CONTRACT - 3 ITEMS | ENDIST Fort Worth | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity