Pavement Report TX FLAP FM709 -final rev 05-16-23_binder revision 8-30-24.pdf
PDF 6 MB Posted
- Attached to
- TX FLAP FM 709(1) – Access to Navarro Mills Lake
- Solicitation number
- 6982AF23B000037
About this file
This document is a pavement and materials report for the TX FLAP FM 709(1) - Navarro Mills Lake Access project. The report provides a detailed field investigation, laboratory test results, and final pavement design recommendations. The existing roadway consists of chip seals over a cemented aggregate base, with poor subgrade soils. The recommended pavement section includes 2 inches of hot mix asphalt concrete, 8 inches of aggregate base course, and 6 inches of cement treated aggregate base. The report also includes recommendations for asphalt binder grade, cement application rate, and relevant bid items. This information will support the planned 3R rehabilitation of 3.8 miles of FM 709 to provide access to the Navarro Mills Harbor Marina and Dam Road.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TX FLAP 709(1)
Navarro Mills Lake Access
PAVEMENT AND MATERIALS REPORT
August 2022
Report Prepared By
U.S. Department of Transportation Federal Highway Administration
Central Federal Lands Highway Division Lakewood, Colorado
TX FLAP 709(1) Navarro Mills Lake Access ii
Written by: ________________________________________________________ Marty Fey, Pavement and Materials Engineer
Reviewed and approved for distribution by:
Mike Voth, Pavement and Materials Team Lead
Distribution:
Project Development Project Management Construction Materials Pavements Geotech Texas Department of Transportation on behalf of iii
TABLE OF CONTENTS
I. INTRODUCTION
II. CLIMATE
III. EXPLORATION
IV. EXISTING PAVEMENT & SOILS
V. PAVEMENT DESIGN CALCULATION INPUTS
VI. PAVEMENT RECOMMENDATIONS & DISCUSSION
VII. MATERIALS RECOMMENDATIONS
APPENDICES
A – Location Map B – Laboratory Reports and Boring Logs C – Photographs D – AASHTO ’93 Flexible Pavement Design E – PG LTPPBIND Software F – Preliminary Pavement Recommendation Memo
I. INTRODUCTION
This report is written to provide pavement and materials recommendations for TX FLAP 709(1) Navarro Mills Lake Access. The project is located north of Dawson, Texas in Navarro County. FM 709 runs from the intersection of SH 31 on the south end of the project, 3.8 miles north to the Navarro Mills Marina entrance. The project roadway improvements are anticipated to be recycled aggregate base with cement, shoulder widening, new aggregate base course, and new hot asphalt concrete pavement. See Appendix A for location map.
The Preliminary Pavement Recommendations Memo was issued in July 2021. The memo provided the pavement recommendations as well as the proposed pay items. This memo is found in Appendix F. After numerous discussions between CFL and TXDOT, and considering partner preferences and local construction standards, the pavement recommendations have been finalized and are discussed in Part VI of this report.
II. CLIMATE
Climate data was obtained from noaa.gov. This data is summarized in Table 1 below.
The average annual precipitation for this area is approximately 19.14 inches.
Table 1: Weather Data
Month Average
HIGH (°F)
Average
LOW (°F)
Average
MEAN (°F)
Average
PRECIP. (in)
January 54.8 26.0 40.4 0.58
February 59.3 29.5 44.4 0.86
March 67.4 35.9 51.6 1.11
April 76.3 43.9 60.1 0.90
May 84.7 54.5 69.6 2.30
June 91.1 62.6 76.9 2.96
July 93.1 65.8 79.4 1.83
August 92.0 64.8 78.4 1.73
September 85.1 57.9 71.5 3.19
October 76.2 47.3 61.8 1.93
November 65.0 35.2 50.1 0.93
December 55.4 26.8 41.1 0.82
III. EXPLORATION
On June 22nd, 2021 CFLHD pavement & materials engineer Marty Fey completed a field investigation which included boring and subgrade sampling. Alliance Geotechnical Group was hired to assist with the field investigation. A CME 55 truck-mounted drill rig with an 8” O.D. solid stem auger was used to complete the borings. Pavement borings were logged at 9 locations along FM 709. Subgrade samples were collected and tested in the laboratory. CFL personnel logged the borings; this included depth of boring, visual soil classification, and pavement thickness at the bore hole. Pavement cores were not collected as a part of this investigation. Boring locations, test results, and other information is shown in Appendix B.
IV. EXISTING PAVEMENT & SOILS
The existing roadway was observed to consist of several chip seals on cemented roadbase. Preventative maintenance has been performed regularly. However, the surface is very uneven and the ride is rough. This roadway is a good candidate for recycling.
Pavement thickness was found to be 2 to 2.5 inches in depth at the locations drilled, supported by 7 to 10 inches of cemented road base.
Drilling efforts were relatively easy. The subgrade materials encountered are of poor quality. The subgrade soils encountered consisted primarily of silty and clayey sands and were classified primarily as A-6 and A-7. Subgrade soils exhibited low to moderate plasticity and had R-values of 8 to 57. Resistivity values were found to be low to moderate and follow up chloride and sulfate testing indicate a lower risk of sulfate and chloride attack. See the laboratory reports and boring logs in Appendix B for more information.
V. PAVEMENT DESIGN CALCULATION INPUTS
Design Parameters
Traffic counts and analysis for FM 709 were provided by TXDOT and were used for pavement section recommendations. An average daily traffic (ADT) of 600 and a truck percentage of 4.6% medium duty and 2.5% heavy duty for a 20-year period. The analysis provided by TXDOT as well as related design factors are included in Appendix D.
Design factors used in the ESALs calculations as well as the structural coefficients were taken from the CFLHD Project Development Design Manual (PDDM), Chapter 11.
Roadbed Soil Resilient Modulus
The soil resilient modulus was converted from R-Values, AASHTO T 190, using the following equation:
Resilient Modulus (psi) = 10[ ( S
+ 18.72 ) / 6.24 ] where S1 = [(R-Value – 5) / 11.29] + 3
The R-value was found to be low and varies between 8 and 57. An R-value of 10 was selected because it is estimated to represent most of the subgrade soils on the project.
This results in a design resilient modulus of 3,600 psi.
VI. PAVEMENT RECOMMENDATIONS & DISCUSSION
Utilizing AASHTO 93 Flexible Pavement Design (Appendix D), a 20-year pavement design required a Calculated Design Structural Number (SN) of 2.93. After evaluating alternatives, including partner preferences and local standards, the following is the recommended pavement structural section as shown in Table 2 and Figure 1.
Table 2: Recommended Pavement Section Layer Thickness
Hot Asphalt Concrete Pavement 2 inches Aggregate Base Course 8 inches Cement Treated Aggregate Base 6 inches
SN = 2.96
Figure 1: Typical Structural Section
VII. MATERIALS RECOMMENDATIONS
Cement
For the cement treated aggregate base layer, an application rate of 2% cement should be used for design purposes.
Asphalt Pavement
A minimum 50 gyration TXDOT mix will be specified.
Selection of Asphalt Binder
LTPPBind software was utilized to assist in the selection of asphalt binder. The information presented in LTPPBind is shown in Appendix E. A PG 64-22 binder is recommended. Consideration was given to the location of the project as well as TXDOT preference and performance of past projects in similar conditions.
Prime and Tack Coats, Blotter and Fog Seal
Prime Coat and Blotter are recommended for this project. Prime Coat should be applied between the aggregate base and asphalt pavement layers. An MC-70 or MC-30 grade prime coat per AASHTO M 82 will be specified.
Drainage and Subexcavation
During the field investigation, areas of pavement distress were present. However, they appeared to be caused due to fatigue and age. No major water damage or drainage problems pertaining to the existing traveled way were observed. If any drainage issues are encountered, the scope of the project allows for partial reconstruction. A quantity of 100 cubic yards of subexcavation should be included in the contract. This quantity should remain in the Contract in the event that areas in need of repair are encountered.
Bid Items
Suggested FP-14 pay items for the proposed structural section are shown in Table 3 below.
Table 3: Recommended Pay Items
Item Number Item Description Unit
20402-0000 Subexcavation CUYD
30101-0000 Aggregate Base TON
30703-0000 Cement Treated Aggregate Course CUYD
30715-0000 Cement TON
40301-0000 Asphalt Concrete Pavement TON
41102-0000 Prime Coat SQYD
41105-0000 Blotter TON
APPENDICES
A – Location Map
B – Laboratory Reports and Boring Log
C – Photographs
D – AASHTO ’93 Flexible Pavement Design
E – PG LTPPBind Software
F – Preliminary Pavement Recommendation Memo
Appendix A: Location Map
Appendix B: Laboratory Reports and Boring Logs
Project:
Sample Number
Station or Location
Offset from CL
Date Sampled
Depth of Bore
Container Type
Pavement/ABC Thickness R-Value Class
Liquid Limit / Plasticity
Index
Resistivity, ohm.cm pH Sulfate % Chloride %
0 to 2" 2" to 11" 11" to 3' 3' to 5' 0 to 2" 2" to 10" 10" to 5' 0 to 2" 2" to 9" 9" to 5' 0 to 2" 2" to 10" 10" to 2' 2' to 3.5' 3.5' to 5' 0 to 2" 2" to 10" 10" to 2' 2' to 3.5' 3.5' to 5' 0 to 2" 2" to 9" 9" to 1.5' 1.5' to 5' 0 to 2.5" 2.5" to 9.5" 9.5" to 5' 0 to 2" 2" to 9" 9" to 3' 3' to 5'
0 to 2"
2" to 12" SM / A-4 (0) NV / NP 12" to 5'
ABC Composite 6/22/2021 Composite sample of existing aggregate base course from borings P-1 through P-9.
P-2 0.5 Mi N of int SH 31
3.5' LT 6/22/2021 5'
5-gal bucket
Asphalt Classification SPT @ 4' 3 / 5 / 6Aggregate Base Course, Light Brown
SM / A-1-b (0) NV / NP
SC / A-6 (7)
49 SC-SM / A-2-4 (0)
3,050 8.2 0.006 0.0003Aggregate Base Course, Light Brown Sand Silty, Dark Brown, V. Soft, Moist
2" / 7"
57 SM / A-2-4 (0)
2" / 8" 45 SC-SM / A-4 (0) 24 / 7
NV / NP
34 / 22
30 / 15SC / A-6 (2)
22 /4
Sand Clayey, Dark Brown, Moist
Sand Clayey, Brown, Moist Sand Silty, Dark Brown, Moist
Sand Clayey, Dark Brown, Moist
Sand Silty, Brown, Moist
Truck Mounted CME 55 w/ 8" SSA Alliance Geotechnical Group Pavement Investigation - Shallow Borings and Cores - Log & Sampling Summary
0.00030.0048.13,710
2" / 7"
2.5" / 7"
2" / 10"
23 / 5
SC-SM / A-4 (0)
2" / 8"
4' RT 6/22/2021 5'
5-gal bucket
Asphalt Classification, Resistivity, pH, Sulfates, and
Chlorides SPT @ 4' 5 / 7 / 9Aggregate Base Course, Light Brown
Sand Clayey, Dark Brown, V. Moist, V. Soft
SPT @ 4' 4 / 4 / 4
SPT @ 4' 4 / 3 / 34' LT 6/22/2021 5'
5-gal bucket
Asphalt
Sand silty, Dark Brown, Moist, V. Soft
6/22/2021
Asphalt Aggregate Base Course, Light Brown
Sand Clayey, Gray Brown, V. Soft, Moist
Classification, R-Value5'
P-8 3.0 Mi N of int SH 31
P-9 3.5 Mi N of int SH 31
5-gal bucket
Classification, R-Value
4.5' RT 6/22/2021 5'
5-gal bucket
Asphalt
P-6
P-5
2.5 Mi N of
int SH 31
5-gal bucket
Asphalt
4.5' RT
2.0 Mi N of
int SH 31
Asphalt
ClassificationAggregate Base Course, Light Brown
P-7 2.7 Mi N of int SH 31
5-gal bucket
6/22/2021
5'
Aggregate Base Course, Light Brown
Aggregate Base Course, Light Brown
Sand Clayey, Dark Brown, Moist
Classification
5' 5-gal bucket
P-4 1.5 Mi N of int SH 31
4' LT
Comments
SPT @ 4' 2 / 3 / 5
SPT @ 4' 5 / 6 / 7
SPT @ 4' 19 / 27 / 50/4"
Testing Requested
TX FLAP FM709(1) Navarro Mills Lake Access Contractor:
Logged By: Equipment:Sampled By:Marty Fey Marty Fey
6/22/20213.5' RT
100' N of int SH 31
Boring Observations (grey = sample depth )
Asphalt Aggregate Base Course, Light Brown Sand Clayey, Brown, Moist
Asphalt P-3 1.0 Mi N of int SH 31
4' RT 6/22/2021 5'
5-gal bucket
Classification, Resistivity, pH, Sulfates, and
Chlorides
SPT @ 4' 3 / 1 / 2 2" / 7"
2" / 9"
2" / 8"
Classification, R-Value
Classification SPT @ 4' 4 / 7 / 9 Aggregate Base Course, Light Brown
Sand Clayey, Gray Brown, V. Soft, Moist
Sand Clayey, Dark Brown, V. Soft, Moist
Sand Clayey, Brown, Moist
Sand Clayey, Gray Brown, V. Soft, Moist
Classification4' LT
Sand Clayey, Brown, Moist, Soft
8 SC / A-6 (2) 31 / 18
37 / 26
P-1 5' 5-gal bucket
6/22/2021
SC / A-6 (6)
Appendix C: Photographs
Photo 1: FM 709, Start of project
Photo 2: CME 55 Drill Rig
Photo 3: Typical Driveway Culvert
Photo 4: Split spoon sampler
Photo 5: Damage at edge of roadway
Photo 6: Chip seal w/ ABC underneath
Photo 7: Traffic control
Photo 8: Drilling Operations
Photo 9: Standing water on shoulder
Photo 10: Measuring pavement and subgrade thickness
Photo 11: Box culvert
Photo 12: Sample collection
Photo 13: Typical subgrade material
Photo 14: End of project
Appendix D: AASHTO ’93 Flexible Pavement Design
AASHTO FLEXIBLE PAVEMENT DESIGN
Layer Thickness Determination Using Trial and Error
Recycled Aggregate Base w/ Cement
Layer Drainage Layer Layer No. Description Coefficient, ai Coefficient, mi Thickness, in SN
(topmost) Layer 1 AC Layer 0.40 1.00 2.00 0.80 Layer 2 ABC (302) 0.12 1.00 8.00 0.96 Layer 3 Recyled Base w/ Cement 0.20 1.00 6.00 1.20 Layer 4 Select Borrow 0.08 0.90 0.00 0.00 Layer 5 0.00 Layer 6 0.00 Layer 7 0.00
(bottommost) Layer 8 0.00 Subgrade Subgrade N/A N/A N/A N/A
AC Layer 401 = 0.44 Trial SN 2.96
403 = 0.40
CAB 301 = 0.14 Design SN to Match 2.93 Subbase/Minor agg 302 = 0.12
FDR 304 = 0.12 Design is sufficient Recycled Base w/ Cement 308 = 0.20
Select borrow 204 = 0.06 to 0.08
(Refer to Exhibit 11.2-C in Chapter 11 of PDDM for additional guidance on coefficients)
AASHTO FLEXIBLE PAVEMENT DESIGN
SN Determination
Design Inputs W18 = 140,000 ESALs Applications Over Design Period Typ. Range 50k to 10 million
R = 75 % Reliability Typ. Range 75 to 95%
So = 0.49 Standard Deviation AASHTO Standard
MR = 3,600 psi Subgrade Resilient Modulus Typ. Range 3000 to 15000 psi
Pi = 4.2 Initial Serviceability Typ. Range 4.2 to 4.4
Pt = 2 Terminal Serviceability Typ. Range 2.0 to 3.0
DESIGN SN = 2.93
Appendix E: PG LTPPBind Software
Five Closest Weather Stations For Latitude/Longitude= 32.053/96.453 Report Date: 7/21/2021 (LTPPBind V3.0 Alpha)
TX FLAP FM709(1) Navarro Mills Lake Access
General A=4 km B=27 km C=31 km D=45 km E=47 km Station ID TX2019 TX6210 TX0518 TX5869 TX3047 County/District navarro navarro ellis limestone freestone Weather Station corsicana navarro mills d bardwell dam mexia fairfield Elevation, m 120 128 130 151 122 Latitude, Longitude 32.08 ,96.47 31.95 ,96.7 32.27 ,96.63 31.68 ,96.48 31.73 ,96.18 Last Year Data Available 1997 1997 1997 1997 1997
Air Temperature Mean ( Std, N ) Mean ( Std, N ) Mean ( Std, N ) Mean ( Std, N ) Mean ( Std, N ) High Temperature 37.3 (16,35) 37.6 (13,35) 37.6 (14,33) 38.3 (16,34) 37.7 (19,30) Low Temperature ‐9.9 (29,35) ‐10.5 (29,35) ‐10.8 (31,32) ‐10.2 (33,35) ‐10.2 (32,31) Low Temperature Drop 29.5 (33,35) 30.4 (30,35) 29.9 (33,32) 30.1 (31,35) 28.4 (33,31) Degree‐Days > 10C 3959 (203,35) 3999 (176,35) 3972 (181,33) 4109 (224,34) 4110 (201,30)
PG High Low Rel. High Low Rel. High Low Rel. High Low Rel. High Low Rel.
Pavement Temperature, C 63.6 ‐04.1 63.8 ‐04.5 63.7 ‐04.8 64.5 ‐04.2 64.5 ‐04.2 50% Reliability PG 64‐10 (83,97) 64‐10 (67,97) 64‐10 (77,95) 70‐10 (98,96) 70‐10 (98,97) >50% Reliability PG 70‐10 (98,97) 70‐10 (98,97) 70‐10 (98,95) 70‐16 (98,98) 70‐16 (98,98)
= 70‐16 (98,98) 70‐16 (98,98) 70‐16 (98,98)
Appendix F: Preliminary Pavement Recommendation Memo
Subject: Preliminary Pavement & Materials Recommendations (V1) TX FLAP FM709(1) Navarro Mills Lake Access
From: Marty Fey Pavement & Materials Engineer, CFLHD
Through: Mike Voth Pavement & Materials Team Lead, CFLHD
To: Solomon Haile, Project Manager, CFLHD Stacy Diccicco, Design Engineer, CFLHD
INTRODUCTION
This memorandum provides preliminary pavement and material recommendations for the Navarro Mills Lake Access project located in Navarro County, north of Dawson, Texas.
FM 709 runs from the intersection of SH 31 on the south end of the project 3.8 miles north to the Navarro Mills Marina entrance. The project roadway improvements are anticipated to be full depth reclamation, shoulder widening, and new HACP.
CFLHD standards and guidelines were used to complete the pavement and materials recommendations.
FIELD INVESTIGATION
On June 22nd, 2021 CFLHD pavement & materials engineer Marty Fey completed a field investigation which included boring and subgrade sampling. Alliance Geotechnical Group was hired to assist with the field investigation. A CME 55 truck-mounted drill rig with an 8” O.D.
solid stem auger was used to complete the borings. Pavement borings were logged at 9 locations along FM 709. Subgrade samples were collected and tested in the laboratory. See the attached boring and testing logs for more detailed information.
Technical Memorandum
Date: July 23, 2021 Rev: July 28, 2021
The primary objectives of this field investigation were as follows:
Measure and record existing pavement and subgrade layer depths;
Gather subgrade soil samples for follow-up testing to determine engineering properties;
Evaluate and record pavement distress conditions;
Evaluate roadway and project area for constructability concerns.
The existing roadway consists of several chip seals on cemented roadbase. Preventative maintenance has been performed regularly. However, the surface is very uneven and the ride is rough. This roadway is a good candidate for full depth reclamation.
The information gathered as described above was used to support pavement rehabilitation, structural design, and material recommendations.
Below are summary tables of the data gathered and test results. For more complete and detailed results, see the attached logs and lab test reports.
Summary of Sampling & Test Results
Pavement Depth
Roadbase Depth
R‐value, subgrade
Plasticity Index
Comments
2 to 2 ½ inches
7 to 10 inches
8 to 57 NP to 26
Subgrade material consists primarily of Clayey and Silty Sands, A‐6 and A‐7. Some high plasticity clays were also observed. Low subgrade R‐values indicate the material has very poor support characteristics.
Resistivity values are low to moderate and indicate a potential increased risk of sulfate and chloride attack. Laboratory testing for chloride and sulfate content is being performed and results will be added when available.
TRAFFIC:
Traffic counts and analysis for FM 709 were provided by TXDOT and were used for pavement section recommendations. The following is a summary of traffic data as well as the estimated ESALs and structural number used for design:
2022 ADT = 600
2042 ADT = 800 (1.5% growth rate) 2022 % trucks = 4.6% medium duty, 2.5% heavy duty Directional factor = 57% Design Lane ESAL’s = 118,000 Structural Number = 3.0
For areas of roadway widening, aggregate roadbase will need to be imported and cemented to the same depth as the FDR.
The following is the recommended pavement structural section:
Layer Thickness HACP 3 inches (two lifts) FDR or ABC w/ Cement 9 inches
SN 3.0
ADDITIONAL RECOMMENDATIONS:
The asphalt binder grade should be PG 70-16. This aligns with recommendations from LTPPBind and local standards.
Include a nominal amount of subexcavation (~300 cu yd) to be used at discretion of the
CO.
A cement application rate of 4% should be used for estimating quantities.
Recommend the following bid items.
Item Number Item Description Unit 20402-0000 Subexcavation CUYD 30202-2000 Roadway Aggregate, Method 2 TON 30501-xxxx Full Depth Reclamation w/ Cement, 9” SQYD 30510-0000 Cementitious Material TON 40301-0000 Asphalt Concrete Pavement TON 40601-0000 Fog Seal TON 40605-0000 Blotter TON 41101-0000 Prime Coat TON 41201-0000 Tack Coat TON
CONSTRUCTION CONSIDERATIONS & SPECIAL CONTRACT PROVISIONS
The contractor should expect to encounter some soft and moist subgrades during construction.
A pay item will need to be created for FDR w/ Cement, 9 inches.
CFLHD standard SCR’s related to pavements & materials will be used. A SCR for section 305 will need to be developed to guide the contractor on blending FDR mainline and ABC widening area during cement application. If the decision is made to use a local borrow source and/or develop a source, an SCR may need to be developed.
| 2024-08-30T09:47:34-0600 | |
| MICHAEL D VOTH |
| 2024-08-30T09:47:13-0600 | |
| MICHAEL D VOTH |
File details come from the government source that posted it. Updated .