The International Boundary and Water Commission United States-Mexico is soliciting proposals to rehabilitate approximately 19,730 linear feet of existing sewer pipelines known as the Trunkline and International Outfall Interceptor in Nogales, Arizona, with an option to rehabilitate an additional 8,634 linear feet. The solicitation seeks cured-in-place pipe installation, manhole rehabilitation, and other repairs to address pipeline condition issues. Evaluation criteria include technical approach, past performance, and price. The most recent amendment extended the response deadline to April 29, 2021.

There is no set-aside designation. The primary NAICS code is 237110 and PSC code is N071. The estimated total value is $15-20 million over three phases to be completed within 960 calendar days from award. Key details include rehabilitation of over 100 manholes and approximately 46,436 linear feet of reinforced concrete and unreinforced concrete pipe ranging from 24 to 42 inches in diameter. The place of performance is Rio Rico, Arizona. Incumbent contractors have performed previous rehabilitation work along these pipelines.

Notice text

14 versions

Update #14 · Latest ·

A00012

See SF 30 document for further information.

The proposal due date remains unchanged at 29 April 2021, no later than 3:00 pm MST.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00011

The purpose of Amendment 00011 is to notify all potential Offerors of the changes listed below:

  1. Revised Technical Specifications regarding pay estimate processing with IPP. See Specifications page 3 for changes to Section 01.29.00.

The proposal due date remains unchanged at 29 April 2021 no later than 3:00pm MST.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00010

The purpose of Amendment 00010 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to Thursday, April 29, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Revised Technical Specifications for CFSMRS qualifications. See Specifications page 3 for list of all changes.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00009

The purpose of Amendment 00009 is to notify all potential Offerors of the changes listed below:

  1. Incorporate the payment process for the Invoice Processing Platform (IPP). See Solicitation Section G.04 (page 16).
  2. Revised Technical Specifications. See Specifications page 3 for list of all changes.

The proposal due date remains unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00008

The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below:

1. Revised proposal submission date to Tuesday, April 20, 2021 at 3:00 PM MDT. See Solicitation SF-1442.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00007

The purpose of Amendment 00007 is to:

1.            Post a last additional question and answer received against the solicitation (missed in prior amendment).

2.            Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.

3.            Revised Technical Specifications. See Specifications page 3 for list of all changes.

Proposal due date remains unchanged.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #13 ·

A00011

The purpose of Amendment 00011 is to notify all potential Offerors of the changes listed below:

  1. Revised Technical Specifications regarding pay estimate processing with IPP. See Specifications page 3 for changes to Section 01.29.00.

The proposal due date remains unchanged at 29 April 2021 no later than 3:00pm MST.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00010

The purpose of Amendment 00010 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to Thursday, April 29, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Revised Technical Specifications for CFSMRS qualifications. See Specifications page 3 for list of all changes.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00009

The purpose of Amendment 00009 is to notify all potential Offerors of the changes listed below:

  1. Incorporate the payment process for the Invoice Processing Platform (IPP). See Solicitation Section G.04 (page 16).
  2. Revised Technical Specifications. See Specifications page 3 for list of all changes.

The proposal due date remains unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00008

The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below:

1. Revised proposal submission date to Tuesday, April 20, 2021 at 3:00 PM MDT. See Solicitation SF-1442.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00007

The purpose of Amendment 00007 is to:

1.            Post a last additional question and answer received against the solicitation (missed in prior amendment).

2.            Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.

3.            Revised Technical Specifications. See Specifications page 3 for list of all changes.

Proposal due date remains unchanged.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #12 ·

A00010

The purpose of Amendment 00010 is to notify all potential Offerors of the changes listed below:

  1. Revised proposal submission date to Thursday, April 29, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Revised Technical Specifications for CFSMRS qualifications. See Specifications page 3 for list of all changes.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00009

The purpose of Amendment 00009 is to notify all potential Offerors of the changes listed below:

  1. Incorporate the payment process for the Invoice Processing Platform (IPP). See Solicitation Section G.04 (page 16).
  2. Revised Technical Specifications. See Specifications page 3 for list of all changes.

The proposal due date remains unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00008

The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below:

1. Revised proposal submission date to Tuesday, April 20, 2021 at 3:00 PM MDT. See Solicitation SF-1442.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00007

The purpose of Amendment 00007 is to:

1.            Post a last additional question and answer received against the solicitation (missed in prior amendment).

2.            Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.

3.            Revised Technical Specifications. See Specifications page 3 for list of all changes.

Proposal due date remains unchanged.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #11 ·

A00009

The purpose of Amendment 00009 is to notify all potential Offerors of the changes listed below:

  1. Incorporate the payment process for the Invoice Processing Platform (IPP). See Solicitation Section G.04 (page 16).
  2. Revised Technical Specifications. See Specifications page 3 for list of all changes.

The proposal due date remains unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00008

The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below:

1. Revised proposal submission date to Tuesday, April 20, 2021 at 3:00 PM MDT. See Solicitation SF-1442.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00007

The purpose of Amendment 00007 is to:

1.            Post a last additional question and answer received against the solicitation (missed in prior amendment).

2.            Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.

3.            Revised Technical Specifications. See Specifications page 3 for list of all changes.

Proposal due date remains unchanged.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #10 ·

A00009

The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below:

  1. Incorporate the payment process for the Invoice Processing Platform (IPP). See Solicitation Section G.04 (page 16).
  2. Revised Technical Specifications. See Specifications page 3 for list of all changes.

The proposal due date remains unchanged.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00008

The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below:

1. Revised proposal submission date to Tuesday, April 20, 2021 at 3:00 PM MDT. See Solicitation SF-1442.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00007

The purpose of Amendment 00007 is to:

1.            Post a last additional question and answer received against the solicitation (missed in prior amendment).

2.            Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.

3.            Revised Technical Specifications. See Specifications page 3 for list of all changes.

Proposal due date remains unchanged.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #9 ·

A00008

The purpose of Amendment 00008 is to notify all potential Offerors of the changes listed below:

1. Revised proposal submission date to Tuesday, April 20, 2021 at 3:00 PM MDT. See Solicitation SF-1442.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00007

The purpose of Amendment 00007 is to:

1.            Post a last additional question and answer received against the solicitation (missed in prior amendment).

2.            Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.

3.            Revised Technical Specifications. See Specifications page 3 for list of all changes.

Proposal due date remains unchanged.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #8 ·

A00007

The purpose of Amendment 00007 is to:

1.            Post a last additional question and answer received against the solicitation (missed in prior amendment).

2.            Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.

3.            Revised Technical Specifications. See Specifications page 3 for list of all changes.

Proposal due date remains unchanged.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #7 ·

A00006

The purpose of Amendment 00006 is to notify all potential Offerors of the changes listed below:

  • Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  • Revised Technical Specifications. See Specifications page 3 for list of all changes.
  • Post the additional questions and answers received against the solicitation.
  • Attach all available manhole photos.
  • Attach TCE agreements finalized to date.

NOTE:

Manhole photos are available at the following link:

https://www.ibwc.gov/Files/MH_Photos.zip

The link is available from 3/31/21 through 4/14/21. At 2:00 pm MST on 4/14/21 the link will be deactivated. The photos will not be provided in any other manner.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #6 ·

A00005

The purpose of Amendment 00005 is to notify all potential Offerors of changes to this requirement.

  1. Revised proposal submission date to April 14, 2021 at 3:00 PM MDT. See Solicitation SF-1442.
  2. Corrections to Solicitation FAR Clauses 52.219-9 and 52.222-23. See Solicitation pages 5, 31, and 47.
  3. Addition of Solicitation attachments. See Solicitation Section J (page 37) for updated list.
  4. Post the questions and answers received against the solicitation.
  5. If additional questions arise after review of the answers to initial questions and revisions to the Solicitation documents, written questions shall be submitted to Carmella.Speer@ibwc.gov by 12:00 PM MDT on Thursday, March 25, 2021.
  6. Revised drawings for Phases 1 and 3.
  7. Revised Technical Specifications. See Specifications page 3 for list of all changes.
  8. Attach the sign in sheet from the site visit.
  9. Attach the Pre-proposal Key Points for Contractors.
  10. Attach all available CCTV videos. Link to videos contained within the attached amendment.
  11. Updated Manhole #89 As-builts with shoring piles abandoned in place and geotechnical report.
  12. Rio Rico sewer line drawings and photos.
  13. UPRR Maintenance Consent Letter for USIBWC permit.
  14. Various UPRR guidelines required.
  15. Flow reports from the NIWTP for calendar year 2020.

All supporting documents, the revised solicitation, and amendment A00005 are attached to this notice.

----------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00004
The purpose of Amendment 00004 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #5 ·

Amendment A00004
The purpose of Amendment 00002 is to notify all potential offerors of the changes listed below:
1. Addition of new CLINs for IOI manhole & wash repairs. See Solicitation Section B Schedule.
2. Addition of Solicitation attachments. See Solicitation Section J.
3. Revised Technical Specifications. See Specifications page 2 for list of all changes.
4. Addition of work for IOI manhole & wash repairs. See new drawing attachments, provided in full-size and half-size drawings

See attached SF 30, revised solicitation, and specification documents for further information

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #4 ·

Amendment A00003

The purpose of Amendment 00003 is to notify all potential offerors of the following changes:

  1. Revised proposal submission date to 3/29/2021. See Solicitation SF-1442.
  2. Revised pre-proposal conference and site visit date to 2/23/2021. See Solicitation Section L.01.
  3. Revised dates for notification of attendees and advance questions for pre-proposal conference to 2/22/2021. See Solicitation Section L.01.
  4. Revised final due date of all questions to 3/8/2021. See Solicitation Section L.01.
  5. Revised assumed NTP date for use in Technical Factor 5. Construction Schedule to 6/1/2021. See Solicitation Section L.06.

A revised copy of solicitation 191BWC21R0002 and Amendment A00003 are attached.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #3 ·

Amendment A00002

The purpose of Amendment 00002 is to notify all potential orrerors the due date of Past Performance Questionnaires has been changed from 22 January 2021 to 26 February 2021. Attached is a revised Client Authorization Letter. There are no other changes at this time.

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #2 ·

Amendment A00001

The purpose of Amendment 00001 is to incorperate the wage determinations into the solicitation. Wage Determinations AZ20200009 dated 06/05/2020 and AZ20200036 dated 08/21/2020 apply to this procurement.

----------------------------------------------------------------------------------------------------------

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Update #1 ·

The United States Section of the International Boundary and Water Commission (USIBWC) is issuing a solicitation (negotiated) for the purpose of rehabilitating approximately 19,730 linear feet of the existing sewer pipeline known as the Trunkline and International Outfall Interceptor (IOI) in Nogales, Arizona with an option to rehabilitate an additional 8,634 linear feet.

See solicitation and attachments for further details.

Files

File Type Posted
191BWC21R0002 Amendment A00012.pdf PDF
191BWC21R0002 Amendment A00011.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210421.pdf PDF
191BWC21R0002 Revised Per A00011.pdf PDF
191BWC21R0002 Revised Per A00010.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210414.pdf PDF
191BWC21R0002 Amendment A00010.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210412.pdf PDF
191BWC21R0002 Revised Per A00009.pdf PDF
191BWC21R0002 Amendment A00009.pdf PDF
191BWC21R0002 Amendment A00008.pdf PDF
191BWC21R0002 Revised Per A00008.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210406.pdf PDF
Last Question and Answer Received Against 191BWC21R0002.pdf PDF
191BWC21R0002 Revised Per A00007.pdf PDF
191BWC21R0002 Amendment A00007.pdf PDF
191BWC21R0002 Amendment A00006_draft.pdf PDF
USIBWC TCE Parcel 102-01-038_Delta_Final.pdf PDF
USIBWC TCE Parcel 140-01-005_Delta_Final.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210331.pdf PDF
191BWC21R0002 Revised Per A00006.pdf PDF
USIBWC TCE Parcel 102-01-076A_Sainz_Final.pdf PDF
191BWC21R0002 Amendment A00006.pdf PDF
USIBWC TCE Parcel 140-01-001A_Harvey_Final.pdf PDF
USIBWC TCE Parcel 113-38-007A_Delta_Final.pdf PDF
Additional Questions and Answers Received Against 191BWC21R0002.pdf PDF
191BWC21R0002 Amendment A00005.pdf PDF
Manhole 89 As-Builts_201710_Rev.pdf PDF
Questions and Answers Received Against 191BWC21R0002.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210317.pdf PDF
TIOI Revised Drawings_A00005.pdf PDF
Rio Rico Forcemain Drawings and Photos.pdf PDF
NIWTP Flow Reports_Jan-Dec2020.pdf PDF
UPRR Requirements and Guidelines.pdf PDF
TIOI PH1-3 Pre-Proposal Key Points to Contractors.pdf PDF
191BWC21R0002 Sol Revised Per A00005.pdf PDF
UPRR IOI MCL Folder03060-53.pdf PDF
TIOI Pre-Proposal Sign-in.pdf PDF
191BWC21R0002 Revised Per A00004.pdf PDF
191BWC21R0002 Revised Per A00004.pdf PDF
191BWC21R0002 IOI MH Repair FS 20210205.pdf PDF
191BWC21R0002 IOI MH Repair HS 20210205.pdf PDF
191BWC21R0002 Revised Per A00004.pdf PDF
191BWC21R0002 Amendment A00004.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210205.pdf PDF
191BWC21R0002 AMENDMENT A00001.pdf PDF
191BWC21R0002 AMENDMENT A00002.pdf PDF
191BWC21R0002 REVISED.pdf PDF
191BWC21R0002 AMENDMENT A00003.pdf PDF
191BWC21R0002 Client Authorization Letter_Rev.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
Trunkline and IOI Rehabilitation Phases 1-3 Award Award Notice
This notice Latest solicitation Solicitation
Trunkline and IOI Rehabilitation Phases 1-3 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
GRCA 257282 - Replace South Rim Wastewater Treatment Plant, Grand Canyon, AZ NAICS 221320 National Office No set-aside
Operations and Maintenance (O&M) Services for the SBIWTP San Ysidro, California 92173, United States · NAICS 221320 International Boundary and Water Commission U.S.-Mexico No set-aside
Bgndrf piping upgrades NAICS 237110 Bureau of Reclamation Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors