191BWC21R0002 IOI MH Repair HS 20210205.pdf

PDF 2 MB Posted

Attached to
Trunkline and IOI Rehabilitation Phases 1-3
Solicitation number
191BWC21R0002
Issued by

About this file

This solicitation package includes engineering drawings and specifications for the rehabilitation of approximately 19,730 linear feet of existing sewer pipeline known as the Trunkline and International Outfall Interceptor in Nogales, Arizona. Key details include rehabilitation of the pipelines through concrete encasement of reinforced concrete pipe sections, slope repairs around Manholes 86, 87, and 93, and replacement of approximately 34 feet of reinforced concrete pipe encasement. The drawings provide plans, profiles, sections and construction details for concrete encasement and slope stabilization work. The solicitation also includes an option to rehabilitate an additional 8,634 linear feet of pipeline. The solicitation is issued by the United States Section of the International Boundary and Water Commission for a negotiated procurement to solicit proposals due by June 30, 2022.

View the file

Other files

File Type Posted
191BWC21R0002 Amendment A00012.pdf PDF
191BWC21R0002 Amendment A00011.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210421.pdf PDF
191BWC21R0002 Revised Per A00011.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210414.pdf PDF
191BWC21R0002 Amendment A00010.pdf PDF
191BWC21R0002 Revised Per A00010.pdf PDF
191BWC21R0002 Revised Per A00009.pdf PDF
191BWC21R0002 Amendment A00009.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210412.pdf PDF
191BWC21R0002 Revised Per A00008.pdf PDF
191BWC21R0002 Amendment A00008.pdf PDF
191BWC21R0002 Revised Per A00007.pdf PDF
Last Question and Answer Received Against 191BWC21R0002.pdf PDF
191BWC21R0002 Amendment A00007.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210406.pdf PDF
USIBWC TCE Parcel 113-38-007A_Delta_Final.pdf PDF
USIBWC TCE Parcel 140-01-005_Delta_Final.pdf PDF
USIBWC TCE Parcel 102-01-076A_Sainz_Final.pdf PDF
191BWC21R0002 Amendment A00006_draft.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210331.pdf PDF
Additional Questions and Answers Received Against 191BWC21R0002.pdf PDF
USIBWC TCE Parcel 140-01-001A_Harvey_Final.pdf PDF
USIBWC TCE Parcel 102-01-038_Delta_Final.pdf PDF
191BWC21R0002 Amendment A00006.pdf PDF
191BWC21R0002 Revised Per A00006.pdf PDF
Rio Rico Forcemain Drawings and Photos.pdf PDF
UPRR IOI MCL Folder03060-53.pdf PDF
TIOI Pre-Proposal Sign-in.pdf PDF
UPRR Requirements and Guidelines.pdf PDF
191BWC21R0002 Amendment A00005.pdf PDF
191BWC21R0002 Sol Revised Per A00005.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210317.pdf PDF
Questions and Answers Received Against 191BWC21R0002.pdf PDF
TIOI Revised Drawings_A00005.pdf PDF
TIOI PH1-3 Pre-Proposal Key Points to Contractors.pdf PDF
NIWTP Flow Reports_Jan-Dec2020.pdf PDF
Manhole 89 As-Builts_201710_Rev.pdf PDF
191BWC21R0002 Revised Per A00004.pdf PDF
191BWC21R0002 Revised Per A00004.pdf PDF
191BWC21R0002 Revised Per A00004.pdf PDF
191BWC21R0002 TIOI Rehab PH1-3 Specs 20210205.pdf PDF
191BWC21R0002 Amendment A00004.pdf PDF
191BWC21R0002 IOI MH Repair FS 20210205.pdf PDF
191BWC21R0002 AMENDMENT A00001.pdf PDF
191BWC21R0002 AMENDMENT A00003.pdf PDF
191BWC21R0002 REVISED.pdf PDF
191BWC21R0002 AMENDMENT A00002.pdf PDF
191BWC21R0002 Client Authorization Letter_Rev.docx DOCX document
AZ20200036 08.21.2020.pdf PDF
Show 40 more

Latest 50 of 71 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6" min 6" min

30"

#4 @ 24" stirrups or

U bars

6" min

6" min

RCP Bell OD + min 12"

RCP Bell OD

+ min 12"

8 - #6 longitudinal bars

389+50 390+00 390+50

MH 87

URS Sta 390+61.25

As Built Sta 390+94.46

35353535

URS Sta 389+54.26

MH 86

As Built Sta 389+82.82

46' estimated existing encasement

34' estimated max new encasement

CA

AZ

N V

N M

SO

N

O

RA

TX

CO

AH

U

IL

A

O K

BA

JA

CH

IH

U

AH

U A

CA N

BA

JA

CA

S

LE

O

N

DU

RA

N

GO

N

U N

I T E D

S T A

T E

S

M

EX

IC

O

M

EX

IC

O

U N

IT

ED

ST

AT

ES

02-05-2021

I B

W C

B

W c t b

26461

IOI RCP CONCRETE

ENCASEMENT

R E

H A

B I L

I T

I O

N

I M

P R

O V

E M

E N

T S

P

H A

E

M H

T

O

M

H

R

C

N C

A S

E M

E N

T

F O

R

C

O N

S T

R U

C T

I O

N

I N

T E

R N

A T

I O

N A

L

O

U T

F A

L

I

T E

R C

E P

T O

R

USIBWC HQ-ESD

A N

S I

F u l l

B l e e d

B

X

I n c h e s

D W

G

T o

P

D F p c

191BWC21R0002

3 4 5

2 3 4

United States Section

SOLICITATION/RFP NUMBER

s

L M

S

T e c h

P l o t

S t y l e

T a b l e

N a m e

P a p e r

S i z e

C A

D

F i l e n a m e

1 2

D

C

B

A

International Boundary & Water Commission

D

C

B

A

IN

TE

RN

AT

IO

N

AL

B

O U

N

DA

RY

A

N D

W

AT

ER

C

O M

M

IS

SI

O

N U

N

IT

ED

S

TA

TE

S

AN

D M

EX

IC

O U

N

IT

ED

S

TA

TE

S

SE

CT

IO

N

R E

V

N

O D

E S

C R

I P

T I O

N

O

F

R

E V

I S

I O

N S

I G

N A

T U

R

O

F

D

E S

I G

N E

R

A

D

A T

E

CONTRACT NUMBER

P l o t

S c a l e

P l o t

D e v i c e

A u t o C

V e r s i o n

I N

T E

R

N

A

T

I

O

N

A

L

B

O

U

N

D

A R

Y A N

D

W

A

T

E

R

C

O

M

M

I S

S

I O

N

C

O

I

M

O

I

S

N

C

A

R

N

T

E

N

I

D

E

LA

N

O I

T

E

S

M

I

I

L

E

Y

A

U

S

A

G

D a t e a n d

T i m e

P l o t t e d

A

M

D a t e

L a s t

S a v e d

A

M

I O

I

M

H

R e p a i r d w g

IBWC Border V20170817

S h e e t S e t

N a m e

RCP ENCASEMENT DETAIL

Typical Section for 30" RCP

NOTES:

1. Detail 3 based upon Pipe Encasement Detail on as built drawing 22143 (Sht 42), Nogales International Sanitation Project, Outfall Pipeline, Plan & Profile STA.

451+00 to STA. 463+00, dated 5/1/1971.

2. New and existing encasement is estimated. URS stationing and distances between manholes varies from as built drawing 22137 (Sht 36), Nogales International

Sanitation Project, Outfall Pipeline, Plan & Profile STA. 379+00 to STA. 391+00, dated 5/1/1971.

3. Confirm with COR and Construction Inspector location of new encasement prior to beginning work.

4. See Specification Section 33.05.39.73 for additional RCP encasement requirements.

5. Existing ground contours and profile stationing is based upon URS 2013 survey and matches that shown on I-CU-2037. Current site conditions differ.

6. Drill and epoxy to a minimum depth of 9 inches, 6 - #6 90° hooks spaced approximately evenly around existing RCP encasement. Thoroughly clean and roughen existing encasement prior to placing new concrete encasement directly adjacent.

7. Manholes and RCP are estimated representations based up Nogales International Sanitation Project, Outfall Pipeline 5/1/1971 as built drawings.

8. Riprap (18 inch nominal) to be placed along bank upstream and downstream of MH 86 to a depth of at least 2 ft. Confirm with COR and Construction Inspector location and extent of new riprap prior to beginning work. Limits of riprap surrounding MH 86 will depend on existing conditions. Remove all debris prior to placement. Existing riprap and roots of established trees to be left in place. See Specification Section 31.37.00 for additional riprap requirements.

9. See URS Drawing I-CU-2037 for other work in this area.

ADMIN APPROVAL

DESIGNED

TECHNICAL APPROVAL

CHECKED

DRAWN

C. Cadillo

A. Glover

Andrea Glover, PE

Orientation of manhole foundations is not known.

Typical layout shown.

MH 86

MH87

PLAN VIEW OF RCP ENCASEMENT

PROFILE OF RCP ENCASEMENT

Looking upstream

46' estimated existing encasement

34' estimated max new encasement

Approximate existing ground July 2020

0 123 6

0 123 6

No vertical exaggeration

See Note 5

End of encasement near

MH 86 will depend upon existing site conditions.

Begin new encasement adjacent to existing working toward MH 86.

Install #6 hooks into existing encasement per Note 5.

Existing ground

URS survey

2/5/2021

Expires: 6/30/2022

+200

+10 +30 +40 +50-10-20-30-40

CA

AZ

N V

N M

SO

N

O

RA

TX

CO

AH

U

IL

A

O K

BA

JA

CH

IH

U

AH

U A

CA N

BA

JA

CA

S

LE

O

N

DU

RA

N

GO

N

U N

I T E D

S T A

T E

S

M

EX

IC

O

M

EX

IC

O

U N

IT

ED

ST

AT

ES

02-05-2021

I B

W C

B

W c t b

26462

MH 93 SITE

R E

H A

B I L

I T

I O

N

I M

P R

O V

E M

E N

A

S

L O

P

A I R

F O

R

C

O N

S T

R U

C T

I O

N

I N

T E

R N

A T

I O

N A

L

O

U T

F A

T E

R C

E P

T O

R

USIBWC HQ-ESD

A N

S I

F u l l

B l e e

I n c h e s

D W

G

T o

P

D F p c

191BWC21R0002

3 4 5

2 3 4

United States Section

SOLICITATION/RFP NUMBER

s

L M

S

T e c h

P l o t

S t y l e

T a b l e

N a m e

P a p e r

S i z e

C A

D

F i l e n a m e

1 2

D

C

B

A

International Boundary & Water Commission

D

C

B

A

IN

TE

RN

AT

IO

N

AL

B

O U

N

DA

RY

A

N D

W

AT

ER

C

O M

M

IS

SI

O

N U

N

IT

ED

S

TA

TE

S

AN

D M

EX

IC

O U

N

IT

ED

S

TA

TE

S

SE

CT

IO

N

R E

V

N

O D

E S

C R

I P

T I O

N

O

F

R

E V

I S

I O

N S

I G

N A

T U

D

E S

I G

N E

R

A

T

E

CONTRACT NUMBER

P l o t

S c a l e

P l o t

D e v i c e

A u t o C r s i o n

I N

T E

R

N

A

T

I

O

N

A

L

B

O

U

N

D

A R

Y A N

D

W

A

T

E

R

C

O

M

M

I S

S

I O

N

C

O

I

M

O

I

S

N

C

A

R

N

T

E

N

I

D

E

LA

N

O I

T

E

S

M

I

I

L

E

Y

A

U

S

A

G

D a t e a n d

T i m e

P l o t t e d

A

M

D a t e

L a s t

S a v e d

A

M

I O

I

M

H

R e p a i r d w g

IBWC Border V20170817

S h e e t S e t

N a m e

NOTES:

1. Contractor to survey site and verify size/location of existing storm drain (CMP) prior to creating a work plan.

2. Contractor to choose how to repair slope, but shall submit a full work plan per Specification Section 31.25.00 to the COR for compliance confirmation.

3. Work around MH 93 shall restore site to approximately match 2013 contours while ensuring full cover for MH 93. Stormwater flows have caused erosion on the slope slightly downstream of MH 93.

4. Existing ground is based upon URS 2013 survey and matches that shown on I-CU-2040. Current site conditions differ.

5. See USIBWC Drawings 26463 and 26464 for two options of slope repair.

6. See URS Drawing I-CU-2040 for other work in this area.

ADMIN APPROVAL

DESIGNED

TECHNICAL APPROVAL

CHECKED

DRAWN

C. Cadillo

A. Glover

Andrea Glover, PE

PLAN VIEW OF MH 93 SLOPE WORK

A

26462

PROFILE OF MH 93 SLOPE WORK

Looking downstream

Approximate existing ground July 2020

No vertical exaggeration

Existing ground

URS survey

26462

A

26462

A

0 102.5 5

IOI RCP top at approx 3495.23

Estimated location of stormwater CMP

0 205 10

Approximate location of stormwater CMP

MH 93

Estimate of 2013 slope toe

Creek

Creek

+10 +30 +40 +50-10-20-30-40

CA

AZ

N V

N M

SO

N

O

RA

TX

CO

AH

U

IL

A

O K

BA

JA

CH

IH

U

AH

U A

CA N

BA

JA

CA

S

LE

O

N

DU

RA

N

GO

N

U N

I T E D

S T A

T E

S

M

EX

IC

O

M

EX

IC

O

U N

IT

ED

ST

AT

ES

02-05-2021

I B

W C

B

W c t b

26463

MH 93 SITE WORK

DETAILS OPTION 1

R E

H A

B I L

I T

I O

N

I M

P R

O V

E M

E N

A

S

L O

P

A I R

F O

R

C

O N

S T

R U

C T

I O

N

I N

T E

R N

A T

I O

N A

L

O

U T

F A

T E

R C

E P

T O

R

USIBWC HQ-ESD

A N

S I

F u l l

B l e e

I n c h e s

D W

G

T o

P

D F p c

191BWC21R0002

3 4 5

2 3 4

United States Section

SOLICITATION/RFP NUMBER

s

L M

S

T e c h

P l o t

S t y l e

T a b l e

N a m e

P a p e r

S i z e

C A

D

F i l e n a m e

1 2

D

C

B

A

International Boundary & Water Commission

D

C

B

A

IN

TE

RN

AT

IO

N

AL

B

O U

N

DA

RY

A

N D

W

AT

ER

C

O M

M

IS

SI

O

N U

N

IT

ED

S

TA

TE

S

AN

D M

EX

IC

O U

N

IT

ED

S

TA

TE

S

SE

CT

IO

N

R E

V

N

O D

E S

C R

I P

T I O

N

O

F

R

E V

I S

I O

N S

I G

N A

T U

D

E S

I G

N E

R

A

T

E

CONTRACT NUMBER

P l o t

S c a l e

P l o t

D e v i c e

A u t o C r s i o n

I N

T E

R

N

A

T

I

O

N

A

L

B

O

U

N

D

A R

Y A N

D

W

A

T

E

R

C

O

M

M

I S

S

I O

N

C

O

I

M

O

I

S

N

C

A

R

N

T

E

N

I

D

E

LA

N

O I

T

E

S

M

I

I

L

E

Y

A

U

S

A

G

D a t e a n d

T i m e

P l o t t e d

A

M

D a t e

L a s t

S a v e d

A

M

I O

I

M

H

R e p a i r d w g

IBWC Border V20170817

S h e e t S e t

N a m e

NOTES:

1. Contractor to choose how to repair slope, but shall submit a full work plan per Specification Section 31.25.00 to the COR for compliance confirmation. This drawing and USIBWC Drawing 26464 offer two options for slope repair.

2. The top and sides of the slope repair shall be placed to match existing contours.

3. Confirm with COR and Construction Inspector location of all construction prior to beginning actual sitework.

4. Remove all trash, debris, loose material, and small brush/vegetation prior to beginning work. Small trees may be removed to aid in construction.

5. Gabions shall be sized as 3 ft x 3 ft with the length determined by the Contractor. Gabions are usually available in lengths of

6, 9, and 12 ft.

6. The first and last gabion shall be embedded at least 5 ft into the slope to prevent water from eroding behind the gabions.

Confirm location with COR and Construction Inspector.

7. CMPs and any end sections shall be joined together using CMP metal bands.

8. A flared end section is not required at the end of the new CMP, but the Contractor may choose to use one as part of their slope protection method.

9. The Contractor may use a minimum 5 inch thick reinforced shotcrete/concrete for slope protection between the end of the new CMP and the gabions or other compliance confirmed method of slope protection.

10. Shotcrete/concrete reinforcement is only included to keep concrete together in one unit. Therefore, any of the following reinforcement is acceptable for use:

10.1. W2.9 x W2.9

10.2. W4.0 x W4.0

10.3. W5.0 x W5.5

10.4. #3 bars at 12" both ways

10.5. #4 bars at 12" both ways

ADMIN APPROVAL

DESIGNED

TECHNICAL APPROVAL

CHECKED

DRAWN

C. Cadillo

A. Glover

Andrea Glover, PE

Compacted backfill

No vertical exaggeration

Extend CMP at

5% slope

0 102.5 5

Estimated location of stormwater CMP

0 205 10

Approximate extents of slope work

Approximate location of stormwater CMP

MH 93

Creek

Creek

Construct concrete or other impermeable slope to allow

CMP water to flow to creek without eroding slope

Backfill around and over new CMP to re-establish

2013 contours

Front face of gabion at +35 pr as agreed with

COR and Inspector

Bury gabion approx

2 ft into channel

Geotextile

Fill over and around new CMP to re-establish 2013 contours

Typical finished grading

Approximate extents of impermeable slope protection

New CMP

2/5/2021

Expires: 6/30/2022

OPTION 1 - PLAN VIEW OF MH 93 SLOPE WORK

OPTION 1 - TYPICAL SECTION MH 93 SLOPE WORK

Along approximate centerline of flow path

See Note 6.

See Note 6.

Topsoil not shown, but finished slope to be revegetated per

Section 32.92.00

Min 2xCMP Ø

Build min 4" high curb or lip around concrete slope protection

+10 +30 +40 +50-10-20-30-40

CA

AZ

N V

N M

SO

N

O

RA

TX

CO

AH

U

IL

A

O K

BA

JA

CH

IH

U

AH

U A

CA N

BA

JA

CA

S

LE

O

N

DU

RA

N

GO

N

U N

I T E D

S T A

T E

S

M

EX

IC

O

M

EX

IC

O

U N

IT

ED

ST

AT

ES

02-05-2021

I B

W C

B

W c t b

26464

MH 93 SITE WORK

DETAILS OPTION 2

R E

H A

B I L

I T

I O

N

I M

P R

O V

E M

E N

A

S

L O

P

A I R

F O

R

C

O N

S T

R U

C T

I O

N

I N

T E

R N

A T

I O

N A

L

O

U T

F A

T E

R C

E P

T O

R

USIBWC HQ-ESD

A N

S I

F u l l

B l e e

I n c h e s

D W

G

T o

P

D F p c

191BWC21R0002

3 4 5

2 3 4

United States Section

SOLICITATION/RFP NUMBER

s

L M

S

T e c h

P l o t

S t y l e

T a b l e

N a m e

P a p e r

S i z e

C A

D

F i l e n a m e

1 2

D

C

B

A

International Boundary & Water Commission

D

C

B

A

IN

TE

RN

AT

IO

N

AL

B

O U

N

DA

RY

A

N D

W

AT

ER

C

O M

M

IS

SI

O

N U

N

IT

ED

S

TA

TE

S

AN

D M

EX

IC

O U

N

IT

ED

S

TA

TE

S

SE

CT

IO

N

R E

V

N

O D

E S

C R

I P

T I O

N

O

F

R

E V

I S

I O

N S

I G

N A

T U

D

E S

I G

N E

R

A

T

E

CONTRACT NUMBER

P l o t

S c a l e

P l o t

D e v i c e

A u t o C r s i o n

I N

T E

R

N

A

T

I

O

N

A

L

B

O

U

N

D

A R

Y A N

D

W

A

T

E

R

C

O

M

M

I S

S

I O

N

C

O

I

M

O

I

S

N

C

A

R

N

T

E

N

I

D

E

LA

N

O I

T

E

S

M

I

I

L

E

Y

A

U

S

A

G

D a t e a n d

T i m e

P l o t t e d

A

M

D a t e

L a s t

S a v e d

A

M

I O

I

M

H

R e p a i r d w g

IBWC Border V20170817

S h e e t S e t

N a m e

NOTES:

1. Contractor to choose how to repair slope, but shall submit a full work plan per Specification Section 31.25.00 to the COR for compliance confirmation. This drawing and USIBWC Drawing 26463 offer two options for slope repair.

2. The top and sides of the slope repair shall be placed to match existing contours.

3. Confirm with COR and Construction Inspector location of all construction prior to beginning actual sitework.

4. Remove all trash, debris, loose material, and small brush/vegetation prior to beginning work. Small trees may be removed to aid in construction.

5. Gabions shall be sized as 3 ft x 3 ft with the length determined by the Contractor. Gabions are usually available in lengths of

6, 9, and 12 ft.

6. The first and last gabion shall be embedded at least 5 ft into the slope to prevent water from eroding behind the gabions.

Confirm location with COR and Construction Inspector.

7. Nominal 12 inch riprap per Specification Section 31.37.00 shall be used to fill the slope.

8. Grout riprap with flowable fill meeting Specification Section 31.23.23.23. Alternately, the Contractor may use 1,500 to 2,000 psi concrete to grout riprap.

9. Place riprap partially above the expected finished slope grade. Place grout below top of riprap at the expected finished slope grade.

10. Wrap geotextile around exposed portion of MH 93 to prevent adhesion of grout.

11. Excavate below lip of existing CMP as noted in Detail 8 or install a flared end section which extends over grouted riprap.

ADMIN APPROVAL

DESIGNED

TECHNICAL APPROVAL

CHECKED

DRAWN

C. Cadillo

A. Glover

Andrea Glover, PE

OPTION 2 - PLAN VIEW OF MH 93 SLOPE WORK

OPTION 2 - TYPICAL SECTION MH 93 SLOPE WORK

Along approximate centerline of flow path

12" Riprap grouted with flowable fill

No vertical exaggeration

Along main flowline, create a constant slope between CMP and top of gabions.

Allow some of the riprap to extend above flowable fill.

0 102.5 5

Estimated location of stormwater CMP

0 205 10

Approximate extents of slope work

Approximate location of stormwater CMP

MH 93

Front face of gabion at +35 pr as agreed with

COR and Inspector

Creek

Creek

1'-6"

1'-6"

Excavate below

CMP lip and fill with riprap and flowable fill or see Note 11.

Bury gabion approx

2 ft into channel

Geotextile

Fill whole area with

12" riprap and grout in place

Create flow area from

CMP to gabions

Typical finished grading

See Note 6.

See Note 6.

File details come from the government source that posted it. Updated .