TINKER AFB MAC BOA-WWYK260007- Renovate Pratt & Whitney Area - B3001
Closed Solicitation Posted
- Solicitation number
- FA813726R0033
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Tinker AFB, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
About this opportunity
Tinker Air Force Base is seeking renovation of the Pratt & Whitney Area (Building B3001), a design-build interior renovation following flood damage, with proposals due September 16, 2026, at 1200 CST. This is a total small business set-aside restricted to current Tinker AFB MAC BOA holders only; participation requires attendance at the mandatory Initial Site Visit held May 28, 2026, and prime contractors must RSVP by May 21, 2026, COB CST (site visit has already occurred).
Place of performance is Tinker Air Force Base, Oklahoma City, Oklahoma. The estimated magnitude is between $500,000 and $1,000,000. The project involves 100% design development and full construction of the elevated platform office area on the second floor plus adjoining rooms and egress stairs, encompassing architectural demolition and new construction across all disciplines. The contractor must perform all hazardous materials surveys and abatement (asbestos, lead-based paint, mold), structural repairs including stairwell wall replacement, HVAC modifications using existing equipment (RTU-3001-P9A, 5,200 CFM capacity), electrical work, fire protection systems including FCI E3 fire alarm integration, and commissioning/TAB services. Design submittals are required at 35%, 65%, 95%, and 100% completion in AutoCAD (.dwg) format. The contractor must commence work within 10 calendar days of notice to proceed and complete all work within 329 calendar days. Liquidated damages are $227.15 per calendar day for both substantial and final completion. Bid bonds and performance and payment bonds at 100% of award are required. The LPTA source selection methodology applies. Key personnel must include a Project Manager with 10 years' experience and a Design Project Manager licensed as a Registered Architect or Professional Engineer with 10 years' management experience including 5 years on design-build projects. All personnel require AFMC Form 387 contractor badges prior to work initiation.
Contracting Officer Dorothy Inoa and Contracting Officer's Representative Peter Ho manage the procurement. All proposals must be emailed to Dorothy Inoa (dorothy.inoa@us.af.mil) and Sharla Flowers (sharla.flowers_brandon.1@us.af.mil). Amendments FA813726R00330002 and FA813726R00330003 (SF 30) have been issued; offerers must acknowledge all amendments prior to submission. Additional RFI responses dated August 28, 2026, and a corrected Environmental Report dated September 11, 2026, have been posted. NAICS code is 236220; PSC code is Z2AZ.
Notice text
10 versions
Update #10 · Latest ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 08- September 11, 2026
1.Correct Enviromental Report attached and labeled as: Enviromental Report 9-11
2. Amendment attached and labled as: Solicitation Amendment FA813726R00330003 SF 30
3. Due to CORRECT attachment the Proposal date will be extended to: September 16, 2026 at 1200 CST, email them to CS dorothy.inoa@us.af.mil AND sharla.flowers_brandon.1@us.af.mil.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 07- September 03, 2026
1. Additional RFIs are answered and labeled as: Pre-Bid_RFI_8-28 COR
2. Solicitation Amendment labeled as: Solicitation Amendment FA813726R00330003 SF 30.2
3. Additional information included and labeled as: PW ELMT North LAYOUT - 2.3.26
4. Email Proposals to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil by September 11, 2026, 2PM CST.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 06- August 21, 2026
1. Additional RFIs due Wednesday August 26, 2026 2PM CST. Email CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil .
2. RFPs due date September 11, 2026, 2PM CST.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 05- August 17, 2026
1. Environmental Report Attached as: Environmental Report.
2.Proposal Due Date: September 11, 2026, 2PM CST.
3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 04- August 11, 2026
1) Soliciation will be extended for 30 days.
2) New due date for proposals: September 11, 2026, 2PM CST.
3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30
4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil .
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
2) New due date for proposals will be provided when the new information is recieved and provided to all contractors.
3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #9 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 07- September 03, 2026
1. Additional RFIs are answered and labeled as: Pre-Bid_RFI_8-28 COR
2. Solicitation Amendment labeled as: Solicitation Amendment FA813726R00330003 SF 30.2
3. Additional information included and labeled as: PW ELMT North LAYOUT - 2.3.26
4. Email Proposals to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil by September 11, 2026, 2PM CST.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 06- August 21, 2026
1. Additional RFIs due Wednesday August 26, 2026 2PM CST. Email CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil .
2. RFPs due date September 11, 2026, 2PM CST.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 05- August 17, 2026
1. Environmental Report Attached as: Environmental Report.
2.Proposal Due Date: September 11, 2026, 2PM CST.
3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 04- August 11, 2026
1) Soliciation will be extended for 30 days.
2) New due date for proposals: September 11, 2026, 2PM CST.
3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30
4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil .
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
2) New due date for proposals will be provided when the new information is recieved and provided to all contractors.
3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #8 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 06- August 21, 2026
1. Additional RFIs due Wednesday August 26, 2026 2PM CST. Email CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil .
2. RFPs due date September 11, 2026, 2PM CST.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 05- August 17, 2026
1. Environmental Report Attached as: Environmental Report.
2.Proposal Due Date: September 11, 2026, 2PM CST.
3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 04- August 11, 2026
1) Soliciation will be extended for 30 days.
2) New due date for proposals: September 11, 2026, 2PM CST.
3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30
4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil .
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
2) New due date for proposals will be provided when the new information is recieved and provided to all contractors.
3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #7 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 05- August 17, 2026
1. Enviromental Report Attached as: Enviromental Report.
2.Proposal Due Date: September 11, 2026, 2PM CST.
3. Send all questions to CS Dorothy Inoa, dorothy.inoa@us.af.mil AND CO Sharla Flowers, sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 04- August 11, 2026
1) Soliciation will be extended for 30 days.
2) New due date for proposals: September 11, 2026, 2PM CST.
3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30
4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil .
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
2) New due date for proposals will be provided when the new information is recieved and provided to all contractors.
3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #6 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 04- August 11, 2026
1) Soliciation will be extended for 30 days.
2) New due date for proposals: September 11, 2026, 2PM CST.
3) Soliciation amendment attached as: Solicitation Amendment FA813726R00330002 SF 30
4) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil .
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
2) New due date for proposals will be provided when the new information is recieved and provided to all contractors.
3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #5 ·
UPDATE 04- August 10, 2026
1) Soliciation will be extended for 30 days until August 12, 2026 2PM CST.
2)
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
2) New due date for proposals will be provided when the new information is recieved and provided to all contractors.
3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #4 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
1) Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
2) New due date for proposals will be provided when the new information is recieved and provided to all contractors.
3) Reach out to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #3 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
1) RFI's and their responses have been posted in the attached document labeled: RFI Questions 6-24-2026
2) Proposal Response Date: 08 July 2026 at 2PM CST.
3) Send proposals to SrA Dorothy Inoa: dorothy.inoa@us.af.mil and CC Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #2 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
1) Site Visit was held and concluded on May 28, 2026.
2) RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
3) Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Update #1 ·
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Files
Show all 16
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business | |
| 2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 | Air Force Sustainment Center | Total Small Business | |
| WWYK240015 - Rehab Tanks 62501E & 62501W | Air Force Sustainment Center | No set-aside | |
| WWYK250063 - install react VII facility, B9001, post V19 | Air Force Sustainment Center | Woman-Owned Small Business | |
| Nitrogen piping replacement for plasma spray booth | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity