PW ELMT North LAYOUT - 2.3.26.pdf

PDF 2 MB Posted

Attached to
TINKER AFB MAC BOA-WWYK260007- Renovate Pratt & Whitney Area - B3001
Solicitation number
FA813726R0033
Issued by

About this file

This document is a set of architectural floor plans and facility layout drawings for a renovation project at Pratt & Whitney's ELMT North facility in Oklahoma City, Oklahoma.

The plans depict a comprehensive office/laboratory space redesign spanning approximately 48 inches in width and totaling 453 inches in length. Key renovation elements include: removal of an existing cabinet by Pratt & Whitney during the renovation phase; demolition of communications equipment and wall components by ALC (Copelin Contract); relocation of a heater northward to accommodate door access; installation of a tankless electric water heater to be mounted on a wall above a sink; and designation of an ALC demonstration storage room. The facility layout shows multiple workstations arranged around a central conference table (tan colored centerpiece), with individual meeting/office spaces positioned along the perimeter and an extended row of modular workstations along the upper section. Three-view technical drawings with overhead layouts and detail views are provided with precise dimensional annotations (117", 210", 193", and 453"). The project manager is Bryce Legg, dated February 3, 2026, with contact information (405) 600-4201 and bryce@copelincontract.com. The document is prepared by Copelin Contract.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EB

EC

EL

EF

EB

EB

EB

EB

EB

EF

EF

EF

EB EB

EF

EBEB

EB

EB

EB

EB

EF

EF EF

EU

EC

EB

EB

EU

EB

EB

EB

EF EF

EK

EL

EB

EB

EB

EB

EF

EB

EB

EC

EF

EB

EC

EL

EF

EB

EH

EB

EB

EF

EC

EB

EB

EB

EB

EC

EC

EB

EBEB

EC

EL

EK

EB

EB

EK

EB

EF

EB

EB

EBEB

EB

EB

EF

EB

EB

EB

EB

EB

EFEF

EB

EB

EB

EB

EB

EC

EF

EF

EF

EB

EC

EC

EB

EB

EB

EB

EB

EB

EB

EF

EB

EB

EB

EF

EH

EC

EB

EL

EB

EB

EB

EB

EB

EB

EF

EF

EB

EL

EB

EB

EB

EF

EB

EB

EBEB

EB

(405) 600-4201

Project Manager:

Bryce Legg 1/3

2/3/26ELMT North

Page #:Date:

bryce@copelincontract.com

Pratt & Whitney

Oklahoma City, OK

2/3ELMT North bryce@copelincontract.com

2/3/26

Date:

Bryce Legg

Page #:Project Manager:

(405) 600-4201

Pratt & Whitney

Oklahoma City, OK

EH

EB

EB

EB

EB

EF

EF

EBEB

EF

EB

EL

EB

EK

EB

EF

EF

EU

EC

EB

EBEB

EC

EF

EC

EK

EF

ELEB

EB

EB

EB

EF

EF

EB

EF

ELEB

EB

EF

EB

EF

EB

EB

EB

EB

EB

EB

EC

EB

EB

EB

EF

EB

EB

EB

EB

EB

ECEB

EB

EF

EB

EB

EB

EF

EF

EB

EB

EF

EC

EB EBEB

EB

EB

EB

EF

EB

EF

EB

EB

EC

EB

EB

EBEB

EB

EK

EL EL

EBEB

EU

EF

EB

EB

EB

EF

EB

EF

EB

EB

EF

EC

EB

EB

EB

EF

EBEC

EB

EF

EB

EB

EB

EB

EC

EC

EB

EB

EB

EB

EL

EB

EF

EC

EB

EH

EB

EB

EB

EB

117"

210"453"

193"

Date:

ELMT North

Page #:Pratt & Whitney 2/3/26

Project Manager:

bryce@copelincontract.com

Bryce Legg

(405) 600-4201 3/3Oklahoma City, OK

CClack Rectangle

CClack Line

CClack Cloud+

CClack Cloud+ ALC to demo comms

CClack Cloud+

CClack Cloud+ Pratt to Remove Cabinet During Renovation

CClack Cloud+

CClack Cloud+ ALC to Demo Storage Room

CClack Cloud+

CClack Cloud+ Tankless Electric Water heater to be mounted on wall above sink

CClack Arrow

CClack Cloud+

CClack Cloud+ Heater to be moved north to accommodate door use.

CClack Arrow

CClack Text Box ALC to demo wall

File details come from the government source that posted it. Updated .