Steam Plant Upgrades - Projects B260 at Hill AFB

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9123822R0007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Hill AFB, Utah 84056, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This two-phase Design-Build solicitation issued by the Department of the Army Corps of Engineers Engineering District Sacramento seeks to award a firm-fixed price construction contract to replace eight existing boilers and upgrade supporting equipment at Building 260 Steam Plant at Hill Air Force Base in Utah. The selected contractor will replace the boilers with five new dual-fuel boilers rated at 50 MMBtu/hr each achieving ultra-low NOx emissions of 9 ppm, remove underground fuel oil storage tanks and replace with aboveground tanks sized for seven days of peak storage, conduct seismic retrofitting of existing buildings, and upgrade deaerators, pumps and other supporting equipment. Proposals are due by July 11, 2022 with evaluation based on design approach, past performance, and price.

This is a 100% small business set-aside with a NAICS code of 238990 and size standard of $16.5 million. The estimated value of construction is between $25-100 million to be completed within 730 calendar days at Hill Air Force Base in Utah. Potential contractors include six companies listed on the interested vendor list. The main PSC code is Z2NB.

Notice text

3 versions

Update #3 · Latest ·

Building 260 Steam Plant Upgrades at Hill AFB Solicitation # W9123822R0007

This requirement is a two-phase Design-Build Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for Building 260 Steam Plant Upgrades at Hill AFB.   

Competition in this procurement is only for the selected Offerors, that were invited to participate in Phase Two.   

Project Description:

The Contractor shall perform improvements and repair of boilers in Building 260 (B260) Hill AFB project.  This project will include the replacement of eight existing boilers in B260 with new dual-fuel (natural gas/fuel oil) boilers that meet BACT. This option will require phasing the boiler replacement in the existing plants to maintain steam production for the existing load. The existing buildings will require new wall openings and an emergency boiler to maintain “N+1” boiler redundancy in the plants.

The boilers in B260 will be replaced with five new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded. This will be a DB contract.

In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be Between $25,000,000.00 and $100,000,000.00.  The NAICS Code is 236220 - Commercial and Institutional Building Construction. The size standard is $39.5M. The Product Service Code is Z2NB – Repair or Alteration of Heating and Cooling Plants.  This solicitation will proceed as a 100% Small Business Set Aside.  

Update #2 ·

Building 260 Steam Plant Upgrades at Hill AFB Solicitation # W9123822R0007

This requirement is a two-phase Design-Build Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for Building 260 Steam Plant Upgrades at Hill AFB.

Project Description:

The Contractor shall perform improvements and repair of boilers in Building 260 (B260) Hill AFB project.  This project will include the replacement of eight existing boilers in B260 with new dual-fuel (natural gas/fuel oil) boilers that meet BACT. This option will require phasing the boiler replacement in the existing plants to maintain steam production for the existing load. The existing buildings will require new wall openings and an emergency boiler to maintain “N+1” boiler redundancy in the plants.

The boilers in B260 will be replaced with five new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded. This will be a DB contract.

In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be Between $25,000,000.00 and $100,000,000.00.  The NAICS Code is 236220 - Commercial and Institutional Building Construction. The size standard is $39.5M. The Product Service Code is Z2NB – Repair or Alteration of Heating and Cooling Plants.  This solicitation will proceed as a 100% Small Business Set Aside.  

Update #1 ·

Building 260 Steam Plant Upgrades at Hill AFB Solicitation # W9123822R0007

This requirement is a two-phase Design-Build Request for Proposal (RFP) with the intent of awarding a Firm-Fixed Price construction contract for Building 260 Steam Plant Upgrades at Hill AFB.

Project Description:

The Contractor shall perform improvements and repair of boilers in Building 260 (B260) Hill AFB project.  This project will include the replacement of eight existing boilers in B260 with new dual-fuel (natural gas/fuel oil) boilers that meet BACT. This option will require phasing the boiler replacement in the existing plants to maintain steam production for the existing load. The existing buildings will require new wall openings and an emergency boiler to maintain “N+1” boiler redundancy in the plants.

The boilers in B260 will be replaced with five new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded. This will be a DB contract.

In accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be Between $25,000,000.00 and $100,000,000.00.  The NAICS Code is 238990 - All Other specialty Trade Contractor. The size standard is $16.5M. The Product Service Code is Z2NB – Repair or Alteration of Heating and Cooling Plants.  This solicitation will proceed as a 100% Small Business Set Aside.  

Files

File Type Posted
Attachment 1 B260 KRSM Specifications Part 1_070122.pdf PDF
W9123822R0007-0008 - 20220701.pdf PDF
W9123822R0007-0007.pdf PDF
Attachment 12 Price Schedule - 20220601.pdf PDF
Attachment 6 Site Visit Map.pdf PDF
Attachment 5 Pre-Award Survey .pdf PDF
Attachment 4 DoL WD UT20220083 - 20220401.pdf PDF
W9123822R0007-0006 - 20220601.pdf PDF
Attachment 1 B260 KRSM Specifications Part 1.pdf.pdf PDF
Site Visit Sign in Sheet - 2022 05 05.pdf PDF
W9123822R0007 AMENDMENT 0005.pdf PDF
W9123822R0007 AMENDMENT 0004.pdf PDF
Attachment 1 Specifications Part 1 KRSM_BLDG260_HILL STEAMPLANT UPGRADE.pdf PDF
Attachment 2 Specifications Part 2 KRSM_BLDG260_HILL STEAMPLANT UPGRADE.pdf PDF
Attachment 4 CWRR.pdf PDF
Attachment 9 As-builts B260 Fuel Oil - Existing Drawings.pdf PDF
Attachment 11 As-builts BLDG 260 001-218 COMBINED.pdf PDF
Attachment 5 Site Visit Map.pdf PDF
Attachment 6 Pre-Award Survey .pdf PDF
Attachment 3 KRSM_BLDG260_HILL STEAMPLANT UPGRADE_Drawings.pdf PDF
W9123822R0007 A0003.pdf PDF
28 December 2021 Interested Vendor List.docx DOCX document
W9123822R0007 A0002.pdf PDF
W9123822R0007 A0001.pdf PDF
Attachment 2 B Specifications.pdf PDF
Attachment 3 Supplemental Contract Requirements.pdf PDF
Attachment 5 - Project Information Form.pdf PDF
1442 W9123822R0007.pdf PDF
Attachment 2 A Drawings.pdf PDF
Attachment 4 Davis-Bacon Act WD.pdf PDF
Attachment 1 Summary of Work.pdf PDF
Show all 31

Notice history

Notice Type Posted
Steam Plant Upgrades - Projects B260 at Hill AFB Award Award Notice
This notice Latest solicitation Solicitation
Steam Plant Upgrades - Projects B260 at Hill AFB Pre-Solicitation
Steam Plant Upgrades - Projects B260 at Hill AFB Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
16292 Steam Boiler Replacement Hill AFB, Utah 84056, United States · NAICS 238220 Air Force Sustainment Center Total Small Business
Z1DA--FY27 NRM - Replace B98 and B88 Boiler and Sump Pumps Department of Veterans Affairs Va Northern California Health Care System McClellan Park CA 95652, United States · NAICS 236220 Veterans Integrated Service Network 21 No set-aside
HAFB Multiple Award Construction Contract V (MACC V) Hill AFB, UT (Davis County) Utah Test and Training Range (Uttr) Little Mountain Test Facility (Lmtf) Utah Air National Guard (Utang) Base Boulder Seismic Site, WY Other: Geographically separated units (GSU) under the responsibility of 75 ABW/CC · NAICS 236220 Air Force Sustainment Center Total Small Business
F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah Hill Air Force Base, Utah, United States · NAICS 236210 ENDIST Sacramento No set-aside
SABER V Hill AFB NAICS 236220 Air Force Sustainment Center Competitive 8(a)

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors