Attachment 2 Specifications Part 2 KRSM_BLDG260_HILL STEAMPLANT UPGRADE.pdf
PDF 45 MB Posted
- Attached to
- Steam Plant Upgrades - Projects B260 at Hill AFB
- Solicitation number
- W9123822R0007
About this file
This document provides details for a two-phase Design-Build Request for Proposal for Building 260 Steam Plant Upgrades at Hill Air Force Base. The contractor shall replace eight existing boilers with five new dual-fuel boilers rated at 50 million Btu/hour each achieving ultra-low NOx emissions of 9 parts per million. The project will also remove existing fuel oil underground storage tanks and replace with aboveground storage tanks sized for seven days of peak storage, upgrade supporting equipment, and perform seismic retrofitting of the existing buildings. The estimated value of construction is between $25 million and $100 million. The NAICS code is 238990 and size standard is $16.5 million. This is a 100% small business set-aside with the Department of the Army Corps of Engineers Engineering District Sacramento as the issuing agency. The solicitation number is W9123822R0007.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers Huntsville District
CONSTRUCTION SPECIFICATIONS AND DESIGN CRITERIA
VOLUME 2 OF 2
BLDG 260 – STEAM PLANT UPGRADE
HILL AFB, UTAH
SOLICITATION NO. W9123822R0007
CONTRACT NO. W912DY18D0016
DATE: 18 MARCH 2022 - CORRECTED FINAL DB RFP
Steam Plant Upgrade – Hill AFB, Utah Bldg. 260
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
VOLUME 1 OF 2
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 11/20 GENERAL REQUIREMENTS
01 10 10 07/21 DESIGN CRITERIA
01 11 00 08/15 SUMMARY OF WORK
01 14 00 11/11, CHG 11:11/20 WORK RESTRICTIONS
01 30 00 11/20 ADMINISTRATIVE REQUIREMENTS
01 32 01 02/15 PROJECT SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 33 16 05/16 DESIGN DATA (DESIGN AFTER AWARD)
01 35 26 11/19 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 11/16, CHG 1: 02/20 QUALITY CONTROL
11/16, CHG
11/20
2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
SPECIAL INSPECTIONS
01 50 00 11/20 TEMPORARY CONSTRUCTION FACILITIES
AND CONTROLS
01 57 19 08/16 ENVIRONMENTAL PROTECTION
02/19, CHG
05/19
1: 08/20 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 1: 11/20 OPERATION AND MAINTENANCE DATA
01 91 00 05/19, CHG 2: 08/20 TOTAL BUILDING COMMISSIONING
VOLUME 2 OF 2
APPENDIX A – 35% RFP DRAWINGS
APPENDIX B – BASE FACILITY DESIGN STANDARDS
APPENDIX C – INDUSTRIAL SAFETY REQUIREMENTS
APPENDIX D – HAFB ARC STANDARDS
APPENDIX E - EXISTING FACILITY PHOTOGRAPHS
APPENDIX F – LIMITED ASBESTOS INSPECTION REPORT – BLDG 260 (2019)
APPENDIX G – UNDERGROUND STORAGE TANKS(USTs)SUBSURFACE REPORT-BLDG 260
APPENDIX H – HISTORICAL GEOTECHNICAL INFORMATION
APPENDIX I – ASCE 41 TIER 1 CHECK LISTS
APPENDIX J – PROPOSED BOILER CUTSHEETS
APPENDIX K - HILL AFB-REPAIR BOILERS-FINAL FEASIBILITY REPORT 09-16-19
(TO BE PROVIDED ELECTRONICALLY BY USACE)
APPENDIX L – AS-BUILTS (TO BE PROVIDED ELECTRONICALLY BY USACE)
APPENDIX M – BASE STANDARD DETAILS (TO BE PROVIDED ELECTRONICALLY BY USACE)
-- End of Project Table of Contents --
Steam Plant Upgrade - Hill AFB, Utah Bldg. 260
THIS PAGE LEFT INTENTIONALLY BLANK.
APPENDIX A
35% RFP DRAWINGS -BLDG 260
PROJECT LOCATION
S. Weber
Uintah
E.
N.
E. Layton
C h u rc h
S t.
E. Ge ntile
St.
Arsenal
Antelope Dr.
Clearfield
Clinton Sunset
23215
HILL AFB
Roy
Washington Terrace
Riverdale 28 89
SOUTH GATE
WEST GATE
CONTRACTING
6038 ASPEN AVE
BLDG. 1289
NE
ROY
GATE
CIVIL ENGR
5713 LAHM LANE
BLDG 593 N
FIRE
DEPARTMENT
BLDG.23
5 4
2 1
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
VICINITY MAP
LOCATION MAP
/7
/2
:0
:4
A
M
G-001
C O
V E
R S
H E
E T
A N
D S
H E
E T
I N
D E
X
B L D
G
S T
E A
M P
L A
N T
U P
G R
A D
E
S A
C R
A M
E N
T O
D
IS
T R
IC
T
A E
C O
M W
IL
S
O N
B L V
D
A R
L
IN
G T
O N
V
A
L
R H
Z W
M E
C h e c k e r
F E
B R
U A
R Y
W D
Y F
W D
Y D
F
IN
A L
R F
P
N O
T F
O R
C O
N S
T R
U C
T
IO
N
H
IL
L A
F B
U
T
SACRAMENTO DISTRICT
W912DY21F0241
W912DY18D0016
FEBRUARY 16, 2022
BLDG 260 - STEAM PLANT UPGRADE
HILL AFB, UT
FINAL RFP - NOT FOR CONSTRUCTION
BLDG 260
TN
TN
SHEET INDEX
SHEET NO. SHEET NAME
GENERAL
G-001 COVER SHEET AND SHEET INDEX
G-002 GENERAL NOTES, ABBREVIATIONS
GI001 LIFE SAFETY LEGEND AND GENERAL NOTES
GI101 FIRST LEVEL LIFE SAFETY PLAN
GI102 SECOND LEVEL LIFE SAFETY PLAN
CIVIL
C-001 LEGEND, ABBREVIATION AND NOTES
C-100 EXISTING CONDITION AND DEMOLITION PLAN
CS100 SITE PLAN
CU100 UTILITY PLAN
C-500 SITE DETAILS
ARCHITECTURAL
AD101 FIRST FLOOR DEMOLITION PLAN
AD102 ROOF DEMOLITION PLAN
A-101 FIRST FLOOR PLAN
A-102 ROOF PLAN
A-201 NORTH AND SOUTH ELEVATIONS
A-202 EAST AND WEST ELEVATIONS
FIRE PROTECTION
FA001 FIRE ALARM LEGEND
FA100 FIRE ALARM DEMOLITION PLAN
FA101 FIRST LEVEL FIRE ALARM PLAN
FA102 SECOND LEVEL FIRE ALARM PLAN
PLUMBING
PD101 PLUMBING DEMOLITION PLAN
P-101 PLUMBING PLAN
MECHANICAL
MD100 MECHANICAL DEMOLITION PLAN
M-100 MECHANICAL NEW WORK PLAN
ELECTRICAL
E-001 ELECTRICAL LEGEND NOTES AND ABBREVIATIONS
ED101 POWER DEMOLITION PLAN
E-101 POWER PLAN
E-401 ENLARGED ELECTRICAL AREA
E-601 ONE-LINE DIAGRAMS - EXISTING
E-602 ONE-LINE DIAGRAMS - DEMOLITION
E-603 ONE-LINE DIAGRAMS - NEW WORK
SHEET COUNT: 31
W9123822R0007
W
R
DRAWING ABBREVIATIONS
SHEET NUMBERING
NUMBERING SYSTEM:
XX100
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
DISCIPLINE MODIFIER
GENERAL NOTES
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR
INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HTCEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORDCOORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GREXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRKFACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLRFINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED CONTRACTOR
INSTALLED
GFGI GOVERNMENT INSTALLED GOVERNMENT
INSTALLED
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTION COEFFICIENT
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERINGSTANDARDS
REVISION
TAG
NORTH ARROW w/
TRUE NORTH
INDICATION
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
SHEET NUMBER WITHIN SERIES
A201
A204
A301
A401
ROOM
100'
LEVEL 01
100'
A
PLAN NORTH
1. REFER TO CIVIL DRAWINGS FOR ALL CIVIL/SITE WORK ASSOCIATED WITH THIS TASK.
2. REFER TO MECHANICAL DRAWINGS FOR ALL MECHANICAL WORK ASSOCIATED WITH THIS TASK.
3. REFER TO PLUMBING DRAWINGS FOR ALL PLUMBING WORK ASSOCIATED WITH THIS TASK.
4. REFER TO ELECTRICAL DRAWINGS FOR ALL ELECTRICAL WORK ASSOCIATED WITH THIS TASK.
5. REFER TO FIRE PROTECTION DRAWINGS FOR ALL FIRE ALARM WORK ASSOCIATED WITH THIS TASK.
6. ALL EXISTING TO REMAIN SURFACES DAMAGED DURING EXECUTION OF THE WORK SHALL BE
REPAIRED TO MATCH PRE-EXISTING CONDITIONS.
7. ALL PREVIOUSLY PAINTED SURFACES THAT BECOME DAMAGED DURING EXECUTION OF THE WORK
SHALL BE REPAINTED AND REPAIRED TO THE FULL EXTENT OF DAMAGED COMPONENTS TO MATCH
EXISTING ADJACENT SURFACES.
8. A BID OPTION IS INCLUDED IN THIS RFP FOR BUILDING 260, IT INCLUDES A TOTAL NEW BUILT UP
ROOF REPLACEMENT THAT MEETS BASE FACILITY DESIGN STANDARDS, UFC 3-110-03 AND UFC
3-330-02A. THIS ROOF REPLACEMENT INCLUDES BUT NOT LIMITED TO REMOVING THE EXISTING BUILT UP ROOF SYSTEM INCLUDING, INSULATION, SUBSTRATE, PARAPET FLASHING, EQUIPMENT
CURBS AND FLASHING DOWN TO THE EXPOSED CONCRETE / ROOF DECK AND PREPARE FOR NEW
BUILT UP INSULATED ROOFING SYSTEM INCLUDING ALL ROOFING ACCESSORIES, PARAPET
FLASHING AND COPING, NEW EQUIPMENT CURBS AND FLASHING, NEW PREMANUFACTURED
MEMBRANE BOOTS FOR PIPING, NEW DRAIN BODIES AND INCORPORATE ROOF ANCHOR POINTS
FOR HORIZONTAL LIFELINE FOR ENTIRE ROOF COVERAGE. FALL PROTECTION SYSTEMS SHALL
COMPLY WITH APPLICABLE AFI, OSHA, AND ANSI RULES AND REGULATIONS. APPLICABLE
STANDARDS INCLUDE, BUT ARE NOT LIMITED TO; AFI 91-203, OSHA 29 CFR 1910, ANSI Z359.1-2007
AND ANSI Z359.2-2007.
B1 EQUIPMENT TAG
SYMBOLOGY
PLAN LEGEND
NEW DOOR AND PARTITION
NEW PARTITION
SEE PLAN FOR TYPE
EXISTING DOOR AND
PARTITION TO REMAIN
A C
T
IV
E
L
A F
INACTIVE
LEAF
NEW DOUBLE DOORS
EXISTING WALL
CONSTRUCTION TO REMAIN
EXISTING WALL TO BE
DEMOLISHED
EXISTING DOOR AND FRAME
TO BE DEMOLISHED
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
/1
/2
:3
:3
P
M
G-002
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
B L D
G
S T
E A
M P
L A
N T
U P
G R
A D
E
S A
C R
A M
E N
T O
D
IS
T R
IC
T
A E
C O
M W
IL
S
O N
B L V
D
A R
L
IN
G T
O N
V
A
L
R H
Z W
M E
C h e c k e r
F E
B R
U A
R Y
W D
Y F
W D
Y D
F
IN
A L
R F
P
N O
T F
O R
C O
N S
T R
U C
T
IO
N
H
IL
L A
F B
U
T
W
R
TRAVEL DISTANCE
COMMON PATH OF TRAVEL
OCCUPANT LOAD
ROOM NAME USE SQ. FT PER PERSON AREA (SQ. FT) OCCUPANT LOAD
GENERATOR AND
ELECTRICAL ROOM
BOILER ROOM
BUSINESS AREAS
INDUSTRIAL
INDUSTRIAL
BUSINESS
TOTAL OCCUPANTS: 112 OCCUPANTS
PUMP ROOM INDUSTRIAL 100 608 7
EGRESS CAPACITY
EXIT WIDTH
(INCHES)
CAPACITY FACTOR
(WIDTH/PERSON)
EGRESS CAPACITY
(PERSONS)
DOOR 1
DOOR 2
0.2
0.2
EGRESS CAPACITY: 1470 PERSONS
DOOR 8 72 0.2 360
DOOR 14
DOOR 15
0.2
0.2
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
A C
T N
O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
2/ 8/
2:
:1
PM
GI001
LI
FE
S
AF
ET
Y
LE
G
EN
D
A N
D G
EN
ER
AL
N
O
TE
S
BL
D
G
ST
E
AM
P
LA
N
T U
PG
R
AD
E
SA
C
R A
M
EN
TO
D
IS
TR
IC
T
AE
C
O M
W
IL
SO
N
B
LV
D
AR
LI
N G
TO
N
, V A
4L
A.
K
U
SH
N
ER
A.
K
U
SH
N
ER
M . L
AN
E
FE
BR
U
AR
Y
, 2
W
2D Y2
1F
W
2D Y1
8D
FI
N
AL
R
FP
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
H
IL
L
AF
B, U
T
APPLICABLE CODES
1. 2021 EDITION OF THE INTERNATIONAL BUILDING CODE
2. NFPA 1, UNIFORM FIRE CODE - 2021 EDITION
3. NFPA 70, NATIONAL ELECTRIC CODE - 2020 EDITION
4. NFPA 72, NATIONAL FIRE ALARM CODE - 2019 EDITION
5. NFPA 101, LIFE SAFETY CODE - 2021 EDITION
6. UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES, WITH CHANGE 6 - 05-06-2021
7. UFC 04-021-01, MASS NOTIFICATION SYSTEMS, WITH CHANGE 1 - 01-01-20
OCCUPANCY CLASSIFICATION (NFPA 101)
1. INDUSTRIAL OCCUPANCY
MEANS OF EGRESS (NFPA 101)
1. EGRESS COMPONENTS
1.1 DOORS
1.1.1. DOORS ARE TO BE ARRANGED TO BE OPENED READILY FROM THE EGRESS SIDE WHENEVER THE BUILDING IS OCCUPIED. LOCKS, IF PROVIDED, ARE NOT TO REQUIRE THE USE OF A KEY, A TOOL, SPECIAL KNOWLEDGE OR EFFORT FOR OPERATION FROM THE EGRESS SIDE
(SECTION 7.2.1.5.1/7.2.1.5.3)
1.1.2. THE PANIC HARDWARE OR FIRE EXIT HARDWARE IS TO CONSIST OF CROSS BARS OR PUSH PADS LOCATED NOT LESS THAN 34 INCHES OR MORE THAN 48 INCHES ABOVE THE FLOOR. THE ACTUATING PORTION OF THE CROSS BAR OR PUSH PADS IS NOT TO EXTEND
ACROSS LESS THAN ONE-HALF THE WIDTH OF THE DOOR LEAF (SECTION 7.2.1.7.1)
2. MARKING OF MEANS OF EGRESS
2.1. SIGNAGE
2.1.1. EXITS SHALL BE MARKED BY AN APPROVED SIGN READILY VISIBLE FROM ANY DIRECTION OF EXIT ACCESS (SECTION 7.10.1.2)
2.1.2. A DIRECTIONAL SIGN READING "EXIT" WITH A DIRECTIONAL INDICATOR SHOWING THE DIRECTION OF TRAVEL SHALL BE PLACED IN EVERY LOCATION WHERE THE DIRECTION OF TRAVEL TO REACH THE NEAREST EXIT IS NOT APPARENT (SECTION 7.10.2/SECTION 7.10.3.1)
2.2. ILLUMINATION
2.2.1. EVERY EXIT SIGN SHALL BE ILLUMINATED AT ALL TIMES. THE ILLUMINATION SHALL BE FOR 90 MINUTES IN THE CASE OF PRIMARY
POWER LOSS (SECTION 7.8.1.2/SECTION 7.9.2.1)
2.2.2. EXIT SIGNS THAT ARE EXTERNALLY ILLUMINATED SHALL HAVE AN INTENSITY NOT LESS THAN 54 LUX (SECTION 7.10.6.3)
3. EMERGENCY POWER AND LIGHTING
3.1. EMERGENCY LIGHTING
3.1.1. EMERGENCY LIGHTING REQUIRED FOR EXIT ACCESS, EXITS AND EXIT DISCHARGE AT ALL TIMES THAT THE BUILDING IS OCCUPIED
(SECTION 7.8.1.2)
3.1.2. EMERGENCY ILLUMINATION IS REQUIRED TO BE AS FOLLOWS:
3.1.2.1 REQUIRED ILLUMINATION SHALL BE ARRANGED SO THAT INITIAL ILLUMINATION IS AT LEAST AN AVERAGE OF 1 FTCANDLE AND A
MINIMUM AT ANY POINT OF 0.1 FT-CANDLE (SECTION 7.9.2.1)
3.1.2.2. A DECLINE TO 0.6 FT-CANDLE AVERAGE ILLUMINATION AT THE FLOOR WITH A MINIMUM 0.06 FT-CANDLE AT ANY POINT IS
PERMITTED AT THE END OF THE EMERGENCY LIGHTING TIME DURATION (SECTION 7.9.2.1)
3.1.2.3. A MAXIMUM TO MINIMUM ILLUMINATION UNIFORMITY RATIO OF 40:1 SHALL NOT BE EXCEEDED (SECTION 7.9.2.1)
4. OCCUPANT LOAD
4.1. INDUSTRIAL:
100 SQ. FT PER OCCUPANT (TABLE 7.3.1.2)
TOTAL: 119 OCCUPANTS
5. CAPACITY OF MEANS OF EGRESS
5.1. EGRESS WIDTH REQUIRED PER PERSON
5.1.1. LEVEL EGRESS TRAVEL: 0.2 INCHES/PERSON
5.1.2. PROVIDED WIDTH: 0.2 INCHES/PERSON
LIFE SAFETY GENERAL NOTES
LIFE SAFETY LEGEND
6. TRAVEL DISTANCE
6.1. MAXIMUM TRAVEL DISTANCE
6.1.1. INDUSTRIAL OCCUPANCY: 200 FT (TABLE 40.2.6.1)
ACTUAL: 173 FT 2 IN
6.2. MAXIMUM COMMON PATH OF TRAVEL
6.2.1. INDUSTRIAL OCCUPANCY: 50 FEET (TABLE 40.2.5.1)
ACTUAL: 36 FT 9 IN
6.3. MAXIMUM DEAD END CORRIDOR
6.2.1. INDUSTRIAL OCCUPANCY: 50 FEET (TABLE 40.2.5.1)
7. NUMBER AND ARRANGEMENT OF MEANS OF EGRESS, INCLUDING EXIT DISCHARGE
7.1. NUMBER OF EXITS REQUIRED
7.1.1. SINGLE EXIT FROM ROOMS AND AREAS WITH LIMITED OCCUPANT LOAD AND HAVING COMMON PATH OF TRAVEL WITHIN THE
ALLOWABLE LIMITS (SECTION 7.4.1.1)
7.1.2. SEE LIFE SAFETY FLOOR PLANS FOR SPECIFIC LOCATIONS OF EXITS.
7.2. EXIT DISCHARGE
7.2.2. THE EXIT DISCHARGE SHALL PROVIDE DIRECT AND UNOBSTRUCTED ACCESS TO A PUBLIC WAY (SECTION 7.7.3).
ACTUAL HEIGHT AND AREA VS. ALLOWABLE HEIGHT AND AREA (EXISTING TYPE IIB CONSTRUCTION)
1. BUILDING HEIGHT
1.1. ALLOWABLE HEIGHT: 55 FEET (IBC TABLE 504.3)
1.2. ACTUAL HEIGHT: 24 FEET
1.3. ALLOWABLE NUMBER OF STORIES: 4 STORIES (IBC TABLE 504.3)
1.4. ACTUAL NUMBER OF STORIES: 1 STORY
2. BUILDING AREA
2.1 ALLOWABLE BUILDING AREA: TYPE IIB: 23,000 SQUARE FEET (IBC 506.2)
2.2 ACTUAL BUILDING AREA - 11,860 SQUARE FEET
FIRE SUPPRESSION REQUIREMENTS
FIRE SUPPRESSION IS NOT REQUIRED PER UFC 3-600-01 9-7.2.1 AND IBC 903.2.4.
FIRE ALARM REQUIREMENTS
FIRE ALARM SYSTEM NOT REQUIRED PER UFC 3-600-01 AND IBC.
COMBINED FIRE ALARM MASS NOTIFICATION SYSTEM PROVIDED PER UFC 3-600-01 9-18.1.2.1.
CARBON MONOXIDE DETECTION REQUIRED PER UFC 3-600-01 9-19.1.1.
W
R
1 2 3 4 5 6 7 8 10 11
I
H
G
FG
F
D
C
B
A
GENERATOR AND
ELECTRICAL
ROOM
101A
INSTRUMENT
REPAIR ROOM
BOILER ROOM
OFFICE/
CONTROL ROOM
PUMP ROOM
101B
JANITORS
MEN'S
RESTROOM
WOMEN'S
RESTROOM
ACTUAL TD: 59 FT 6 IN
ALLOWABLE TD: 200 FT
ACTUAL CPT: 36 FT 9 IN
ALLOWABLE CPT: 50 FT
ACTUAL TD: 173 FT 2 IN
ALLOWABLE TD: 200 FT
ACTUAL TD: 117 FT 7 IN
ALLOWABLE TD: 200 FT
15 14
ACTUAL TD: 83 FT 3 IN
ALLOWABLE TD: 200 FT
OCCUPANT LOAD
ROOM NAME USE SQ. FT PER PERSON AREA (SQ. FT) OCCUPANT LOAD
GENERATOR AND
ELECTRICAL ROOM
BOILER ROOM
BUSINESS AREAS
INDUSTRIAL
INDUSTRIAL
BUSINESS
TOTAL OCCUPANTS: 112 OCCUPANTS
PUMP ROOM INDUSTRIAL 100 608 7
EGRESS CAPACITY
EXIT WIDTH
(INCHES)
CAPACITY FACTOR
(WIDTH/PERSON)
EGRESS CAPACITY
(PERSONS)
DOOR 1
DOOR 2
0.2
0.2
EGRESS CAPACITY: 1470 PERSONS
DOOR 8 72 0.2 360
DOOR 14
DOOR 15
0.2
0.2
0 8' 16'
1/8"=1'-0"SCALE:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
A C
T N
O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
PLAN NORTH
2/ 8/
2:
:2
PM
GI101
FI
R
ST
L
EV
EL
L
IF
E
SA
FE
TY
P
LA
N
BL
D
G
ST
E
AM
P
LA
N
T U
PG
R
AD
E
SA
C
R A
M
EN
TO
D
IS
TR
IC
T
AE
C
O M
W
IL
SO
N
B
LV
D
AR
LI
N G
TO
N
, V A
4L
A.
K
U
SH
N
ER
A.
K
U
SH
N
ER
M . L
AN
E
FE
BR
U
AR
Y
, 2
W
2D Y2
1F
W
2D Y1
8D
FI
N
AL
R
FP
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
H
IL
L
AF
B, U
T
1/8" = 1'-0"1 FIRST LEVEL LIFE SAFETY PLAN
TN
ENGINE LANE
S. GATE AVENUE
W
R
H
G
FG
F
D
C
B
A
ACTUAL TD: 83 FT 3 IN
ALLOWABLE TD: 200 FT
ACTUAL CPT: 50 FT
ALLOWABLE CPT: 50 FT
MEZZANINE
OPEN TO BELOW OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
0 8' 16'
1/8"=1'-0"SCALE:
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
E D
B Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
D
IS
SU
E D
AT
E:
C O
N
TR
A C
T N
O
SO
LI
C
IT
AT
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D
AT
E M
AR
K
D
ES
C R
IP
TI
O N
Pl ot
D at e:
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
PLAN NORTH
2/ 8/
2:
:2
PM
GI102
SE
C
O N
D L
EV
E
L
LI
FE
S
AF
ET
Y
PL
AN
BL
D
G
ST
E
AM
P
LA
N
T U
PG
R
AD
E
SA
C
R A
M
EN
TO
D
IS
TR
IC
T
AE
C
O M
W
IL
SO
N
B
LV
D
AR
LI
N G
TO
N
, V A
4L
A.
K
U
SH
N
ER
A.
K
U
SH
N
ER
M . L
AN
E
FE
BR
U
AR
Y
, 2
W
2D Y2
1F
W
2D Y1
8D
FI
N
AL
R
FP
N O
T
FO
R C
O N
ST
R
U C
TI
O
N
H
IL
L
AF
B, U
T
1/8" = 1'-0"1 SECOND LEVEL LIFE SAFETY PLAN TN
ENGINE LANE
S. GATE AVENUE
W
R
SHEET ID
U S
A
R M
Y
C
O R
P S
O
F
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
C T
N
S O
L I C
I T
A T
I O
N
N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
F i l e
P a t h
P l o t
D a t e
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
US Army Corps of Engineers n a a e c o m n e t c o m l f s A
M E
R A r l i n g t o n U
S A
R L
D
C S
P r o j e c t s B
D L
H i l l
A F
B
S t e a m
U p g r a d e
C
A D
G
I S
C
A D
S
H E
E T
S B
C
L E
G E
N D
A
B B
R E
V I A
T I O
N
A
D
T
E S d w g
A
M
H I L L
A
F B
U
T
S A
C R
A M
E N
S
T R
I C
T
A E
C O
M
W
I L S
B
V
D
A R
L I N
G T
O N
V
A
L
N K
N K
A J Z
F E
B R
U A
R Y
W D
Y F
W D
Y D
B L D
G
S
T E
A M
A
G
R A
D E
M E
F I N
N
S T
R U
C T
I O
N
ATFP ANTI -TERRORISM FORCE PROTECTION
CLF
CMP
CPP
DIP
DHCW
ENG.
EX.
FFE
FOS
HVAC
INV.
LBS
LOD
O-X
PIV
PVC
RCP
SPT
SSF
STL
STMH
TRAV
TYP.
BLDG.
BM
C
CB
CC
CONC.
CW
ELE.
FC
FF
FG
GP
GR
HERCP
HW
INV. EL
JB
LF
MH-XXX
N.P.T.
PROP.
REC. CTR.
SSMH
SB
SCADA
SF
TC
T-COMM
TYPICAL
TRAVERSE CONTROL POINT
TELECOMMUNICATIONS LINE
TERRA COTTA
STEAM MANHOLE
STEEL
SUPER SILT FENCE
STANDARD PENETRATION TEST
SILT FENCE
SOIL BORING
SANITARY MANHOLE
SLOPE
RECREATIONAL CENTER
REINFORCED CONCRETE PIPE
PROPOSED
PLASTIC PIPE
POST INDICATOR VALVE
OUTFALL
ELECTRIC MANHOLE
MANHOLE
LIMITS OF DISTURBANCE
LINEAR FEET
POUNDS
LENGTH
ELECTRICAL JUNCTION BOX
INVERT ELEVATION
INVERT
HEADWALL
HORIZONTAL ELLIPTICAL REINFORCED
GREEN ROOF
GUARD POST
FUEL OIL SUPPLY
FINISH GRADE
FINISHED FLOOR
FUEL CONNECTION
EXISTING
ENGINEERING
ELEVATION
DUCTILE IRON PIPE
COLD WATER
CORRUGATED PLASTIC PIPE
CONCRETE
CORRUGATED METAL PIPE
CHAIN LINK FENCE
CONCRETE BARRIER
STORM WATER CATCH BASIN
CONCRETE PIPE
BUILDING
W/ WITH
CI CAST IRON
CLEAN OUTC/O
CS FUEL CONTAINMENT SUMP
EX. CV EXISTING CULVERT
STA. STATION
ASTM
MONUMENT (BENCHMARK)
DOMESTIC HOT AND COLD WATER PIPE
SWGR
HGL HYDRAULIC GRADE LINE
HDPE
FPS
CASED WITHC/W
HIGH DENSITY POLYETHYLENE PIPE
FEET PER SECOND
SWITCHGEAR
DO OUTLET PIPE DIAMETER
W
SWM
BMP BEST MANAGEMENT PRACTICE
LEN
MH
FEMA
SUB CONTROL POINT
SPEC. X
SPECIMEN TREE
TG TOP OF GRADE
TW TOP OF WALL
BW BOTTOM OF WALL
MPH
MW
MILES PER HOUR
MONITORING WELL
PE POLYETHYLENE
ASTM INTERNATIONAL
CN CURVE NUMBER
STORM WATER MANAGEMENT
A.D.
PVI POINT OF VERTICAL INTERSECTION
VC VERTICAL CURVE
GV GAS VALVE
IDA IMPERVIOUS DRAINAGE AREA
FINISHED FLOOR ELEVATION
E.P. EDGE OF PAVEMENT
G.F.E. GROUND FLOOR ELEVATION
NATIONAL PIPE THREAD
REAL PROPERTY SERVICES FIELD OFFICER.S.F.O.
FTG FITTING
CC&G CONCRETE CURB & GUTTER
ELEC ELECTRICAL
SAN SANITARY SEWER PIPE
SD STORM DRAIN
SS# SUBSTATION
U.D. UNDERDRAIN
VCP VEHICLE CONTROL POINT
WATER
WV WATER VALVE
DIRECT BURY CONDUITDBC
UTIL UTILITY
GRND GROUND
ABND
ABANDONED
ABBREVIATIONS
A
B
C
D
E
F
G
H
J
L
M
N
O
P
R
S
T
U
V
W
TD TRENCH DRAIN
BC
BOTTOM OF THE CURB
T TRANSFORMER
CFS CUBIC FEET PER SECOND
MHFD MILE HIGH FLOOD DISTRICT
MUTCD
S
CONCRETE PIPE
ABSOLUTE DIFFERENCE OF GRADE
PERCENTAGES
FEDERAL EMERGENCY MANAGEMENT
AGENCY
HEATING, VENTILATION AND AIR
CONDITIONING
FH FIRE HYDRANT
SUPERVISORY CONTROL AND DATA
ACQUISITION LINE
MANUAL ON UNIFORM TRAFFIC
CONTROL DEVICES
SDDCTEA SURFACE DEPLOYMENT AND
DISTRIBUTION COMMAND
TRANSPORTATION ENGINEERING AGENCY
GRAPHIC SYMBOLS
KEY NOTE NUMBER FOR EXISTING CONDITION AND DEMOLITION PLANS
KEY NOTE NUMBER FOR SITE , AND GRADING
STRUCTURE NUMBERS
SMH
KEY NOTE NUMBER FOR UTILITY PLANS
LEGEND
C-001
L E
G E
N D
A
B B
R E
V I A
T I O
N
A
T
E S
DEMOLITION OF FUEL TANK
DEMOLITION OF CONCRETE PAVEMENT
DEMOLITION OF ASPHALT PAVEMENT
DEMOLITION OF STORM DRAIN PIPES
DEMOLITION OF SANITARY SEWER PIPES
APPROXIMATE LIMITS FOR EXCAVATION
DEMOLITION OF FUEL PIPES
SD
SAN
W
COMM
SAN
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING COMMUNICATION LINE
EXISTING SANITARY SEWER LINE
EXISTING STORM DRAIN LINE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM DRAIN MANHOLE
EXISTING INDUSTRIAL WASTE MANHOLE
EXISTING CATCH BASIN
SD
SURVEY NOTES
1. THE SUBSURFACE UTILITIES SHOWN HAVE BEEN INVESTIGATED AND DEPICTED IN
ACCORDANCE WITH CI/ASCE 38-02 AND THE SCOPE OF WORK BETWEEN KCI TECHNOLOGIES
AND THE CLIENT. KCI RECOMMENDS THAT THE CONTRACTOR AND ANY OTHER USERS OF THIS
INFORMATION REVIEWS AND UNDERSTANDS THE SCOPE OF WORK AND LIMITS OF THE UTILITY
INVESTIGATION LEADING TO THE UTILITY DEPICTIONS.
2. RELIANCE UPON THIS INFORMATION FOR RISK MANAGEMENT PURPOSES DOES NOT RELIEVE
ANY PARTY FROM FOLLOWING ALL APPLICABLE UTILITY DAMAGE STATUTES, POLICIES, AND/OR
INDUSTRY BEST PRACTICES WHEN PERFORMING EXCAVATIONS.
3. UTILITY SIZE AND MATERIAL ARE DETERMINED THROUGH AVAILABLE UTILITY OWNER
INFORMATION UNLESS OTHERWISE CONFIRMED BY ACTUAL EXPOSURE.
4. UTILITIES LABELED AS UNKNOWN TYPE HAVE NO CORRELATED RECORDS OR VISIBLE
APPURTENANCES TO DETERMINE FUNCTION OR TYPE.
5. UTILITY FIELD MAPPING SERVICE WAS STARTED ON 01/08/2019 AND COMPLETED ON 02/07/2019.
UTILITIES MAY HAVE BEEN ADJUSTED, REMOVED, RELOCATED OR ADDED AFTER THIS DATE.
6. UTILITIES NOTED TO BE ABANDONED OR OUT OF SERVICE HAVE BEEN NOTED AS SUCH FROM
THE INFORMATION PROVIDED BY OTHERS. USERS OF THIS DATA SHOULD VERIFY THIS STATUS
INFORMATION.
7. APPARENT EDGES OF THE UNDERGROUND TANKS WERE DETERMINED THROUGH THE USE OF
GROUND PENETRATING RADAR (GPR). THE RESULTING QUALITY OF INFORMATION THAT WAS
ABLE TO BE COLLECTED VARIED CONSIDERABLY. TANK EDGES WERE NOT ALWAYS CLEARLY
APPARENT FOR THE PORTIONS OF OR AN ENTIRE SIDE. DEPICTION OF THE APPARENT EDGES
IS BASED ON CONNECTING THE INFORMATION THAT WAS ABLE TO BE COLLECTED. LOCATION
OF ACTUAL EDGES MAY VARY FROM WHAT IS DEPICTED.
8. IN MANY CASES UTILITIES WERE FOUND AT DIFFERENT LOCATIONS THAN WHAT WAS SHOWN
ON THE UTILITY RECORDS. WHERE AN APPARENT FUNCTIONALLY EQUIVALENT UTILITY
FACILITY WAS FOUND AT A DIFFERENT LOCATION, THE LOCATION OF THE UTILITY PER THE
RECORDS IS NOT DEPICTED. IN CASES WHERE A FUNCTIONALLY EQUIVALENT UTILITY FACILITY
WAS NOT FOUND, THE UTILITY FACILITY IS DEPICTED PER RECORDS AT QUALITY LEVEL D.
9. THE DESIGN/BUILD (D/B) CONTRACTOR SHALL BE RESPONSIBLE FOR PERFORMING A DETAILED
TOPOGRAPHIC SURVEY AND SETTING BENCHMARKS FOR THE PROJECT.
DEMOLITION NOTES
1. THE CONTRACTOR SHALL FIELD VERIFY ACTUAL SITE CONDITIONS PRIOR TO THE START OF
WORK. THERE IS NO WARRANTY OR GUARANTEE ON THE COMPLETENESS OR CORRECTNESS OF
THE EXISTING CONDITION INFORMATION SHOWN ON THESE DRAWINGS. ANY DISCREPANCY
FOUND SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE COTR PRIOR TO STARTING
WORK.
2. THE CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICAL LOCATIONS OF EXISTING
UTILITIES PRIOR TO STARTING WORK AND SHALL NOTIFY THE COTR OF ANY DISCREPANCIES
THAT EXIST.
3. ALL EXISTING UTILITY SURFACE FEATURES INCLUDING BUT NOT LIMITED TO MANHOLES, HAND
HOLES, MECHANICAL LIDS, VALVE BOXES, ETC. WITHIN THE LIMITS OF DISTURBANCE TO BE
ADJUSTED TO FINISHED GRADE UNLESS OTHERWISE NOTED.
4. THE CONTRACTOR SHALL MAINTAIN POSITIVE DRAINAGE AWAY FROM BUILDINGS AND
STRUCTURES AT ALL TIMES.
5. THE CONTRACTOR SHALL CONTACT BLUE STAKES OF UTAH 811 AT LEAST 48 HOURS PRIOR TO
BEGINNING ANY DEMOLITION, UTILITY, OR EXCAVATION ACTIVITY.
6. ALL EXISTING FEATURES OUTSIDE OF THE LIMITS OF DISTURBANCE ARE TO REMAIN, UNLESS
OTHERWISE NOTED.
7. COORDINATE REMOVAL OF EXISTING UTILITIES WITH INSTALLATION OF NEW UTILITIES TO
MINIMIZE OUTAGE DURATION. ANY OUTAGE MUST BE COORDINATED IN ADVANCE WITH
APPROPRIATE BASE FACILITIES MANAGEMENT.
8. SAWCUT AND REMOVE EXISTING CONCRETE PAVEMENT AS NEEDED TO INSTALL NEW
CONCRETE PADS.
9. ALL EXISTING SURFACE FEATURES INCLUDING UTILITIES AS NOTED ON EXISTING CONDITION
AND DEMOLITION PLAN (C-100) TO BE DEMOLISHED BY THE CONTRACTOR. CONTRACTOR SHALL
BE RESPONSIBLE FOR THE SAFE REMOVAL AND THE DISPOSAL OF ALL DEMOLISHED MATERIAL
OFF- SITE (BASE) AT NO ADDITIONAL COST TO THE OWNER.(GOVERNMENT/HILL AFB).
F
PROPOSED ABOVE GROUND FUEL TANK
PROPOSED CONCRETE PAVEMENT
PROPOSED ASPHALT PAVEMENT
PROPOSED SANITARY SEWER MANHOLE
APPROXIMATE LIMIT OF DISTURBANCE
APPROXIMATE LIMIT OF WORK
PROPOSED GRADES
APPROXIMATE PROPOSED GRADE SPOT
SHOTS
PROPOSED BOLLARDS
82.10
BO
PROPOSED FUEL LINES
PROPOSED UNDERGROUND ELECTRIC CONDUIT
PROPOSED SEWER PIPES
PROPOSED STORM DRAIN MANHOLE
PROPOSED SANITARY SEWER MANHOLE
PROPOSED SEWER CLEAN OUTS
PROPOSED OIL WATER SEPARATOR
PROPOSED BLOW OFF TANK
PROPOSED ELECTRICAL PULL BOX
S/Co
OWS-1
BFT-1
PB
W
R
N
S
A
N
S
A
N
S
A
N
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN SAN SAN SAN
S
A
N
S A
N
S
D
S
D
S D
S D
S
D
S
D
S
D
S
D
S
D
S D
S D
S D
S D
S D
S D
S D
S D
S D
WW
W
W W
WW
W
W W
WW
W
W W
W
WWWWWWWWWWWW
W
W
EEEEEEEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W W W W W W W W W W W W W W W W
W W
W
E
E
E
E W
W
W
S A
N
W W
S D
S D
S D
C
O
M
M
C
O
M
M
C
O
M
M
W
W
W
W
E
W
SD
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
F i l e
P a t h
P l o t
D a t e
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
US Army Corps of Engineers n a a e c o m n e t c o m l f s A
M E
R A r l i n g t o n U
S A
R L
D
C S
P r o j e c t s B
D L
H i l l
A F
B
S t e a m
U p g r a d e
C
A D
G
I S
C
A D
S
H E
E T
S B
C
E X
I S
T I N
G
C
O N
D I T
I O
N
A
M
O L
I T
I O
N
P
L A
N d w g
A
M
H I L L
A
F B
U
T
S A
C R
A M
E N
S
T R
I C
T
A E
C O
M
W
I L S
V
D
A R
L I N
G T
O N
V
A
L
N K
N K
A J Z
F E
B R
U A
W D
Y F
W D
Y D
B L D
G
S
T E
A
G
R A
D E
M E
F I N
N
S T
R U
C T
I O
N
C-100
E X
I S
T I N
G
C
O N
D I T
I O
N
A
M
O L
I T
I O
N
P
L A
N
EXISTING STORM/ SEWER STRUCTURE TABLE
NAME TYPE
ELEVATIONS (FT)
SDCB-6 STORM DRAIN
CATCH BASIN
RIM = 4780.20'
INV OUT (8" CONC) =
4775.24' (E)
SDBC-7 STORM DRAIN
CATCH BASIN
RIM= 4780.17'
INV IN (8"CONC)=
4775.76'(W)
INV OUT (8" CONC)=
4775.73'(E)
SSMH-1 SEWER
INDUSTRIAL
MANHOLE
RIM = 4780.70'
INV OUT (10" IND) =
4774.86' (S)
SSMH-4 SEWER
MANHOLE
RIM = 4781.50'
INV IN = 4773.62' (W)
SSMH-3 SEWER
MANHOLE
RIM = 4782.25'
INV IN = 4775.49' (E)
INV OUT = 4775.47' (W)
SSMH-5 SEWER
MANHOLE
RIM = 4781.43'
INV IN = 4775.69' (S)
INV IN = 4775.88' (SE)
INV OUT = 4775.64' (N)
SDMH-12 STORM DRAIN
MANHOLE
RIM = 4781.85'
INV IN = 4773.89' (NW)
SDCB-I4 STORM DRAIN
CATCH BASIN
RIM = 4782.63'
INV OUT = 4777.87' (NW)
SDMH -I 1 STORM DRAIN
MANHOLE
RIM = 4782.98'
INV IN = 4775.75' (NW)
INV IN = 4777.43' (SE)
INV IN = 4775.60' (W)
INV OUT = 4775.58' (NE)
SDMH- I 7 STORM DRAIN
MANHOLE
RIM = 4782.76'
INV OUT = 4776.14'(E)
SDMH -I 0 STORM DRAIN
MANHOLE
RIM = 4782.44'
INV IN = 4776.14' (NE)
INV OUT = 4775.54' (S)
SDCB-I 3 STORM DRAIN
CATCH BASIN
RIM = 4781.96'
INV IN= 4780.08' (NE)
INV OUT = 4779.17' (SW)
SSMH-8 SEWER
MANHOLE
RIM = 4781.78'
INV IN = 4779.64' (E)
INV IN = 4777.62' (S)
INV IN = 4777.50' (S)
(STEAM)
INV OUT = 4777.46' (N)
SSMH-15 SEWER
MANHOLE
RIM = 4781.28'
INV = 4776.78' (N)
1A
1B
1B
Scale: 1:20
EXISTING CONDITIONS AND DEMOLITION PLAN
B8
N
GRAPHIC SCALE
DEMOLITION KEY NOTES
1A
EXISTING UNDERGROUND FUEL TANKS TO BE DEMOLISHED
AND REMOVED ALONG WITH ALL TANKS FITTINGS AND
ANCHORS.
EXISTING UNDERGROUND ABANDONED FUEL TANK TO BE
DEMOLISHED AND REMOVED WITH ALL REMAINING TANK
FITTINGS AND ANCHORS.
EXISTING ABOVE GROUND FEATURES FOR UNDERGROUND
TANK TO BE DEMOLISHED.
EXISTING UTILITY TRENCH FOR FUEL LINES WITH CONCRETE
SLABS TO BE DEMOLISHED ALONG WITH FUEL LINE 5 FOOT OFF
THE EXISTING BUILDING.
EXISTING UNDERGROUND SEDIMENTATION TANK TO BE
DEMOLISHED AND REMOVED.ALONG WITH ALL FITTINGS.
EXISTING ABOVE GROUND BLOW OFF TANK STRUCTURE TO BE
DEMOLISHED AND REMOVED.
EXISTING ASPHALT PAVEMENT TO BE DEMOLISHED.
EXISTING STORM DRAIN PIPES, INLET AND MANHOLE TO
REMAIN AND BE PROTECTED THROUGHOUT THE
CONSTRUCTION
EXISTING SANITARY SEWER LINE TO BE DEMOLISHED.
EXISTING STORM DRAIN (ROOF DRAINS) FROM THE BUILDING
TO REMAIN AND FUNCTIONAL DURING CONSTRUCTION.
1B
LEGEND
DEMOLITION OF FUEL TANK
DEMOLITION OF CONCRETE PAVEMENT
DEMOLITION OF ASPHALT PAVEMENT
DEMOLITION OF STORM DRAIN PIPES
DEMOLITION OF SANITARY SEWER PIPES
DEMOLITION EXISTING FUEL LINES
APPROXIMATE LIMITS FOR EXCAVATION
APPROXIMATE LIMIT OF DISTURBANCE
APPROXIMATE LIMIT OF WORK (CONTRACTOR
STAGING AREA)
SD
SAN
W
COMM
SAN
EXISTING GAS LINE
EXISTING WATER LINE
EXISTING COMMUNICATION LINE
EXISTING SANITARY SEWER LINE
EXISTING STORM DRAIN LINE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM DRAIN MANHOLE
EXISTING INDUSTRIAL WASTE MANHOLE
EXISTING CATCH BASIN
SD
APPROXIMATE AREA BEING DESIGNATED FOR
CONTRACTOR TRAILERS STAGING AND STORAGE.
EXISTING ELECTRICAL LINE TO
REMAIN FUNCTIONAL AND TO BE PROTECTED
THROUGHOUT THE CONSTRUCTION
EXISTING STEAM LINES WITH TRENCH TO
REMAIN FUNCTIONAL AND TO BE PROTECTED
THROUGHOUT THE CONSTRUCTION
1. THE LIMIT OF DISTURBANCE (LOD) AND THE LIMIT OF WORK
(LOW) DELINEATED ON PLANS ARE APPROXIMATE.
CONTRACTOR SHALL BE RESPONSIBLE FOR DELINEATING THE
FINAL LOD AND LOW LIMITS AFTER PERFORMING A DETAILED
SITE SURVEY.
2. ANY DAMAGE TO SITE FEATURES IDENTIFIED TO REMAIN AND
BE FUNCTIONAL DURING THE CONSTRUCTION OF THE
PROJECT TO BE REPAIRED BY THE CONTRACTOR AT NO COST
TO THE OWNER (GOVERNMENT) OR THE HILL AFB.
GENERAL NOTES
W
R
N
S
A
N
S
A
N
S
A
N
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN SAN SAN SAN
S
A
N
S A
N
S
D
S
D
S D
S D
S
D
S
D
S
D
S
D
S
D
S D
S D
S D
S D
S D
S D
S D
S D
S D
WW
W
W W
WW
W
W
WW
W W
W W
W
WWWWWWWWWWWW
W
W
EEEEEEEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W W W W W W W W W W W W W W W W
W W
W
E
E
E
E W
W
W
S A
N
W W
S D
S D
S D
C
O
M
M
C
O
M
M
C
O
M
M
W
W
W
W
E
W
SD
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
F i l e
P a t h
P l o t
D a t e
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
US Army Corps of Engineers n a a e c o m n e t c o m l f s A
M E
R A r l i n g t o n U
S A
R L
D
C S
P r o j e c t s B
D L
H i l l
A F
B
S t e a m
U p g r a d e
C
A D
G
I S
C
A D
S
H E
E T
S B
C
S
S I T
E
P
L A
N d w g
A
M
H I L L
A
F B
U
T
S A
C R
A M
E N
S
T R
I C
T
A E
C O
M
W
I L S
V
D
A R
L I N
G T
O N
V
A
L
N K
N K
A J Z
F E
B R
U A
W D
Y F
W D
Y D
B L D
G
S
T E
A
G
R A
D E
M E
F I N
N
S T
R U
C T
I O
N
Scale: 1:20
SITE AND GRADING PLAN
B8
N
GRAPHIC SCALE
57'-6"
44'-0"
22'-0"
57'-6"
17'-0"
20'-9"
47'-6"
12'-0"
TANK 1 40,000 GALLON
T A
K
G
L
L O
N
T A
K
L
L O
N
34'-0"
GENERAL NOTES
PROPOSED ABOVE GROUND FUEL TANKS DOUBLE WALL
LINED (40,000 GALLON). SEE TYPICAL DETAIL H2 ON
SHEET C-500.
PROPOSED CONCRETE PAD FOR ABOVE GROUND
STORAGE TANKS.
PROPOSED UTILITY TRENCH FOR FUEL LINE WITH
CONCRETE SLABS. SEE TYPICAL DETAIL B2 ON SHEET
C-500.
PROPOSED BOLLARDS. SEE DETAIL H14 ON SHEET C-500.
PROPOSED CONCRETE PAVEMENT OVER EXISTING
STEAM LINE TO BE RECONSTRUCTED TO MATCH THE
EXISTING GRADES.
PROPOSED ASPHALT PAVEMENT TO MATCH THE
EXISTING PAVEMENT SECTION.
PROPOSED SANITARY SEWER MANHOLE
PROPOSED SEWER CLEANOUTS
PROPOSED UNDERGROUND OIL/WATER SEPARATOR
WITH H-20 TRAFFIC LOADING FRAME AND COVER.
PROPOSED UNDERGROUND BLOW OFF TANK.
CS100
S I T
E
P
L A
N
LEGEND
PROPOSED ABOVE GROUND FUEL TANK
PROPOSED CONCRETE PAVEMENT
PROPOSED ASPHALT PAVEMENT
PROPOSED SANITARY SEWER MANHOLE
APPROXIMATE LIMITS OF EXCAVATION
APPROXIMATE LIMIT OF DISTURBANCE
APPROXIMATE LIMIT OF WORK
PROPOSED GRADE
APPROXIMATE PROPOSED GRADE SPOT
SHOTS
PROPOSED BOLLARDS
TOTAL FUEL REQUIRED FOR (1) 750KW EXISTING GENERATOR TO REMAIN AND 5 NEW BOILERS = 116,051
GALLONS. PROPOSING (3) 40,000 GALLON DOUBLE WALLED HORIZONTAL TANKS = 120,000 GALLONS.
SITE PLAN NOTES
BO
BO
BO
BO (TYP).
BO
TYP.
1A
1 1
1B
1A
1A
1B
82.10
82.10
82.10
82.10
82.10
BO
82.20
82.25
82.20
82.25
82.20
82.20
82.20
1. CONTRACTOR SHALL CONFIRM THE FINAL FUEL QUANTITY
REQUIREMENTS BASED ON EQUIPMENTS (BOILERS)
PURCHASED.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL
ALIGNMENTS AND SIZES OF THE NEW ABOVE GROUND FUEL
STORAGE TANKS.
3. ALL NEW CONCRETE PAVEMENTS ON THE PROJECT SHALL BE
DESIGNED BY THE CONTRACTOR. THE CURRENT SITE PLAN
SHOWS THE EXTENT OF CONCRETE PAVEMENT FOR
REFERENCE PURPOSES ONLY.
4. THE SIZE AND SHAPE OF THE NEW UNDERGROUND
OIL/WATER SEPARATOR (OWS) AND THE NEW UNDER GROUND
BLOW OFF TANK (BFT) AS SHOWN ON PLANS IS FOR
REFERENCE PURPOSES ONLY. CONTRACTOR SHALL BE
RESPONSIBLE FOR THE FINAL DESIGN.
APPROXIMATE AREA BEING DESIGNATED FOR
CONTRACTOR TRAILERS STAGING AND STORAGE.
W
R
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN SAN
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
SAN SAN SAN SAN SAN SAN
S A
N
S
A
N
S A
N
S
D
S
D
S
D
S
D
S D
S D
S D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
S D
WWW
WWW
WWW
WW
WWW
WWW
WWW
W
WWWWWWWWWWWWWWWW
W
W W
EEEEEEEEEEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
W W W W W W W W W W W W W W W W W W W W W
W W
W W
E
E
E
E
E
E
W
W
W
W
S A
N
S A
N
W W
W
S
D
S D
S D
S D
C
O
M
M
C
O
M
M
C
O
M
M
C
O
M
M
W
W
W
W
W
E
E
W
SD
SD
LOD LOD LOD LOD
L O
D L
O D
L O
D L
O D
L O
D
LODLODLODLODLODLOD
LODLODLODLODLOD
L
O
D
L
O
D
L
O
D
LOD
L O
D L
O D
LOD LOD LOD
LOD
L O
D
LOD
LOD
L O
D L
O D
LOD
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
LOD
LOD
L O
D
LOD
L O
W L O
W
LOW LOW LOW LOW LOW LOW LOW LOW LOW
L O
W L O
W
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
F i l e
P a t h
P l o t
D a t e
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
US Army Corps of Engineers n a a e c o m n e t c o m l f s A
M E
R A r l i n g t o n U
S A
R L
D
C S
P r o j e c t s B
D L
H i l l
A F
B
S t e a m
U p g r a d e
C
A D
G
I S
C
A D
S
H E
E T
S B
C
U
U T
I L
I T
Y
P
L A
N d w g
A
M
H I L L
A
F B
U
T
S A
C R
A M
E N
S
T R
I C
T
A E
C O
M
W
I L S
V
D
A R
L I N
G T
O N
V
A
L
N K
N K
A J Z
F E
B R
U A
W D
Y F
W D
Y D
B L D
G
S
T E
A
G
R A
D E
M E
F I N
N
S T
R U
C T
I O
N
Scale: 1:20
UTILITY PLAN
B8
N
00 20' 40'
GRAPHIC SCALE
BUILDING 260
BUILDING 257
UTILITY PLAN NOTES
PROPOSED UNDERGROUND OIL/WATER SEPARATOR.
CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGNING
THE SIZE AND SHAPE OF THE STRUCTURE.
PROPOSED SANITARY SEWER MANHOLES. CONTRACTOR
SHALL BE RESPONSIBLE FOR DESIGNING THE SIZE OF THE
MANHOLE.
PROPOSED SEWER CLEANOUTS. CONTRACTOR SHALL BE
RESPONSIBLE FOR DESIGNING THE SIZE AND THE NUMBER
OF CLEANOUTS REQUIRED.
APPROXIMATE ALIGNMENT OF THE NEW DIESEL FUEL
SUPPLY PIPE FROM AST'S TO THE BUILDING. CONTRACTOR
SHALL BE RESPONSIBLE FOR THE FINAL SIZE AND THE
ALIGNMENT OF THE NEW DIESEL FUEL LINES. SEE
MECHANICAL PLANS FOR SIZING OF THE FUEL LINES INSIDE
THE BUILDING B260 .
RELOCATE THE INCOMING 6-INCH GAS LINE .EXISTING 6"
GAS PIPING TO BE REMOVED BACK TO BELOW GROUND
LEVEL AND TEMPORARILY CAPPED.PROVIDE GAS
CONNECTION TO TO TEMPORARY /RENTAL BOILERS.
SEE PLUMBING DRAWING PD101.
PROPOSED UNDERGROUND BLOW OFF TANK. CONTRACTOR
SHALL BE RESPONSIBLE FOR DESIGNING THE SIZE AND THE
SHAPE OF THE BLOW OFF TANK.
PROPOSED ELECTRICAL CONNECTION (PVC CONDUIT) TO
THE NEW FUEL TANKS (AST'S) WITH A NEW PULL BOX.
PROPOSED ELECTRICAL PULL BOX.
LEGEND
PROPOSED FUEL LINES
PROPOSED UNDERGROUND ELECTRIC CONDUIT
PROPOSED SEWER PIPES
PROPOSED SANITARY SEWER MANHOLE
PROPOSED SEWER CLEAN OUTS
PROPOSED OIL WATER SEPARATOR
PROPOSED BLOW OFF TANK
PROPOSED ELECTRICAL PULL BOX
FUEL TANK ABOVE GROUND
F U
E L
T
A N
K
A
B O
V
O
U N
D
F U
E L
T
A N
K
A
B O
V
O
U N
D
S/Co
S/Co
SSMH
SSMH
S/Co
S/Co
O W
S
SSMH
SS
S/Co
CU100
U T
I L
I T
Y
P
L A
N
APPROXIMATE AREA BEING DESIGNATED FOR
CONTRACTOR TRAILERS STAGING AND STORAGE.
6 IN
C
H
I
N
C
H
PRIVATE
PRIVATE
1. THE LIMIT OF DISTURBANCE (LOD) AND THE LIMIT OF WORK
(LOW) DELINEATED ON PLANS ARE APPROXIMATE.
CONTRACTOR SHALL BE RESPONSIBLE FOR DELINEATING THE
FINAL LOD AND LOW LIMITS AFTER PERFORMING A DETAILED
SITE SURVEY.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGNING THE
PIPE SIZES AND THE ALIGNMENTS OF THE FUEL LINE TO THE
NEW ABOVE GROUND FUEL TANKS FROM THE EXISTING
BUILDING B260.
3. FOR ALL NEW UTILITY SIZES AND CONNECTION UPGRADED
UNDER THIS PROJECT, REFER TO MECHANICAL AND PLUMBING
PLANS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGNING THE
SHAPE AND THE SIZE OF THE NEW UNDERGROUND OIL WATER
SEPARATOR.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGNING THE
SHAPE AND THE SIZE OF THE NEW UNDERGROUND BLOW OFF
TANK.
GENERAL NOTES
OWS-1
BFT-1
PB
PB
PB
PB
SSMH
B F
T
W
R
47'-6" INNER
D
C
C
18"
18"
18"
C
CC
C
L
13"
C
18"
Ø12'-0"
INNER
AF B
210"
21"
6"
21"
204"
SHEET ID
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R I P
T I O
N
F i l e
P a t h
P l o t
D a t e
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
BLDG 260
US Army Corps of Engineers n a a e c o m n e t c o m l f s A
M E
R A r l i n g t o n U
S A
R L
D
C S
P r o j e c t s B
D L
H i l l
A F
B
S t e a m
U p g r a d e
C
A D
G
I S
C
A D
S
H E
E T
S B
C
S I T
E
D
E T
A I L
S d w g
A
M
H I L L
A
F B
U
T
S A
C R
A M
E N
S
T R
I C
T
A E
C O
M
W
I L S
V
D
A R
L I N
G T
O N
V
A
L
N K
N K
A J Z
F E
B R
U A
W D
Y F
W D
Y D
B L D
G
S
T E
A
G
R A
D E
M E
F I N
N
S T
R U
C T
I O
N
C-500
S I T
E
D
E T
A I L
S
LEGEND
DESIGN DATA
F
D
E
C
B
CAPACITY -
TANK MATERIAL -
CONSTRUCTION -
THICKNESS -
THICKNESS -
EXT. FINISH -
INT. FINISH -
TANK TEST -
LABEL -
A
OUTER- HEADS: SHELL:
INNER- HEADS: SHELL:
40,000 GALLONS
TYPE - DOUBLE WALL - TYPE I
NO. REQ. - -
OPERATING PRESSURE - ATMOSPHERIC
OUTER - LAP WELD OUTSIDE ONLY
UL 142
INNER - 5 PSIG
NONE
INNER - LAP WELD OUTSIDE ONLY
MILD CARBON STEEL
THE FINAL FINISH OF THE FUEL TANKS
3/8"
1/4"
3/8"
1/4"
4" FITTING
2" INTERNAL INTERSTITIAL MONITOR PIPE
10" RFSO 150# FLANGE THROUGH OUTER SHELL ONLY- MARK
WITH SPECIAL WARNING LABEL - INTERSTITIAL EMERGENCY
VENT USE ONLY
SPECIFIC GRAVITY = 1.0
10" FFSO 150# FLANGE - PRIMARY EMERGENCY
VENT
24"Ø TIGHT BOLT MANWAY w/ 1/8" FIBREFLEX
GASKET MATERIAL.
3" x 3" PLATE W/ 1/2"Ø (MIN.) HOLE ON ℄
(GROUNDING LUG - ONE REQ'D)
OUTER - +3 PSIG OR 13"hg VACUUM
H2
C-500
40,000 GALLLON HORIZONTAL DOUBLE WALLED ABOVE GROUND STORAGE TANK DETAIL
NTS
C OF BOLLARDL
CONC CAP
1"
CONCRETE
CLASS AA (AE)
1'-6"
CONCRETE FILLED SET HOLE
NOTES:
CONTRACTOR TO PROVIDE ISOLATION
JOINTS AT BOLLARDS
6" DIA SCHEDULE 40 GALVANIZED STEEL
PIPE BOLLARD CONC FILLED; PAINTED
YELLOW
FILL GAP BETWEEN SLEEVE AND POST
WITH SEALANT, 1" DEPTH
FINISH GRADE
8" DIA SCHEDULE 40 STEEL PIPE SLEEVE
WITH END PLATE 1/4"x1'x
#5 BAR 12" LONG THROUGH PIPE
H14
C-500
TYPICAL BOLLARD
NTS
TO BE COORDINATED WITH HILL AFB
#4 @12" O.C. E.W.
6"
M
I N
6"
3'-0"
4"
6"6"
4"
BITUMINOUS PAVING
TO MATCH THE
EXISTING
NOTE:
TRENCH SLOPE TO DRAIN AND
CONNECT TO THE NEAREST
EXISTING STORM DRAIN SYSTEM.
4'-0" x 2'-0" REMOVABLE
PRECAST CONCRETE SLABS.
#4 @12" O.C. TRANSV
#3 @ 12" O.C. LONGIT.
B2
C-500
TYPICAL SECTION OF PIPE TRENCH
NTS
W
R
UP
UP
1 2 3 4 5 6 8 9 10 11
H
G
F
C
A
3.7 5.1
B
10.1
WOMEN'S
RESTROOM
MEN'S
RESTROOM
JANITORS
INSTRUMENT
REPAIR ROOM
GENERATOR AND
ELECTRICAL
ROOM
101A
BOILER ROOM
OFFICE/
CONTROL ROOM
PUMP ROOM
101B
CLOSET
106A
D
/2
C
L E
A R
12' - 0" CLEAR
005 005
0 8' 16'
1/8"=1'-0"SCALE:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
GENERAL NOTES
BLDG 260
PLAN NORTH
/7
/2
:0
:4
A
M
AD101
F
IR
S T
F L O
O R
D E
M O
L
IT
IO
N
P L A
N
B L D
G
S T
E A
M P
L A
N T
U P
G R
A D
E
S A
C R
A M
E N
T O
D
IS
T R
IC
T
A E
C O
M W
IL
S
O N
B L V
D
A R
L
IN
G T
O N
V
A
L
R H
Z W
M E
C h e c k e r
F E
B R
U A
R Y
W D
Y F
W D
Y D
F
IN
A L
R F
P
N O
T F
O R
C O
N S
T R
U C
T
IO
N
H
IL
L A
F B
U
T
1/8" = 1'-0"1
FIRST FLOOR DEMOLITION PLAN T
N
001 DEMOLISH DOOR(S), FRAMES, AND HARDWARE
002 DEMOLISH EXISTING TRANSOM WINDOW ABOVE DOOR
003 DEMOLISH CMU WALL AS NOTED TO ACCOMODATE NEW
OPENING
004 DEMOLISH CONCRETE FOUNDATION WALL AS NOTED TO
ACCOMODATE NEW OPENING
005 DEMOLISH EXISTING BOILERS AND ALL ASSOCIATED
EQUIPMENT INCLUDING STEEL PLATFORMS, TYP (REFER TO
MECHANICAL)
006 DEMOLISH EXISTING CONCRETE BOILER SUPPORTS, TYP
007 DEMOLISH EXISTING TRENCHES AS REQUIRED, TYP (REFER
TO MECHANICAL)
008 DEMOLISH EXISTING BOILER STACKS, TYP
012 DEMOLISH CONCRETE WALL AS NOTED TO ACCOMMODATE
NEW OPENING
013 DEMOLISH EXISTING WINDOW ABOVE CONCRETE
FOUNDATION WALL AS NOTED TO ACCOMODATE NEW 12'-0"
CLEAR OPENING + STRUCTURAL FRAMING DIMENSION
KEYNOTES
1. SEE SHEET G-002 FOR LEGEND, ABBREVIATIONS, AND
SYMBOLS.
2. NEW OPENING SHALL BE A MINIMUM OF 12' - 0" WIDE
CLEAR.
3. NEW OPENING SHALL BE A MINIMUM OF 16' - 0" IN HEIGHT
CLEAR OR TO UNDERSIDE OF EXISTING TRANSOM
LOUVER OR WINDOW.
4. ALL OPENING DIMENSIONS SHALL BE VERIFIED IN FIELD
TO ENSURE NEW BOILERS ARE SELECTED BASED ON
REQUIRED CRITERIA AND PER THE MAXIMUM DIMENSIONS
OF THE NEW OPENINGS.
5. THE NEW BOILERS WILL NEED TO BE COORDINATED WITH
THE SELECTED MANUFACTURER TO ENSURE THE
DIMENSIONS OF THE NEW BOILERS WILL WORK WITH
MAXIMUM CLEAR OPENING DIMENSIONS.
6. NEW OPENINGS MAY NEED TO BE LARGER THAN MINIMUM
"CLEAR" DIMENSIONS TO ACCOMMODATE ANY REQUIRED
STRUCTURAL FRAMING AND REINFORCEMENTS THAT
NEED TO BE PROVIDED FOR THESE NEW OPENINGS,
"CLEAR" DIMENSIONS OF 12' - 0" X 16' - 0". THIS WILL NEED
TO BE COORDINATED WITH STRUCTURAL DESIGNER OF
RECORD.
7. ALL EXISTING TO REMAIN SURFACES DAMAGED DURING
EXECUTION OF THE WORK SHALL BE REPAIRED TO
MATCH PRE-EXISTING CONDITIONS.
8. ALL PREVIOUSLY PAINTED SURFACES THAT BECOME
DAMAGED DURING EXECUTION OF THE WORK SHALL BE
REPAINTED AND REPAIRED TO THE FULL EXTENT OF
DAMAGED COMPONENTS TO MATCH EXISTING ADJACENT
SURFACES.
W
R
1 2 3 4 5 6 8 9 10 11
H
G
F
C
A
3.7 5.1
B
10.17
D
010010
014 014
1. ALL EXISTING TO REMAIN SURFACES DAMAGED DURING
EXECUTION OF THE WORK SHALL BE REPAIRED TO
MATCH PRE-EXISTING CONDITIONS.
2. ALL PREVIOUSLY PAINTED SURFACES THAT BECOME
DAMAGED DURING EXECUTION OF THE WORK SHALL BE
REPAINTED AND REPAIRED TO THE FULL EXTENT OF
DAMAGED COMPONENTS TO MATCH EXISTING ADJACENT
SURFACES.
3. A BID OPTION IS INCLUDED IN THIS RFP FOR A TOTAL NEW
BUILT UP ROOF REPLACEMENT. PROVIDE A NEW BUILT
ROOF THAT SHALL CONSIST OF A 2 PLY MODIFIED
BITUMEN ROOF SYSTEM, R-30 SYSTEM THAT MEETS BASE
FACILITY DESIGN STANDARDS, NRCA STANDARDS
(NATIONAL ROOFING CONTRACTORS ASSOCIATION), UFC
3-110-03 AND UFC 3-330-02A. SEE NOTE #9 ON SHEET
G-002 AND RFP SECTION 01 10 10 (DESIGN CRITERIA) FOR
ADDITIONAL INFORMATION.
0 8' 16'
1/8"=1'-0"SCALE:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
GENERAL NOTES
BLDG 260
PLAN NORTH
/7
/2
:0
:4
A
M
AD102
R O
O F
D E
M O
L
IT
IO
N
P L A
N
B L D
G
S T
E A
M P
L A
N T
U P
G R
A D
E
S A
C R
A M
E N
T O
D
IS
T R
IC
T
A E
C O
M W
IL
S
O N
B L V
D
A R
L
IN
G T
O N
V
A
L
R H
Z W
M E
C h e c k e r
F E
B R
U A
R Y
W D
Y F
W D
Y D
F
IN
A L
R F
P
N O
T F
O R
C O
N S
T R
U C
T
IO
N
H
IL
L A
F B
U
T
1/8" = 1'-0"1
ROOF LEVEL DEMOLITION PLAN T
N
KEYNOTES
009 DEMOLISH EXISTING UNUSED ROOF MOUNTED BOILER
STACKS AND PATCH OPENING WITH NEW BUILTUP ROOF
SYSTEM (COVERBOARD, INSULATION AND MEMBRANE) TO
MATCH EXISTING ROOF SYSTEM
010 DEMOLISH EXISTING ROOF SYSTEM DOWN TO BARE
STRUCTURE AND PREPARE FOR NEW BUILT-UP ROOFING
SYSTEM INCLUSIVE OF INSULATION, ROOF DRAINS, ROOF
EQUIPMENT CURBS, FLASHING, PARAPET METAL COPING,
FALL PROTECTION ANCHOR SYSTEM, LIGHTNING
PROTECTION SYSTEM, ETC. (BID OPTION ONLY)
011 REMOVE AND STORE EXISTING ROOF EQUIPMENT SUCH AS
MECHANICAL HOODS AND OTHER EQUIPMENT TO BE
RE-INSTALLED WITH NEW ROOFING SYSTEM (BID OPTION
ONLY)
014 REMOVE EXISTING BOILER STACKS INCLUDING ASSOCIATED
ROOF FLASHING WHERE NEW BOILER STACKS WILL BE
INSTALLED, PREP OPENINGS TO RECIEVE NEW BOILER
STACK (COORDINATE FINAL LOCATION PER LAYOUT OF
MECHANICAL DRAWINGS)
W
R
J
J
UP
UP
1 2 3 4 5 6 8 9 10 11
H
G
F
C
A
A-202
A-201
A-201
A-202
0' - 9" 7' - 9" 17' - 0" 15' - 6" 1' - 6" 17' - 0" 1' - 6" 15' - 6" 14' - 11" 25' - 5" 25' - 4" 25' - 2" 1' - 6"
/2
/2
/2
32' - 8" 34' - 0"
56' - 7 3/4" 18' - 3 1/4" 26' - 6"
39' - 10" 22' - 4" 22' - 10" 57' - 4" 26' - 6"
WOMEN'S
RESTROOM
MEN'S
RESTROOM
JANITORS
INSTRUMENT
REPAIR ROOM
GENERATOR AND
ELECTRICAL
ROOM
101A
BOILER ROOM
OFFICE/
CONTROL ROOM
PUMP ROOM
101B
3.7 5.1
B
CLOSET
106A
10.1
1' - 8"
1' - 8"
D
C
L E
A R
/2
12' - 0" CLEAR
EQ EQ
B3
B1
B5
B4
B2
111111
111 AT MEZZANINE ABOVE
1. SEE SHEET G-002 FOR LEGEND, ABBREVIATIONS, AND
SYMBOLS.
2. NEW OPENING SHALL BE A MINIMUM OF 12' - 0" WIDE
CLEAR.
3. NEW OPENING SHALL BE A MINIMUM OF 16' - 0" IN HEIGHT
CLEAR OR TO UNDERSIDE OF EXISTING TRANSOM
LOUVER OR WINDOW.
4. ALL OPENING DIMENSIONS SHALL BE VERIFIED IN FIELD
TO ENSURE NEW BOILERS ARE SELECTED BASED ON
REQUIRED CRITERIA AND PER THE MAXIMUM DIMENSIONS
OF THE NEW OPENINGS.
5. THE NEW BOILERS WILL NEED TO BE COORDINATED WITH
THE SELECTED MANUFACTURER TO ENSURE THE
DIMENSIONS OF THE NEW BOILERS WILL WORK WITH
MAXIMUM CLEAR OPENING DIMENSIONS.
6. NEW OPENINGS MAY NEED TO BE LARGER THAN MINIMUM
"CLEAR" DIMENSIONS TO ACCOMMODATE ANY REQUIRED
STRUCTURAL FRAMING AND REINFORCEMENTS THAT
NEED TO BE PROVIDED FOR THESE NEW OPENINGS,
"CLEAR" DIMENSIONS OF 12' - 0" X 16' - 0". THIS WILL NEED
TO BE COORDINATED WITH STRUCTURAL DESIGNER OF
RECORD.
7. ALL EXISTING TO REMAIN SURFACES DAMAGED DURING
EXECUTION OF THE WORK SHALL BE REPAIRED TO
MATCH PRE-EXISTING CONDITIONS.
8. CLEAN AND PREPARE CONCRETE SLAB TO RECEIVE NEW
CONCRETE SEALANT.
9. ALL NEW EXTERIOR DOORS, LOUVERS, AND ASSOCIATED
TRIMS TO BE PAINTED TO MATCH DAKOTA BROWN
COLOR.
0 8' 16'
1/8"=1'-0"SCALE:
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
GENERAL NOTES
BLDG 260
PLAN NORTH
/7
/2
:0
:3
A
M
A-101
F
IR
S T
F L O
O R
P L A
N
B L D
G
S T
E A
M P
L A
N T
U P
G R
A D
E
S A
C R
A M
E N
T O
D
IS
T R
IC
T
A E
C O
M W
IL
S
O N
B L V
D
A R
L
IN
G T
O N
V
A
L
R H
Z W
M E
C h e c k e r
F E
B R
U A
R Y
W D
Y F
W D
Y D
F
IN
A L
R F
P
N O
T F
O R
C O
N S
T R
U C
T
IO
N
H
IL
L A
F B
U
T
1/8" = 1'-0"1
FIRST FLOOR PLAN T
N
KEYNOTES
101 NEW 12'-0" WIDE BY 16'-0" ROLL-UP DOOR, COORDINATE
POWER WITH ELECTRICAL (CLEAR OPENING IS EXCLUSIVE
OF STRUCTURAL FRAMING DIMENSION)
102 PATCH AND REPAIR EXISTING WALLS AT NEW OPENINGS TO
RECEIVE NEW ROLL UP DOOR TO CONDITIONS AND
FINISHES MATCHING ADJACENT WALLS
103 NEW TRENCHES AS REQUIRED FOR NEW BOILER
LOCATIONS, FINAL TRENCH LOCATIONS TO BE
COORDINATED AS CONTRACTOR FURTHER DEVELOPS THE
DESIGN (REFER TO MECHANICAL)
105 NEW BOILER (REFER TO MECHANICAL)
109 ONCE EXISTING TRENCHES HAVE BEEN REMOVED, NEW
TRENCHES BUILT, ADDITIONAL STRUCTURAL UPGRADES
ARE COMPLETED AND THE CONCRETE SLAB HAS BEEN
LEVELED TO SLOPE TO DRAINS, THEN CLEAN AND PREPARE
CONCRETE SLAB TO RECEIVE NEW CONCRETE SEALANT
110 PRIOR TO THE INSTALLATION OF THE NEW BOILERS AND
ASSOCIATED EQUIPMENT, PROVIDE A NEW TOPPING SLAB
OVER THE EXISTING CONCRETE FLOOR AFTER NEW
TRENCHES HAVE BEEN INCORPORATED AND UNUSED
TRENCHES HAVE BEEN ABANDONED AND INFILLED. PLACE A
TOPPING SLAB ON OVER THE EXISTING CONCRETE FLOOR
AFTER REQUIRED FLOOR REPAIRS ARE EXECUTED. ONCE
TOPPING SLAB HAS BEEN INCORPORATED, APPLY AN
INDUSTRIAL…