Attachment 1 Summary of Work.pdf
PDF 87 KB Posted
- Attached to
- Steam Plant Upgrades - Projects B260 at Hill AFB
- Solicitation number
- W9123822R0007
About this file
This solicitation and related documents outline requirements for a design-build contract to upgrade the steam plant at Building 260 at Hill Air Force Base. The project includes replacing five existing boilers with new dual-fuel 50 MMBH boilers achieving NOx emissions of 9 ppm. Underground fuel oil storage tanks will be replaced with aboveground tanks sized for seven days of peak storage. Existing buildings will receive seismic retrofitting and supporting equipment upgrades. The contractor must perform all design work and will be the designer of record. The estimated value is between $25-100 million. The NAICS code is 238990 and size standard is $16.5 million. The solicitation is set aside for small businesses. The Department of the Army Corps of Engineers Engineering District Sacramento is the issuing agency. The contractor must follow all security and training requirements for base access.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
22 November 2021
Attachment 1
Summary of Work Hill AFB, UT Building 260 Steam Plant
1. Scope of Work
This Design Build project includes construction to the boilers in Building (B) 260 will be replaced with five (5) new 50 MMBH boilers. The existing boiler fuel oil underground storage tanks (USTs) will be removed and replaced with appropriately sized above ground storage tanks (AST). The existing building will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.)
upgraded. The undersized emergency generator at B260 will be replaced to accommodate larger blower motor sizes due to flue gas recirculation (FGR).
2. Description
The Contractor shall furnish and install all labor, materials, tools, equipment, and supervision necessary to provide a complete and usable project per the Specific Technical Engineering and Design Criteria, Functional Design Criteria Requirements, including all attachments, Base Facility Design Standard, Architectural Compatibility Guide and requirements specified in the contract.
This project, the B260 Steam Plant Repairs includes the replacement of five new 50 million Btu/hour (MMBH) boilers. The boilers will achieve ultra-low oxides of nitrogen (NOx) emissions of 9 parts per million (ppm). The existing boiler fuel oil underground storage tanks (USTs) in both buildings will be removed and replaced with aboveground storage tanks (AST), which are sized for seven days of storage during peak heating season. The existing buildings will have seismic retrofitting and supporting equipment (deaerator, pumps, etc.) upgraded.
This is a design-build contract therefore the Contractor is required to perform design work prior to construction. The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him/her from performing any additional design as required to produce a complete set of construction documents.
The Government’s conceptual facility and site design provided in the RFP documents illustrates intent and functional relationships and does not indicate all necessary construction requirements or components. The Specific Technical Engineering and Design Criteria and Functional Design Criteria Room by Room Requirements describes associated technical, performance and systems requirements. The Contractor is responsible for the complete project design, shall retain all responsibilities, and be recognized as the Designer of Record.
Contractor shall perform work as stated in this Attachment 1 Summary of Work, Attachment 2 B260 Steam Plant Concept Design drawings and Specifications, Attachment 3 – Supplemental Contract Requirements, Attachment 4 Davis Bacon Wage Determination. Contractor is highly encouraged to attend the pre-proposal site visit and field verify all dimensions and layouts.
(Please note: The site visit will be completed as part of phase 2 of this solicitation) The project shall be designed within the criteria prescribed, as well as other codes and standards specified in the contract.
3. General Project Requirements:
Contractor shall follow all security requirements for base access. All Contractor and subcontractor personnel will need to obtain badges for all access on base from the security office.
22 November 2021
Attachment 1
AT Level I Training: All Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 30 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at http://jko.jten.mil/courses/atl1/launch.html The Contractor shall be responsible for the coordination of work performed by their employees and all subcontractors. The Contractor should inspect all work areas prior to submitting a proposal in accordance with FAR 52.236-3, Site Investigation and Conditions Affecting the Work. It shall be the Contractor’s responsibility to verify all current record drawings prior to the start of any and all design and/or construction work. The Contractor shall be responsible for the coordination and proper relationship of this work to the building premises and thoroughly familiarize themselves with all details of the work and working conditions, to verify all dimensions in the field, and advise the Administrative Contracting Officer (ACO) of any discrepancies before performing any work.
The Contractor is responsible for maintaining the site and all other Contractor controlled areas in such a manner as to minimize the risk of injury or accident to site personnel or others who may be in the area. The Contractor is also responsible for furnishing an identification badge/card to each individual working on the site.
4. After Award Administrative Contracting Officer (ACO) and Post Award POC and Work Coordination:
An Administrative USACE point of contact, ACO, and Contracting Officer Representative will be responsible for verifying that the Contractors’ performance and completion of work is in accordance with applicable requirements.
http://jko.jten.mil/courses/atl1/launch.html
File details come from the government source that posted it. Updated .