Attachment 9 As-builts B260 Fuel Oil - Existing Drawings.pdf
PDF 13 MB Posted
- Attached to
- Steam Plant Upgrades - Projects B260 at Hill AFB
- Solicitation number
- W9123822R0007
About this file
This document summarizes a federal solicitation for building upgrades at Hill Air Force Base. The solicitation seeks a design-build contractor to replace eight existing fuel oil boilers in Building 260 with new dual-fuel boilers meeting BACT standards. The project will phase boiler replacements to maintain steam production, require new wall openings, and include an emergency boiler for redundancy. The existing underground fuel oil tanks will be replaced with aboveground storage. Additional work includes seismic retrofitting and supporting equipment upgrades. The solicitation is a two-phase RFP to award a firm-fixed price construction contract between $25-100 million. The NAICS code is 238990 and size standard is $16.5 million. The product service code is Z2NB. This opportunity is set aside 100% for small businesses and issued by the Department of the Army Corps of Engineers Sacramento District.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
angel.flores Polygonal Line angel.flores Polygonal Line angel.flores Polygonal Line angel.flores Polygonal Line angel.flores Polygonal Line angel.flores Polygonal Line
Khanna, Nitin Typewriter
32,000 GAL
Khanna, Nitin Typewriter
32,000 GAL
Khanna, Nitin Typewriter
25,000 GAL
Khanna, Nitin Typewriter
25,000 GAL
Khanna, Nitin Typewriter
40,000 GAL
Khanna, Nitin Typewriter
40,000 GAL
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
File details come from the government source that posted it. Updated .