Steam Plant Upgrades - Projects B260 at Hill AFB
Solicitation number
W9123822R0007
Issued by

About this file

This document contains an attachment providing a project information form and details of a related federal contract opportunity. The project information form template requests details of relevant past project experience, including contract information, location, dates, owner and point of contact, description of scope, and explanation of relevance to the current project.

The related federal contract opportunity is a two-phase Design-Build solicitation seeking a Firm-Fixed Price construction contract to perform improvements and repair of boilers in Building 260 at Hill Air Force Base. The project scope involves replacing eight existing boilers with new dual-fuel boilers, upgrading supporting equipment, and seismic retrofitting of existing buildings. The estimated value is between $25-100 million. The NAICS code is 238990 and size standard is $16.5 million. This solicitation will proceed as a 100% Small Business Set Aside. The agency is the Department of the Army Corps of Engineers Engineering District Sacramento.

View the file

Other files

File Type Posted
Attachment 1 B260 KRSM Specifications Part 1_070122.pdf PDF
W9123822R0007-0008 - 20220701.pdf PDF
W9123822R0007-0007.pdf PDF
Attachment 12 Price Schedule - 20220601.pdf PDF
Attachment 5 Pre-Award Survey .pdf PDF
Attachment 6 Site Visit Map.pdf PDF
Attachment 1 B260 KRSM Specifications Part 1.pdf.pdf PDF
Attachment 4 DoL WD UT20220083 - 20220401.pdf PDF
W9123822R0007-0006 - 20220601.pdf PDF
Site Visit Sign in Sheet - 2022 05 05.pdf PDF
W9123822R0007 AMENDMENT 0005.pdf PDF
Attachment 9 As-builts B260 Fuel Oil - Existing Drawings.pdf PDF
Attachment 3 KRSM_BLDG260_HILL STEAMPLANT UPGRADE_Drawings.pdf PDF
W9123822R0007 AMENDMENT 0004.pdf PDF
Attachment 4 CWRR.pdf PDF
Attachment 11 As-builts BLDG 260 001-218 COMBINED.pdf PDF
Attachment 1 Specifications Part 1 KRSM_BLDG260_HILL STEAMPLANT UPGRADE.pdf PDF
Attachment 2 Specifications Part 2 KRSM_BLDG260_HILL STEAMPLANT UPGRADE.pdf PDF
Attachment 6 Pre-Award Survey .pdf PDF
Attachment 5 Site Visit Map.pdf PDF
W9123822R0007 A0003.pdf PDF
28 December 2021 Interested Vendor List.docx DOCX document
W9123822R0007 A0002.pdf PDF
W9123822R0007 A0001.pdf PDF
Attachment 1 Summary of Work.pdf PDF
Attachment 3 Supplemental Contract Requirements.pdf PDF
1442 W9123822R0007.pdf PDF
Attachment 2 B Specifications.pdf PDF
Attachment 4 Davis-Bacon Act WD.pdf PDF
Attachment 2 A Drawings.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

PROJECT INFORMATION FORM

1. Example Project Number: Start with “1” for the first of all submitted projects and number consecutively.

2. Name of Contractor(s) / Key Subcontractor (s): Provide the name of the firm(s) whose experience and capabilities are demonstrated by this example project. If a Joint Venture (JV) project is being submitted, demonstrate the roles and responsibilities of each JV partner.

3. Contract Number and Awarded Prime Contractor Name: If project work was performed under a federal contract, provide contract number assigned by the procuring Contracting Office and the name of the contractor that was awarded the contract.

4. Title and Location: Title and location of project or contract.

5. Month and Year Project Commenced and Month and Year Project was Completed: Include commencement date, original completion date and actual completion date, if different, add a succinct description for any time extensions.

6. Project Owner: Provide name of project and contract owner or user, such as a government agency or installation, an institution, or corporation or private individual.

7. Point of Contact (POC): Provide name of a person associated with the project owner or the organization that contracted for the construction who is very familiar with the project and the firm’s (or firms’) performance.

8. Point of Contact Telephone Number: provide POC’s telephone number with area code.

9. Description of the Project: Provide information relevant to the evaluation criteria, including but not limited to the following: contract type, dollar amount (original contract amount and final dollar value with an explanation for any difference), physical size of project, description of completed facility, building materials, project complexities, systems, engineering disciplines, and brief description of prime contracted effort.

Identify any institutional knowledge. If the firm proposed for this contract as prime contractor or key subcontractor performed as a subcontractor on the example project, describe the work effort pertaining to the subcontracted effort, not the prime contract requirement. Explain how the project demonstrates proper management of scope, schedule, and budget. Highlight and/or provide details demonstrating experience/capability relevant to the subject procurement, including phasing and/or sequencing

10. Provide name of branch offices, if any, involved in the example project and explain their roles, and their respective contact numbers.

11. Clearly describe how the example project is relevant to this project.

File details come from the government source that posted it. Updated .