SOF Assessment and Selection Training Complex

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912PM20R0003
Agency
ENDIST Wilmington US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1JZ Construction Of Miscellaneous Buildings
Place of performance
Fort Bragg Nc Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks design-build services for the construction of a Special Operations Forces Assessment and Selection Training Complex at Camp Mackall, North Carolina. The U.S. Army Corps of Engineers seeks to develop new training facilities, storage buildings, locker rooms, showers, guard houses, security infrastructure, and a physical training obstacle course. Proposals are due May 5, 2020 and will be evaluated based on past experience, performance, and price using the Lowest Price Technically Acceptable source selection process.

The opportunity has no set-aside designations. The project involves NAICS 2362 and PSC C-211 construction services with an estimated value over $10 million. The place of performance is Camp Mackall, North Carolina. Key requirements include the construction of training structures, a 25-station obstacle course, and supporting facilities like roads and utilities to support the complex within a 730-day period of performance. Current contractors were not named.

Notice text

8 versions

Update #8 · Latest ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

 Amendment 0001 - Adds requirement for bidders to submit questions about the solicitation through the Projnet Bidder Inquiry System.  Reference Solicitation Section 00 21 00.

Amendment 0002 - Corrects the Projnet Bidder Key.   Reference Solicitation Section 00 21 00.

Amendment 0003 - Provides a copy of the Proposal Cover Sheet, the Past Experience Form (Appendix 1, Example 1), and of the Past Performance Questionnaire (Appendix 1, Example 3).  No Example 2 exists.

Amendment 0004 - Extends the Proposals-due date from 08APR2020 to 13APR2020; Provides revised specifications (03 30 00 and 07 05 23) and twenty-two (22) revised plan sheets (PN86021_0004_Technical Summary of Changes); Photographs of construction site in a separate volume.

Amendment 0005 - Extends the proposal due date form 13 April 2020 to 30 April 2020, provided revised specifications and individual plan sheets.

Amendment 0006 - Replaces Davis Bacon Wage Determination NC20200025 dated 1/3/2020 with NC20200063 dated 1/3/2020 and provides added and revised specification sections and revised individual plan sheets, an added page to the submittal register, a revised Table of Contents, and conformed versions of the specifications Vol 1 and Vol 2.

Amendment 0007 - Extends the proposals-due date by five (5) calendar days from 30APR2020 to 05MAY2020; provides one (1) revised specification section and three (3) revised drawings; as well as a conformed verison of the Specifications Vol II.

Amendment 0008 - Corrects the extended proposal-due date in the solicitation body GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS from May 6 to May 5, 2020.

Update #7 ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

 Amendment 0001 - Adds requirement for bidders to submit questions about the solicitation through the Projnet Bidder Inquiry System.  Reference Solicitation Section 00 21 00.

Amendment 0002 - Corrects the Projnet Bidder Key.   Reference Solicitation Section 00 21 00.

Amendment 0003 - Provides a copy of the Proposal Cover Sheet, the Past Experience Form (Appendix 1, Example 1), and of the Past Performance Questionnaire (Appendix 1, Example 3).  No Example 2 exists.

Amendment 0004 - Extends the Proposals-due date from 08APR2020 to 13APR2020; Provides revised specifications (03 30 00 and 07 05 23) and twenty-two (22) revised plan sheets (PN86021_0004_Technical Summary of Changes); Photographs of construction site in a separate volume.

Amendment 0005 - Extends the proposal due date form 13 April 2020 to 30 April 2020, provided revised specifications and individual plan sheets.

Amendment 0006 - Replaces Davis Bacon Wage Determination NC20200025 dated 1/3/2020 with NC20200063 dated 1/3/2020 and provides added and revised specification sections and revised individual plan sheets, an added page to the submittal register, a revised Table of Contents, and conformed versions of the specifications Vol 1 and Vol 2.

Amendment 0007 - Extends the proposals-due date by five (5) calendar days from 30APR2020 to 05MAY2020; provides one (1) revised specification section and three (3) revised drawings; as well as a conformed verison of the Specifications Vol II.

Update #6 ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

 Amendment 0001 - Adds requirement for bidders to submit questions about the solicitation through the Projnet Bidder Inquiry System.  Reference Solicitation Section 00 21 00.

Amendment 0002 - Corrects the Projnet Bidder Key.   Reference Solicitation Section 00 21 00.

Amendment 0003 - Provides a copy of the Proposal Cover Sheet, the Past Experience Form (Appendix 1, Example 1), and of the Past Performance Questionnaire (Appendix 1, Example 3).  No Example 2 exists.

Amendment 0004 - Extends the Proposals-due date from 08APR2020 to 13APR2020; Provides revised specifications (03 30 00 and 07 05 23) and twenty-two (22) revised plan sheets (PN86021_0004_Technical Summary of Changes); Photographs of construction site in a separate volume.

Amendment 0005 - Extends the proposal due date form 13 April 2020 to 30 April 2020, provided revised specifications and individual plan sheets.

Amendment 0006 - Replaces Davis Bacon Wage Determination NC20200025 dated 1/3/2020 with NC20200063 dated 1/3/2020 and provides added and revised specification sections and revised individual plan sheets, an added page to the submittal register, a revised Table of Contents, and conformed versions of the specifications Vol 1 and Vol 2.

Update #5 ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

 Amendment 0001 - Adds requirement for bidders to submit questions about the solicitation through the Projnet Bidder Inquiry System.  Reference Solicitation Section 00 21 00.

Amendment 0002 - Corrects the Projnet Bidder Key.   Reference Solicitation Section 00 21 00.

Amendment 0003 - Provides a copy of the Proposal Cover Sheet, the Past Experience Form (Appendix 1, Example 1), and of the Past Performance Questionnaire (Appendix 1, Example 3).  No Example 2 exists.

Amendment 0004 - Extends the Proposals-due date from 08APR2020 to 13APR2020; Provides revised specifications (03 30 00 and 07 05 23) and twenty-two (22) revised plan sheets (PN86021_0004_Technical Summary of Changes); Photographs of construction site in a separate volume.

Update #4 ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

 Amendment 0001 - Adds requirement for bidders to submit questions about the solicitation through the Projnet Bidder Inquiry System.  Reference Solicitation Section 00 21 00.

Amendment 0002 - Corrects the Projnet Bidder Key.   Reference Solicitation Section 00 21 00.

Amendment 0003 - Provides a copy of the Proposal Cover Sheet, the Past Experience Form (Appendix 1, Example 1), and of the Past Performance Questionnaire (Appendix 1, Example 3).  No Example 2 exists.

Update #3 ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

 Amendment 0001 - Adds requirement for bidders to submit questions about the solicitation through the Projnet Bidder Inquiry System.  Reference Solicitation Section 00 21 00.

Amendment 0002 - Corrects the Projnet Bidder Key.   Reference Solicitation Section 00 21 00.

Update #2 ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

 Amendment 0001 - Adds requirement for bidders to submit questions about the solicitation through the Projnet Bidder Inquiry System.  Reference Solicitation Section 00 21 00.

Update #1 ·

This project consists of training space, storage space, locker rooms and showers, and building support space. New ECPs include pre- engineered guard houses, security gates, under vehicle surveillance systems, and all supporting communications, power, and water and sewer utilities. New training obstacle course include multiple physical training stations along a circuited route. Built-in building systems include fire alarm/mass notification, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities include site preparation, utilities (electrical, water, sanitary sewer, natural gas, chilled water, and information systems), lighting, vehicle parking, access drives and roads, curb and gutter sidewalks, storm drainage, landscaping, and other site improvements. Department of Defense (DoD) principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current DoD criteria. Access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included.

Attachments

Files attached to this notice, newest first
File Type Posted
W912PM20R00030008_Conformed.pdf PDF
W912PM20R00030008.pdf PDF
Amend_0007_10_28_13_Revised 4-18.pdf PDF
Amend_0007_FY20PN86021-RB-AE409.pdf PDF
Amend_0007_PN86021_0006_Technical_Summary_of_Changes.pdf PDF
Amend_0007_FY20PN86021-RB-CG103.pdf PDF
Amend_0007_FY20PN86021-RB-CU101.pdf PDF
Amend_0007_PN86021_RTA_SPECS_VOL_02.pdf PDF
W912PM20R00030007.pdf PDF
Amend_0006_32 92 23_ADDED.pdf PDF
Amend_0006_FY20PN86021-NCP-CI505.pdf PDF
Amend_0006_10 28 13_REVISED.pdf PDF
Amend_0006_FY20PN86021-RB-CU101.pdf PDF
W912PM20R00030006.pdf PDF
Amend_0006_FY20PN86021-SCP-CS402.pdf PDF
Amend_0006_07 13 53_ADDED.pdf PDF
Amend_0006_PN86021_0006_Technical Summary of Changes.pdf PDF
Amend_0006_FY20PN86021-AE102.pdf PDF
Amend_0006_FY20PN86021-RB-AE301.pdf PDF
Amend_0006_FY20PN86021-NCP-CS402.pdf PDF
Amend_0006_Table of Contents_REVISED.pdf PDF
W912PM20R00030006_Conformed.pdf PDF
Amend_0005_FY20PN86021-NN-SC523.pdf PDF
W912PM20R00030005_Conformed.pdf PDF
W912PM20R00030005.pdf PDF
PN86021_0005_Technical Summary of Changes.pdf PDF
Amend_0005_Submittal_Regsiter.pdf PDF
W912PM20R00030004_Conformed.pdf PDF
W912PM20R00030004.pdf PDF
PN86021_0004_Technical Summary of Changes (002).pdf PDF
Amend 0004 - Pictures for Total Design Analysis RB-SCP-NCP-NN.pdf PDF
86021 List of Site Visit Attendees.pdf PDF
Amend 0003 Appendix A Example 3 Past Performance.pdf PDF
Amend 0003 Appendix A Example 1 Past Experience.pdf PDF
W912PM20R00030003.pdf PDF
W912PM20R00030002-Conformed.pdf PDF
W912PM20R00030002.pdf PDF
W912PM20R00030001-Conformed.pdf PDF
W912PM20R00030001.pdf PDF
PN86021_RTA_PLANS_v4of4_unlocked.pdf PDF
PN86021_RTA_PLANS_v1of4_unlocked.pdf PDF
PN86021_RTA_PLANS_v1of4.pdf PDF
PN86021_RTA_PLANS_v2of4.pdf PDF
PN86021_RTA_PLANS_v2of4_unlocked.pdf PDF
W912PM20R0003_SOF_Assessment_and_Selection_Complex.pdf PDF
PN86021_RTA_PLANS_v3of4_unlocked.pdf PDF
86021_Site_Visit_Map.jpg JPG image
PN86021_RTA_SPECS_VOL 02.pdf PDF
PN86021_RTA_PLANS_v3of4.pdf PDF
PN86021_RTA_SPECS_VOL 01.pdf PDF
Show all 50

This notice has more attachments on GovTribe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
SOF Assessment and Selection Training Complex Award Award Notice
SOF Assessment and Selection Training Complex This notice · Latest solicitation Solicitation
SOF Assessment and Selection Training Complex Pre-Solicitation
SOF Assessment and Selection Training Complex Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity