Amend_0005_Submittal_Regsiter.pdf

PDF 571 KB Posted

Attached to
SOF Assessment and Selection Training Complex Federal contract opportunity
Solicitation number
W912PM20R0003
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This federal solicitation is for the construction of a Special Operations Forces Assessment and Selection Training Complex. Key requirements include training space, storage space, locker rooms and showers, building support space, guard houses, security gates, under vehicle surveillance systems, communications, power, water and sewer utilities, an obstacle course with multiple physical training stations, fire alarm/mass notification systems, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities such as site preparation, utilities, lighting, parking, access roads, sidewalks, storm drainage and landscaping are also included. Design and construction must follow DoD principles for high performance and sustainable building and low impact development features. Cybersecurity measures will be applied to control systems per DoD criteria and access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Wilmington.

View the file

Other files for this federal contract opportunity

Other files attached to SOF Assessment and Selection Training Complex, newest first.
File Type Posted
W912PM20R00030008.pdf PDF
W912PM20R00030008_Conformed.pdf PDF
Amend_0007_PN86021_0006_Technical_Summary_of_Changes.pdf PDF
Amend_0007_FY20PN86021-RB-CG103.pdf PDF
Amend_0007_FY20PN86021-RB-CU101.pdf PDF
W912PM20R00030007_Conformed.pdf PDF
Amend_0007_10_28_13_Revised 4-18.pdf PDF
Amend_0007_FY20PN86021-RB-AE409.pdf PDF
Amend_0006_FY20PN86021-SCP-CS402.pdf PDF
Amend_0006_07 13 53_ADDED.pdf PDF
Amend_0006_PN86021_0006_Technical Summary of Changes.pdf PDF
Amend_0006_FY20PN86021-RB-AE603.pdf PDF
Amend_0006_Submittal Register_REVISION.pdf PDF
Amend_0006_PN86021_RTA_SPECS_VOL 02.pdf PDF
Amend_0006_PN86021_RTA_SPECS_VOL 01.pdf PDF
Amend_0006_FY20PN86021-RB-CG103.pdf PDF
Amend_0006_32 92 23_ADDED.pdf PDF
Amend_0006_FY20PN86021-NCP-CI505.pdf PDF
Amend_0006_10 28 13_REVISED.pdf PDF
Amend_0006_FY20PN86021-RB-CU101.pdf PDF
W912PM20R00030006.pdf PDF
Amend_0005_FY20PN86021-RB-ST506.pdf PDF
Amend_0005_PN86021_RTA_SPECS_VOL 01.pdf PDF
Amend_0005_01 45 00.00 10.pdf PDF
Amend_0005_FY20PN86021-RB-SB101.pdf PDF
Amend_0005_FY20PN86021-NN-SC523.pdf PDF
W912PM20R00030005_Conformed.pdf PDF
W912PM20R00030005.pdf PDF
W912PM20R00030004.pdf PDF
PN86021_0004_Technical Summary of Changes (002).pdf PDF
Amend 0004 - Pictures for Total Design Analysis RB-SCP-NCP-NN.pdf PDF
W912PM20R00030004_Conformed.pdf PDF
86021 List of Site Visit Attendees.pdf PDF
Amend 0003 Appendix A Example 3 Past Performance.pdf PDF
Amend 0003 Appendix A Example 1 Past Experience.pdf PDF
W912PM20R00030003.pdf PDF
Amend 0003 TAB A Proposal Cover Sheet.pdf PDF
W912PM20R00030003_Conformed.pdf PDF
W912PM20R00030002-Conformed.pdf PDF
PN86021_RTA_PLANS_v2of4_unlocked.pdf PDF
PN86021_RTA_PLANS_v3of4_unlocked.pdf PDF
86021_Site_Visit_Map.jpg JPG image
PN86021_RTA_SPECS_VOL 02.pdf PDF
PN86021_RTA_PLANS_v3of4.pdf PDF
PN86021_RTA_SPECS_VOL 01.pdf PDF
PN86021_RTA_SPECS_VOL 03.pdf PDF
PN86021_RTA_PLANS_v4of4.pdf PDF
PN86021_RTA_PLANS_v4of4_unlocked.pdf PDF
PN86021_RTA_PLANS_v1of4_unlocked.pdf PDF
PN86021_RTA_PLANS_v1of4.pdf PDF
Show all 50

SOF Assessment and Selection Training Complex has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 56 PAGES

W912HN18D200

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 10 00.10 38 SD-01 Preconstruction Submittals

3.1Attachments

1.13List of Subcontractors

1.12 GProgress Chart

1.13 GQuality Control Plan

1.13Certificate of Insurance

SD-03 Product Data

1.8Work Plan

1.4Progress Schedule

SD-07 Certificates

1.13Completion of Corps CQC

Course

1.13Letter Appointing Superintendent

SD-11 Closeout Submittals

3.1DD Form 1354

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

01 14 00 SD-01 Preconstruction Submittals

1.3 GConstruction Personnel

1.4 GContract Personnel

01 20 00.00 20 SD-01 Preconstruction Submittals

1.3 GEarned Value Report

01 30 00 SD-01 Preconstruction Submittals

1.3 GView Location Map

1.4.4 GProgress Pictures

1.5 GInsurance Coverage

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 30 00 1.7.2 GSuperintendent's Qualifications

1.4.4 GCompletion Pictures

1.4.2 GExisting Site Conditions

01 32 01.00 37 SD-01 Preconstruction Submittals

3.4.1 G ROPreliminary Project Schedule

3.4.2 G ROInitial Project Schedule

3.6.2 G ROPeriodic Schedule Update

01 33 00.00 37 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 33 29.00 37 SD-01 Preconstruction Submittals

1.3 G ROSDD Implementation Plan

3.1Preconstruction Meeting

SD-03 Product Data

1.4Energy-using Equipment

SD-07 Certificates

3.1Pre-Closeout Meeting

SD-11 Closeout Submittals

1.4 G ROSDD Notebook

1.5.1Energy & Sustainability (E&S)

Record Card

3.1Closeout Meeting

01 35 26 SD-01 Preconstruction Submittals

1.8 GAccident Prevention Plan (APP)

SD-06 Test Reports

1.5Monthly Exposure Reports

1.13Notifications and Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 35 26 1.13.2 GAccident Reports

1.13.3LHE Inspection Reports

SD-07 Certificates

1.7.1.4Crane Operators/Riggers

1.8.2.2 GStandard Lift Plan

1.8.2.3 GCritical Lift Plan

1.9Activity Hazard Analysis (AHA)

1.10.1Confined Space Entry Permit

1.10.1Hot Work Permit

1.13.4Certificate of Compliance

01 45 00.00 10 SD-01 Preconstruction Submittals

3.2 GContractor Quality Control (CQC)

Plan

3.4.2 GCQC Manager Qualifications

SD-06 Test Reports

3.9.2Verification Statement

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GProject Manual

3.1.1Written Practices

SD-06 Test Reports

3.1.3Daily Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Steel Truss Plant

2.1Wood Truss Plant

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 45 35 2.1AC472 Accreditation

2.1Steel Joist Institute Membership

2.1Certificate of Compliance

1.5 GSpecial Inspector

SD-11 Closeout Submittals

2.1 GComprehensive Final Report

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

2.2.1 GHaul Road Plan

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.7 GEnvironmental Protection Plan

3.2.1.2 GStormwater Notice of Intent

1.7.9.1 GDirt and Dust Control Plan

1.6.4 GEnvironmental Manager

Qualifications

SD-07 Certificates

1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 57 19 3.2.1.4 GStormwater Pollution Prevention

Plan Compliance Notebook

3.2.1.5 GStormwater Notice of Termination

3.7.3.6 GDisposal Documentation for

Hazardous and Regulated Waste

3.7.2.1Solid Waste Management Report

1.2.7Hazardous Material

01 57 19.00 37 SD-01 Preconstruction Submittals

1.3 G ROIndoor Air Quality (IAQ)

Management Plan

SD-06 Test Reports

1.19.2Air Contamination Testing

SD-11 Closeout Submittals

1.19.2LEED

01 58 00 SD-02 Shop Drawings

1.4.1 GSign Legend Orders

01 74 19.00 37 SD-11 Closeout Submittals

1.6Records

01 78 00.00 37 SD-03 Product Data

1.3.2As-Built Record of Equipment and Materials

1.7.1Warranty Management Plan

1.7.5Warranty Tags

1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

1.5Preventative Maintenance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 78 00.00 37 1.5Condition Monitoring (Predictive

Testing)

1.5Inspection

1.7.1Instructions

SD-10 Operation and Maintenance

Data

1.9 G ROOperation and Maintenance

Manuals

SD-11 Closeout Submittals

1.3.1Record Drawings

1.6 G ROCertification of EPA and USDA

Designated Items

1.11 G ROForm DD1354

1.11 G ROChecklist for Form DD1354

01 78 23 SD-10 Operation and Maintenance

Data

1.3 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.5 GValidation of Training Completion

01 78 24.00 10 SD-01 Preconstruction Submittals

1.5.1Facility Data Project Execution

Plan

SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 78 24.00 10 3.1 GFacility Data Workbook, Design

3.1 GFacility Document Set, Design

SD-10 Operation and Maintenance

Data

3.2 GFacility Data Workbook, Construction Progress

3.2 GFacility Document Set, Construction Progress

SD-11 Closeout Submittals

3.3 GFacility Data Workbook, Construction Final

3.3 GFacility Document Set, Construction Final

01 91 00.15 SD-01 Preconstruction Submittals

1.8 GCommissioning Firm

1.8.1 GLead Commissioning Specialist

1.8.2 GTechnical Commissioning

Specialists

SD-05 Design Data

3.1.2 GDesign Phase Commissioning

Plan

SD-06 Test Reports

3.1.3 GDesign Review Report

3.2.3.1 GInterim Construction Phase

Commissioning Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

01 91 00.15 3.2.3.2 GFinal Construction Phase

Commissioning Plan

3.2.3.1.2 GTemplate Building Envelope

Inspection Checklists

3.2.6.2 GBuilding Envelope Inspection

Checklists

3.2.6.3 GPre-Functional Checklists

1.10Issues Log

3.3 GCommissioning Report

SD-07 Certificates

1.11 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.2.7 GTraining Plan

3.2.7 GTraining Attendance Rosters

3.2.8 GSystems Manual

3.2.9 GMaintenance and Service Life

Plans

SD-11 Closeout Submittals

3.3 SFinal Commissioning Report

03 30 00 SD-01 Preconstruction Submittals

1.6.5 GQuality Control Plan

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-03 Product Data

2.4.8Joint Sealants

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

03 30 00 2.4.7Joint Filler

2.1Materials for Forms

2.4.1Cementitious Materials

1.5Vapor Barrier

2.3.3Concrete Curing Materials

2.5Reinforcement

2.4.5Admixtures

1.6.3.1Pumping Concrete

2.5.3 SRecycled Content for Reinforcing

Bar Support

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Ground Granulated Blast-Furnace

Slag

2.4.3Aggregates

3.14.2.3 GCompressive Strength Tests

3.14.2.5Unit Weight of Structural

Concrete

3.14.2.6Ion Concentration

3.14.2.4Air Content

3.14.2.1Slump Tests

2.4.2Water

SD-07 Certificates

2.5.1Reinforcing Bars

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

03 30 00 1.6.3.2Safety Data Sheets

2.3.3Curing Compound

04 20 00 SD-03 Product Data

2.3.2 GClay or Shale Brick

2.3.3.2.1 GCement

2.5.1.1 GCementitious Materials

SD-05 Design Data

2.2.1 GMasonry Compressive Strength

SD-06 Test Reports

2.3.1Test Reports

3.7.1.1Field Testing Of Mortar

3.7.1.2Field Testing Of Grout

SD-07 Certificates

2.5.1.1Cementitious Materials

2.5.1.4Admixtures for Masonry Mortar

2.5.2.2Admixtures for Grout

2.7.3Anchors, Ties, and Bar

Positioners

2.7.4Joint Reinforcement

05 12 00 SD-02 Shop Drawings

1.4.1 GFabrication Drawings

SD-03 Product Data

2.6.2Shop Primer

2.4.1Welding Electrodes and Rods

2.4.2Non-Shrink Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

05 12 00 2.2.1 SRecycled Content for Structural

Steel

2.2.2 SRecycled Content for Structural

Steel Tubing

2.2.3 SRecycled Content for Steel Pipe

SD-06 Test Reports

2.3Bolts, Nuts, and Washers

3.6.1.2Weld Inspection Reports

3.6.3.1Bolt Testing Reports

3.6.4Embrittlement Test Reports

SD-07 Certificates

2.2Steel

2.3Bolts, Nuts, and Washers

2.5Galvanizing

1.3AISC Structural Steel Fabricator

Quality Certification

1.4.2.1Welding Procedures and

Qualifications

2.4.1Welding Electrodes and Rods

3.6.1.1Certified Welding Inspector

3.6.1.2NDT Technician

3.4Welding Procedure Specifications

(WPS)

05 30 00 SD-03 Product Data

2.2Accessories

2.1Deck Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

05 30 00 2.1.2Galvanizing Repair Paint

2.2.10Mechanical Fasteners

2.1.2Touch-Up Paint

2.1Recycled Content of Steel

Products

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

1.3.2.1Fire Safety

1.3.2.2Wind Storm Resistance

1.3.1Manufacturer's Certificate

05 40 00 SD-02 Shop Drawings

1.6.1 GFraming Components

SD-03 Product Data

2.1Studs, Joists

2.1 SRecycled Content of Steel

Products

SD-07 Certificates

1.4Load-Bearing Cold-Formed Metal

Framing

3.2.1Welds

05 51 00 SD-02 Shop Drawings

2.2.1Metal Stair System

SD-03 Product Data

2.2.2Steel Pan Stairs

2.3.1Steel Stairs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

05 52 00 SD-03 Product Data

2.2.5 GSteel Railings And Handrails

06 13 33 SD-06 Test Reports

1.4.1 GPreservative Treatment

1.4.3 GDelivery Inspection List

SD-07 Certificates

1.4.2 GSDS and CIS

1.4.4 GPesticide Applicator

2.1.5 GWire Rope Strength Certification

07 05 23 SD-01 Preconstruction Submittals

1.4 GWork Plan

SD-03 Product Data

2.2 GThermal Imaging Camera

SD-05 Design Data

3.2 SEnvelope Surface Area

Calculations

SD-07 Certificates

1.6.2.1 SPressure Test Agency

1.6.2.2 SThermographer Qualifications

1.6.3 STest Instruments

1.6.3 SDate Of Last Calibration

07 21 13 SD-03 Product Data

1.3Manufacturer's Standard Details

2.1Block, Board and Insulation

2.1Cover Board

2.4Vapor Retarder

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

07 21 13 2.4Pressure Sensitive Tape

1.4Protection Board or Coatings

2.1.4 SRecycled Content for Block or

Board Insulation

07 27 10.00 10 SD-04 Samples

3.1.2 GMock-Up

SD-06 Test Reports

1.8 GDesign Review Report

3.1.3 GTesting and Inspection

SD-07 Certificates

1.7 GAir Barrier Inspector

07 27 19.01 SD-01 Preconstruction Submittals

1.8.1 GQualifications of Manufacturer

1.8.2 GQualifications of Installer

SD-02 Shop Drawings

1.4 GSelf-adhering Air Barrier

SD-03 Product Data

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4 GSelf-adhering Air Barrier

SD-06 Test Reports

1.6 GField Peel Adhesion Test

1.4.4 GFlame Propagation of Wall

Assemblies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

07 27 19.01 1.4.4 GFlame Spread and Smoke

Developed Index Ratings

3.4.1 GSite Inspections and Testing

SD-07 Certificates

1.4 GSelf-adhering Air Barrier

SD-08 Manufacturer’s Instructions

1.4 GSelf-adhering Air Barrier

2.2 GPrimers, Adhesives, and Mastics

07 27 26 SD-02 Shop Drawings

1.4 GFluid-Applied Membrane Air

Barrier

SD-03 Product Data

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

2.2 GPrimers, Adhesives, and Mastics

2.6 GReinforcement

1.4.2 GSafety Data Sheets

SD-04 Samples

1.4.3 GMockup

SD-06 Test Reports

1.4.4 GField Adhesion Test

SD-08 Manufacturer’s Instructions

1.4 GFluid-Applied Membrane Air

Barrier

2.3 GTransition Membrane

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

07 27 26 2.2 GPrimers, Adhesives, and Mastics

07 60 00 SD-04 Samples

1.4.2Finish Samples

SD-08 Manufacturer’s Instructions

1.4.3Instructions for Installation

SD-10 Operation and Maintenance

Data

1.4.3Cleaning and Maintenance

07 61 14.00 20 SD-02 Shop Drawings

1.4Roofing

SD-03 Product Data

2.2Roofing Panels

2.3Attachment Clips

2.4.1Closures

2.4Accessories

2.4.2Fasteners

2.4.3Sealants

2.3Insulation

1.3 GWarranty

SD-11 Closeout Submittals

2.2.1 SRecycled Content for Steel

Roofing Product

1.3Warranty

07 84 00 SD-03 Product Data

2.2 SFirestopping Materials

07 92 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

07 92 00 2.2 SSealants

2.3 SPrimers

2.4 SBond Breakers

2.5 SBackstops

SD-07 Certificates

2.2.3 SIndoor Air Quality For Interior

Acoustical Sealants

08 11 13 SD-02 Shop Drawings

2.1Doors

2.5Frames

SD-03 Product Data

2.1Doors

2.5Frames

2.3Accessories

08 31 00 SD-02 Shop Drawings

1.3Access Doors And Panels

SD-03 Product Data

1.3 GAccess Doors And Panels

2.1 SRecycled Content

08 51 69.10 SD-02 Shop Drawings

2.1.2Aluminum Windows

SD-03 Product Data

2.1.2 SAluminum Windows

SD-10 Operation and Maintenance

Data

2.1.2 GAluminum Windows

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

08 71 00 SD-02 Shop Drawings

2.3Hardware Items

2.3.6 GKeying System

SD-03 Product Data

2.3Hardware Items

08 91 00 SD-02 Shop Drawings

1.4Wall louvers

SD-03 Product Data

2.2Metal Wall Louvers

09 22 00 SD-03 Product Data

2.1Metal support systems

09 29 00 SD-03 Product Data

2.2.2 SGlass Mat Covered or Reinforced

Gypsum Sheathing

2.2.1Fiberglass Faced Gypsum Board

SD-11 Closeout Submittals

2.1.1Recycled Content for Gypsum

Board

09 51 00 SD-03 Product Data

2.1.1 SAcoustical Ceiling Systems

09 67 23.13 SD-02 Shop Drawings

2.1Installation Drawings

SD-03 Product Data

1.2.1 SManufacturer's Catalog Data

SD-04 Samples

3.1.4Floor Topping

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

09 67 23.13 SD-05 Design Data

1.2.2Design Mix Data

09 90 00 SD-03 Product Data

2.1 SManufacturer's Technical Data

Sheets

SD-04 Samples

1.6 GColor

SD-08 Manufacturer’s Instructions

1.7.2Manufacturer's Safety Data

Sheets

SD-11 Closeout Submittals

1.9.1Local/Regional Materials

1.5.4Materials

10 14 00.20 SD-02 Shop Drawings

1.3.2Detail Drawings

SD-03 Product Data

3.1Installation

SD-04 Samples

1.3.1Interior Signage

10 21 13 SD-03 Product Data

2.1Cleaning and Maintenance

Instructions

2.2.1Stainless Steel Sheet

2.2.2Anchoring Devices and Fasteners

2.2.4Hardware and Fittings

2.2.3Brackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

10 21 13 2.2.5Door Hardware

2.5Pilaster Shoes

SD-11 Closeout Submittals

2.3Recycled content for stainless steel partitions and screens

10 28 13 SD-03 Product Data

2.2 SAccessory Items

SD-11 Closeout Submittals

2.1Recycled content for stainless steel toilet accessories

2.1Recycled Content

10 51 13 SD-03 Product Data

2.2 SMaterial

2.1 SFinish

2.3Components

12 21 00 SD-04 Samples

2.1 GWindow Blinds

SD-07 Certificates

1.4.1Indoor Air Quality

SD-11 Closeout Submittals

2.1Indoor Air Quality for window blinds

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.9As-Built Drawings

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

21 13 13.00 10 1.4.1Fire Protection Related

Submittals

2.3 GMaterials and Equipment

1.6Spare Parts

3.8 GPreliminary Tests

3.9 GFinal Acceptance Test

3.10 GOnsite Training

1.4.1 GFire Protection Specialist

1.4.2 GSprinkler System Installer

SD-05 Design Data

1.4.3 GSway Bracing

1.2.1.3 GHydraulic Calculations

SD-06 Test Reports

3.8Preliminary Test Report

3.9Final Acceptance Test Report

SD-07 Certificates

3.3Inspection by Fire Protection

Specialist

SD-10 Operation and Maintenance

Data

3.10 GOperating and Maintenance

Manuals

22 00 00 SD-03 Product Data

2.4Fixtures

2.4.3Flush valve water closets

2.4.4Flush valve urinals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

22 00 00 2.4.11Countertop lavatories

2.4.14 GDrinking-Water Fountains

SD-06 Test Reports

3.9 GTests, Flushing and Disinfection

SD-07 Certificates

1.3 GMaterials and Equipment

SD-10 Operation and Maintenance

Data

3.9.1Plumbing System

23 00 00 SD-02 Shop Drawings

1.4.4Detail Drawings

SD-03 Product Data

2.8.1.1Insulated Nonmetallic Flexible

Duct Runouts

2.8.1.1Duct Connectors

2.8.2Duct Access Doors

2.8.3Fire Dampers

2.8.4Manual Balancing Dampers

2.8.7.1Diffusers

2.8.7.2Registers and Grilles

2.8.8Louvers

2.9.1.1Centrifugal Fans

2.9.1.2In-Line Centrifugal Fans

2.9.1.3Centrifugal Type Power Wall

Ventilators

2.9.1.4Ceiling Exhaust Fans

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 00 00 2.9.1.4 SEnergy Star label for ceiling exhaust fan product

2.10 GAir Handling Units

2.11.1.1Constant Volume, Single Duct

Terminal Units

2.11.1.2Variable Volume, Single Duct

Terminal Units

2.12Energy Recovery Devices

1.4.5Test Procedures

1.2.1.2Diagrams

2.8.1 SIndoor Air Quality for Duct

Sealants

SD-06 Test Reports

3.11 GPerformance Tests

3.9Damper Acceptance Test

SD-07 Certificates

1.4.1Bolts

1.4.3Ozone Depleting Substances

Technician Certification

SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.13.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 00 00 3.13.1Operation and Maintenance

Manuals

2.8.3Fire Dampers

2.8.4Manual Balancing Dampers

2.9.1.1Centrifugal Fans

2.9.1.2In-Line Centrifugal Fans

2.9.1.3Centrifugal Type Power Wall

Ventilators

2.9.1.4Ceiling Exhaust Fans

2.10Air Handling Units

SD-11 Closeout Submittals

3.12 SIndoor Air Quality During

Construction

23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

SD-03 Product Data

1.2Equipment and Performance

Data

2.1Isolators

SD-06 Test Reports

2.4Type of Isolator

2.4Type of Base

23 05 93 SD-01 Preconstruction Submittals

1.5.3.1 GTAB Firm

1.2TAB Team Assistants

1.2TAB Team Engineer

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 05 93 1.2TAB Team Field Leader

SD-02 Shop Drawings

1.3.2TAB Schematic Drawings and

Report Forms

SD-03 Product Data

1.3Equipment and Performance

Data

1.5.2 GTAB Procedures

1.5.2Calibration

1.3.2 GSystems Readiness Check

1.5.4TAB Execution

SD-06 Test Reports

3.3.6 GCertified Final DALT Report

1.6.1.1 GTAB Design Review Report

1.5.5.2 GTAB Report

SD-07 Certificates

1.5.1Independent TAB Agency and

Personnel Qualifications

1.5.3.1TAB Firm

1.3.2Design Review Report

1.6.1Advanced Notice for TAB Field

Work

23 07 00 SD-02 Shop Drawings

3.2.2.4MICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 07 00 3.3Duct Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

SD-04 Samples

2.2.1.1Thermal Insulation

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

23 09 00 SD-02 Shop Drawings

3.2 GDDC Contractor Design Drawings

3.2Draft As-Built Drawings

3.2 GFinal As-Built Drawings

SD-03 Product Data

1.8.3 GCertificate of Networthiness

Documentation

1.8.1 GProgramming Software

1.8.2 GController Application Programs

GConfiguration Software

2.2 GManufacturer's Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 09 00 SD-06 Test Reports

3.4.2 GStart-Up Testing Report

3.5.1PVT Procedures

3.5.3 GPVT Report

1.9.1Pre-Construction Quality Control

(QC) Checklist

1.9.2Post-Construction Quality Control

(QC) Checklist

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

(O&M) Instructions

3.8.1 GTraining Documentation

SD-11 Closeout Submittals

2.5Enclosure Keys

3.1.6.1Password Summary Report

1.9.3Closeout Quality Control (QC)

Checklist

23 11 25 SD-02 Shop Drawings

1.5.3 GGas Piping System

SD-03 Product Data

1.6.1Pipe and Fittings

1.5.3Gas Equipment Connectors

2.7 GLPG Containers and Accessories

1.5.3Gas Piping System

2.1Pipe Coating Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 11 25 2.6Pressure Regulators

2.4Risers

2.2.8Transition Fittings

2.3Valves

2.2.4 SWarning and Identification Tape

SD-06 Test Reports

3.18 GTesting

3.18.1 GPressure Tests for Liquified

Petroleum Gas

3.18.2Test with Gas

SD-07 Certificates

1.5.1 GWelders Procedures and

Qualifications

SD-08 Manufacturer’s Instructions

1.5.2PE Pipe and Fittings

2.1Pipe Coating Materials

SD-10 Operation and Maintenance

Data

1.3.1Gas Facility System and

Equipment Operation

1.3.2Gas Facility System Maintenance

1.3.3Gas Facility Equipment

Maintenance

23 23 00 SD-02 Shop Drawings

2.3 GRefrigerant Piping System

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 23 00 2.3Refrigerant Piping System

1.5.2Spare Parts

1.3.1Qualifications

3.5Refrigerant Piping Tests

3.1Verification of Dimensions

SD-06 Test Reports

3.5Refrigerant Piping Tests

SD-07 Certificates

2.1Service Organization

SD-10 Operation and Maintenance

Data

1.5Maintenance

3.4Operation and Maintenance

Manuals

23 81 00 SD-03 Product Data

3.7.1Spare Parts

3.4Posted Instructions

2.5.1Coil Corrosion Protection

3.6System Performance Tests

3.4Training

2.1Supplied Products

2.2Manufacturer's Standard Catalog

Data

SD-06 Test Reports

3.5 GRefrigerant Tests, Charging, and

Start-Up

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 81 00 3.6 GSystem Performance Tests

SD-07 Certificates

3.7.2Service Organizations

SD-10 Operation and Maintenance

Data

3.4Operation and Maintenance

Manuals

SD-11 Closeout Submittals

2.2.2.3Ozone Depleting Substances

23 82 16.00 40 SD-02 Shop Drawings

2.1Fabrication Drawings

3.1Installation Drawings

SD-03 Product Data

2.1 GVolatile Refrigerant Cooling

SD-06 Test Reports

3.2Final Test Reports

SD-10 Operation and Maintenance

Data

3.3.1Operation and Maintenance

Manuals

23 82 43.00 40 SD-02 Shop Drawings

1.2.1Installation Drawings

SD-03 Product Data

2.1.1 SPerformance Data

2.1 GDuct Heaters

2.2.1Heating Elements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

23 82 43.00 40 2.2.1Enclosures

2.2.2Controls

SD-08 Manufacturer’s Instructions

1.2.1Manufacturer's Instructions

23 82 46.00 40 SD-03 Product Data

2.1 SPerformance Data

2.1Electric Unit Heaters

2.2.1Heating Element

2.2.2Controls

3.1.1Casings

2.2.3Propellers and Motors

SD-08 Manufacturer’s Instructions

1.2.1Manufacturer's Instructions

25 05 11 SD-01 Preconstruction Submittals

3.1.2.2 GDevice Account Lock Exception

Request

3.7 GMultiple IP Connection Device

Request

1.8.1.4 GContractor Computer

Cybersecurity Compliance

Statements

1.8.6 GContractor Temporary Network

Cybersecurity Compliance

Statements

SD-02 Shop Drawings

3.1.3.1User Interface Banner Schedule

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

25 05 11 1.6.2 GNetwork Communication Report

1.6.5 GCybersecurity Riser Diagram

1.6.3 GControl System Inventory Report

1.6.1 GCybersecurity Interconnection

Schedule

SD-03 Product Data

1.6.6 GControl System Cybersecurity

Documentation

SD-07 Certificates

1.7Software Licenses

SD-11 Closeout Submittals

3.5.2.2.5Password Summary Report

1.6.4Software Recovery And

Reconstitution Images

3.2.2.1Device Audit Record Upload

Software

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1Material, Equipment, and Fixture

Lists

SD-03 Product Data

2.1.1Conduits and Raceways

2.1.3Wire and Cable

3.2.1.9Splices and Connectors

2.1.4Switches

2.1.5Receptacles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 05 00.00 40 2.1.6Outlet Boxes, Pull Boxes and

Junction Boxes

2.1.8Circuit Breakers

2.1.7Panelboards

2.1.9Lamps and Lighting Fixtures

SD-06 Test Reports

3.3Continuity Test

3.3Phase-Rotation Tests

3.3Insulation Resistance Test

SD-08 Manufacturer’s Instructions

3.1Manufacturer's Instructions

26 05 48.00 10 SD-02 Shop Drawings

3.2Lighting Fixtures in Buildings

1.3Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure

26 09 23.00 40 SD-03 Product Data

3.1 GInstallation Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 09 23.00 40 2.2.1 GPhotocell Switch

2.2.2 GOccupancy Sensors

SD-06 Test Reports

3.2System Operation Tests

SD-10 Operation and Maintenance

Data

3.3Lighting Control System, Data

Package 5

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.3 GCable trays

SD-03 Product Data

2.11Receptacles

2.12.3Circuit breakers

2.9Switches

2.15 GMotor controllers

2.16 GManual motor starters

2.24 GMetering

2.19.3 GGrounding Busbar

2.25 GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.4 GGrounding system test

3.5.3 GGround-fault receptacle test

SD-07 Certificates

2.10 GFuses

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 20 00 SD-10 Operation and Maintenance

Data

1.5.1 GElectrical Systems

2.24 GMetering

26 24 13 SD-02 Shop Drawings

1.5.2 GSwitchboard Drawings

SD-03 Product Data

2.2 GSwitchboard

SD-06 Test Reports

2.5.2Switchboard Design Tests

2.5.3Switchboard Production Tests

3.5.1Acceptance Checks and Tests

SD-07 Certificates

2.5.4Cybersecurity Equipment

Certification

3.5.1.7Cybersecurity Installation

Certification

SD-10 Operation and Maintenance

Data

1.6.1 GSwitchboard Operation and

Maintenance

SD-11 Closeout Submittals

1.6.2 GAssembled Operation and

Maintenance Manuals

2.5.1 GEquipment Test Schedule

3.5 GRequest for Settings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 24 13 3.5 GRequired Settings

2.8 GService Entrance Available Fault

Current Label

26 27 13.10 30 SD-03 Product Data

2.1 GPower Meters

2.1.3 GCurrent

2.1.2 GPotential Transformer

2.2.2 GCommunications Module

1.6.1 GProtocol Modules

1.6.2 GData Recorder

1.6.2 GModem

SD-06 Test Reports

3.3.1 GAcceptance Checks and Tests

SD-10 Operation and Maintenance

Data

2.1 GPower Meters

2.2.2 GCommunications Module

1.6.1 GProtocol Modules

1.6.2 GData Recorder

1.6.2 GModem

SD-11 Closeout Submittals

3.3.2 GSystem Function Verification

26 41 00 SD-02 Shop Drawings

1.4.1.1 GOverall lightning protection

system

1.4.1.2Each major component

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 41 00 SD-06 Test Reports

1.4.3 GLightning Protection and

Grounding System Test Plan

3.5.1 GLightning Protection and

Grounding System Test

SD-07 Certificates

1.2.3 GLightning Protection System

Installers Documentation

1.4.2 GComponent UL Listed and

Labeled

1.4.4 GLightning protection system

inspection certificate

3.1.1 GRoof manufacturer's warranty

26 42 14.00 10 SD-02 Shop Drawings

1.3.4 GDrawings

2.1.1 GContractor's Modifications

SD-03 Product Data

2.1 GEquipment

1.5Spare Parts

SD-06 Test Reports

3.5 GTests and Measurements

2.1.1 GContractor's Modifications

SD-07 Certificates

2.1Cathodic Protection System

1.3.1 GServices of 'Corrosion Expert'

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 42 14.00 10 SD-10 Operation and Maintenance

Data

2.1 GCathodic Protection System

3.6 GTraining Course

26 51 00 SD-02 Shop Drawings

1.5.1 GLuminaire Drawings

1.5.2Occupancy/Vacancy Sensor

Coverage Layout

SD-03 Product Data

2.2 GLuminaires

2.4 GLight Sources

2.3Drivers, Ballasts and Generators

1.6.1 GLED Luminaire Warranty

1.5.4Luminaire Design Data

2.5.2.2Vacancy Sensors

2.6.1 GExit Signs

2.6.2 GLED Emergency Drivers

2.5.2.1Occupancy Sensors

2.5.3 GLighting Control Panel

SD-06 Test Reports

1.5.5 GLED Luminaire - IES LM-79 Test

Report

1.5.6 GLED Light Source - IES LM-80

Test Report

1.5.7 GLED Light Source - IES TM-21

Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 51 00 1.5.8 GOccupancy/Vacancy Sensor

Verification Tests

1.5.11.3Energy Efficiency

SD-07 Certificates

1.6.1.1Luminaire Useful Life Certificate

1.5.3LED Driver and Dimming Switch

Compatibility Certificate

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

1.6.1 GLED Luminaire Warranty

SD-02 Shop Drawings

1.5.1.1 GLuminaire Drawings

SD-03 Product Data

2.2 GLED Luminaires

2.2 SEnergy Star Label for LED

Luminaire Product

2.2.2 GLuminaire Light Sources

2.2.3Luminaire Power Supply Units

(Drivers)

2.3.1 GPhotocell

SD-05 Design Data

1.5.3 GDesign Data for Luminaires

SD-06 Test Reports

1.5.4 GLED Luminaire - IES LM-79 Test

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

26 56 00 1.5.5 GLED Light Source - IES LM-80

Test Report

3.2Operating Test

SD-07 Certificates

1.6.1 GLuminaire Useful Life Certificate

SD-10 Operation and Maintenance

Data

1.7Operational Service

27 10 00 SD-02 Shop Drawings

1.6.1.1 GTelecommunications drawings

1.6.1.2 GTelecommunications Space

Drawings

SD-03 Product Data

2.3 GTelecommunications cabling

2.4.6 GPatch panels

2.5 GTelecommunications

outlet/connector assemblies

2.4.2 GEquipment support frame

2.4.4 GConnector blocks

SD-06 Test Reports

3.5.1 GTelecommunications cabling

testing

SD-07 Certificates

1.6.2.1 GTelecommunications Contractor

1.6.2.2 GKey Personnel

1.6.2.3 GManufacturer Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

27 10 00 1.6.3 GTest plan

SD-09 Manufacturer’s Field

Reports

2.12.1 GFactory reel tests

SD-10 Operation and Maintenance

Data

1.10.1 GTelecommunications cabling and

pathway system

SD-11 Closeout Submittals

1.10.2 GRecord Documentation

27 21 00.00 40 SD-02 Shop Drawings

2.1 GIntercommunication System

SD-03 Product Data

2.1.1 GAudio Visual System

2.3.1Cables and Raceways

2.3.2Surge Protection

SD-10 Operation and Maintenance

Data

3.3Operation and Maintenance Data

28 08 10 SD-05 Design Data

3.1 GTest Plan

SD-06 Test Reports

3.2.2Draft Test Report

3.4 GFinal Test Report

SD-07 Certificates

1.4.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 56 PAGES

SOF ASSESSMENT & SELECTION TRAINING COMPLEX

28 10 05 SD-02 Shop Drawings

1.3.3.1 GESS Components

1.3.3.2 GOverall System Single Line

Diagram

1.3.3.1 GNetwork Topology

SD-03 Product Data

2.3.2 GDetection Sensors

2.4.2 GWireless Hand Held Card Reader

2.4.2 GAccess Control Unit

2.1 GTime Server

2.4.2 GPhoto Beam Detectors

2.4.3 GAccess Control Devices

2.3.2.1.2 GGap Sensor

2.4.3.4.3 GLoop Detectors

2.5.1 GCameras

2.5.1.2 GCamera Lenses

2.5.1.3 GCamera Housing and Mounts

2.5.4.3…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .