Amend_0005_Submittal_Regsiter.pdf
PDF 571 KB Posted
- Attached to
- SOF Assessment and Selection Training Complex Federal contract opportunity
- Solicitation number
- W912PM20R0003
About this file
This federal solicitation is for the construction of a Special Operations Forces Assessment and Selection Training Complex. Key requirements include training space, storage space, locker rooms and showers, building support space, guard houses, security gates, under vehicle surveillance systems, communications, power, water and sewer utilities, an obstacle course with multiple physical training stations, fire alarm/mass notification systems, fire suppression, energy management control, telephone, advanced unclassified and classified communications networks, television, electronic access control systems, and a protected distribution system. Supporting facilities such as site preparation, utilities, lighting, parking, access roads, sidewalks, storm drainage and landscaping are also included. Design and construction must follow DoD principles for high performance and sustainable building and low impact development features. Cybersecurity measures will be applied to control systems per DoD criteria and access for persons with disabilities will be provided. Comprehensive interior design and audio visual services are included. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Wilmington.
View the file
Other files for this federal contract opportunity
Show all 50
SOF Assessment and Selection Training Complex has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 56 PAGES
W912HN18D200
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 10 00.10 38 SD-01 Preconstruction Submittals
3.1Attachments
1.13List of Subcontractors
1.12 GProgress Chart
1.13 GQuality Control Plan
1.13Certificate of Insurance
SD-03 Product Data
1.8Work Plan
1.4Progress Schedule
SD-07 Certificates
1.13Completion of Corps CQC
Course
1.13Letter Appointing Superintendent
SD-11 Closeout Submittals
3.1DD Form 1354
01 11 00 SD-01 Preconstruction Submittals
1.6 GSalvage Plan
01 14 00 SD-01 Preconstruction Submittals
1.3 GConstruction Personnel
1.4 GContract Personnel
01 20 00.00 20 SD-01 Preconstruction Submittals
1.3 GEarned Value Report
01 30 00 SD-01 Preconstruction Submittals
1.3 GView Location Map
1.4.4 GProgress Pictures
1.5 GInsurance Coverage
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 30 00 1.7.2 GSuperintendent's Qualifications
1.4.4 GCompletion Pictures
1.4.2 GExisting Site Conditions
01 32 01.00 37 SD-01 Preconstruction Submittals
3.4.1 G ROPreliminary Project Schedule
3.4.2 G ROInitial Project Schedule
3.6.2 G ROPeriodic Schedule Update
01 33 00.00 37 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
01 33 29.00 37 SD-01 Preconstruction Submittals
1.3 G ROSDD Implementation Plan
3.1Preconstruction Meeting
SD-03 Product Data
1.4Energy-using Equipment
SD-07 Certificates
3.1Pre-Closeout Meeting
SD-11 Closeout Submittals
1.4 G ROSDD Notebook
1.5.1Energy & Sustainability (E&S)
Record Card
3.1Closeout Meeting
01 35 26 SD-01 Preconstruction Submittals
1.8 GAccident Prevention Plan (APP)
SD-06 Test Reports
1.5Monthly Exposure Reports
1.13Notifications and Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 35 26 1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
SD-07 Certificates
1.7.1.4Crane Operators/Riggers
1.8.2.2 GStandard Lift Plan
1.8.2.3 GCritical Lift Plan
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan
3.4.2 GCQC Manager Qualifications
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.1 GProject Manual
3.1.1Written Practices
SD-06 Test Reports
3.1.3Daily Reports
3.1.2Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Steel Truss Plant
2.1Wood Truss Plant
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 45 35 2.1AC472 Accreditation
2.1Steel Joist Institute Membership
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
2.1 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-06 Test Reports
2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.7 GEnvironmental Protection Plan
3.2.1.2 GStormwater Notice of Intent
1.7.9.1 GDirt and Dust Control Plan
1.6.4 GEnvironmental Manager
Qualifications
SD-07 Certificates
1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 57 19 3.2.1.4 GStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 GStormwater Notice of Termination
3.7.3.6 GDisposal Documentation for
Hazardous and Regulated Waste
3.7.2.1Solid Waste Management Report
1.2.7Hazardous Material
01 57 19.00 37 SD-01 Preconstruction Submittals
1.3 G ROIndoor Air Quality (IAQ)
Management Plan
SD-06 Test Reports
1.19.2Air Contamination Testing
SD-11 Closeout Submittals
1.19.2LEED
01 58 00 SD-02 Shop Drawings
1.4.1 GSign Legend Orders
01 74 19.00 37 SD-11 Closeout Submittals
1.6Records
01 78 00.00 37 SD-03 Product Data
1.3.2As-Built Record of Equipment and Materials
1.7.1Warranty Management Plan
1.7.5Warranty Tags
1.4Spare Parts Data
SD-08 Manufacturer’s Instructions
1.5Preventative Maintenance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 78 00.00 37 1.5Condition Monitoring (Predictive
Testing)
1.5Inspection
1.7.1Instructions
SD-10 Operation and Maintenance
Data
1.9 G ROOperation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.1Record Drawings
1.6 G ROCertification of EPA and USDA
Designated Items
1.11 G ROForm DD1354
1.11 G ROChecklist for Form DD1354
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.5 GValidation of Training Completion
01 78 24.00 10 SD-01 Preconstruction Submittals
1.5.1Facility Data Project Execution
Plan
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 78 24.00 10 3.1 GFacility Data Workbook, Design
3.1 GFacility Document Set, Design
SD-10 Operation and Maintenance
Data
3.2 GFacility Data Workbook, Construction Progress
3.2 GFacility Document Set, Construction Progress
SD-11 Closeout Submittals
3.3 GFacility Data Workbook, Construction Final
3.3 GFacility Document Set, Construction Final
01 91 00.15 SD-01 Preconstruction Submittals
1.8 GCommissioning Firm
1.8.1 GLead Commissioning Specialist
1.8.2 GTechnical Commissioning
Specialists
SD-05 Design Data
3.1.2 GDesign Phase Commissioning
Plan
SD-06 Test Reports
3.1.3 GDesign Review Report
3.2.3.1 GInterim Construction Phase
Commissioning Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
01 91 00.15 3.2.3.2 GFinal Construction Phase
Commissioning Plan
3.2.3.1.2 GTemplate Building Envelope
Inspection Checklists
3.2.6.2 GBuilding Envelope Inspection
Checklists
3.2.6.3 GPre-Functional Checklists
1.10Issues Log
3.3 GCommissioning Report
SD-07 Certificates
1.11 GCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.2.7 GTraining Plan
3.2.7 GTraining Attendance Rosters
3.2.8 GSystems Manual
3.2.9 GMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.3 SFinal Commissioning Report
03 30 00 SD-01 Preconstruction Submittals
1.6.5 GQuality Control Plan
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.4.8Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
03 30 00 2.4.7Joint Filler
2.1Materials for Forms
2.4.1Cementitious Materials
1.5Vapor Barrier
2.3.3Concrete Curing Materials
2.5Reinforcement
2.4.5Admixtures
1.6.3.1Pumping Concrete
2.5.3 SRecycled Content for Reinforcing
Bar Support
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Ground Granulated Blast-Furnace
Slag
2.4.3Aggregates
3.14.2.3 GCompressive Strength Tests
3.14.2.5Unit Weight of Structural
Concrete
3.14.2.6Ion Concentration
3.14.2.4Air Content
3.14.2.1Slump Tests
2.4.2Water
SD-07 Certificates
2.5.1Reinforcing Bars
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
03 30 00 1.6.3.2Safety Data Sheets
2.3.3Curing Compound
04 20 00 SD-03 Product Data
2.3.2 GClay or Shale Brick
2.3.3.2.1 GCement
2.5.1.1 GCementitious Materials
SD-05 Design Data
2.2.1 GMasonry Compressive Strength
SD-06 Test Reports
2.3.1Test Reports
3.7.1.1Field Testing Of Mortar
3.7.1.2Field Testing Of Grout
SD-07 Certificates
2.5.1.1Cementitious Materials
2.5.1.4Admixtures for Masonry Mortar
2.5.2.2Admixtures for Grout
2.7.3Anchors, Ties, and Bar
Positioners
2.7.4Joint Reinforcement
05 12 00 SD-02 Shop Drawings
1.4.1 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.4.2Non-Shrink Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
05 12 00 2.2.1 SRecycled Content for Structural
Steel
2.2.2 SRecycled Content for Structural
Steel Tubing
2.2.3 SRecycled Content for Steel Pipe
SD-06 Test Reports
2.3Bolts, Nuts, and Washers
3.6.1.2Weld Inspection Reports
3.6.3.1Bolt Testing Reports
3.6.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.3AISC Structural Steel Fabricator
Quality Certification
1.4.2.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.6.1.1Certified Welding Inspector
3.6.1.2NDT Technician
3.4Welding Procedure Specifications
(WPS)
05 30 00 SD-03 Product Data
2.2Accessories
2.1Deck Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
05 30 00 2.1.2Galvanizing Repair Paint
2.2.10Mechanical Fasteners
2.1.2Touch-Up Paint
2.1Recycled Content of Steel
Products
SD-05 Design Data
2.1 GDeck Units
SD-07 Certificates
1.3.2.1Fire Safety
1.3.2.2Wind Storm Resistance
1.3.1Manufacturer's Certificate
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.2.1Welds
05 51 00 SD-02 Shop Drawings
2.2.1Metal Stair System
SD-03 Product Data
2.2.2Steel Pan Stairs
2.3.1Steel Stairs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
05 52 00 SD-03 Product Data
2.2.5 GSteel Railings And Handrails
06 13 33 SD-06 Test Reports
1.4.1 GPreservative Treatment
1.4.3 GDelivery Inspection List
SD-07 Certificates
1.4.2 GSDS and CIS
1.4.4 GPesticide Applicator
2.1.5 GWire Rope Strength Certification
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 SEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1 SPressure Test Agency
1.6.2.2 SThermographer Qualifications
1.6.3 STest Instruments
1.6.3 SDate Of Last Calibration
07 21 13 SD-03 Product Data
1.3Manufacturer's Standard Details
2.1Block, Board and Insulation
2.1Cover Board
2.4Vapor Retarder
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
07 21 13 2.4Pressure Sensitive Tape
1.4Protection Board or Coatings
2.1.4 SRecycled Content for Block or
Board Insulation
07 27 10.00 10 SD-04 Samples
3.1.2 GMock-Up
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.8.1 GQualifications of Manufacturer
1.8.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4 GSelf-adhering Air Barrier
SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
07 27 19.01 1.4.4 GFlame Spread and Smoke
Developed Index Ratings
3.4.1 GSite Inspections and Testing
SD-07 Certificates
1.4 GSelf-adhering Air Barrier
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
07 27 26 SD-02 Shop Drawings
1.4 GFluid-Applied Membrane Air
Barrier
SD-03 Product Data
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
2.2 GPrimers, Adhesives, and Mastics
2.6 GReinforcement
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4.3 GMockup
SD-06 Test Reports
1.4.4 GField Adhesion Test
SD-08 Manufacturer’s Instructions
1.4 GFluid-Applied Membrane Air
Barrier
2.3 GTransition Membrane
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
07 27 26 2.2 GPrimers, Adhesives, and Mastics
07 60 00 SD-04 Samples
1.4.2Finish Samples
SD-08 Manufacturer’s Instructions
1.4.3Instructions for Installation
SD-10 Operation and Maintenance
Data
1.4.3Cleaning and Maintenance
07 61 14.00 20 SD-02 Shop Drawings
1.4Roofing
SD-03 Product Data
2.2Roofing Panels
2.3Attachment Clips
2.4.1Closures
2.4Accessories
2.4.2Fasteners
2.4.3Sealants
2.3Insulation
1.3 GWarranty
SD-11 Closeout Submittals
2.2.1 SRecycled Content for Steel
Roofing Product
1.3Warranty
07 84 00 SD-03 Product Data
2.2 SFirestopping Materials
07 92 00 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
07 92 00 2.2 SSealants
2.3 SPrimers
2.4 SBond Breakers
2.5 SBackstops
SD-07 Certificates
2.2.3 SIndoor Air Quality For Interior
Acoustical Sealants
08 11 13 SD-02 Shop Drawings
2.1Doors
2.5Frames
SD-03 Product Data
2.1Doors
2.5Frames
2.3Accessories
08 31 00 SD-02 Shop Drawings
1.3Access Doors And Panels
SD-03 Product Data
1.3 GAccess Doors And Panels
2.1 SRecycled Content
08 51 69.10 SD-02 Shop Drawings
2.1.2Aluminum Windows
SD-03 Product Data
2.1.2 SAluminum Windows
SD-10 Operation and Maintenance
Data
2.1.2 GAluminum Windows
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
08 71 00 SD-02 Shop Drawings
2.3Hardware Items
2.3.6 GKeying System
SD-03 Product Data
2.3Hardware Items
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
09 22 00 SD-03 Product Data
2.1Metal support systems
09 29 00 SD-03 Product Data
2.2.2 SGlass Mat Covered or Reinforced
Gypsum Sheathing
2.2.1Fiberglass Faced Gypsum Board
SD-11 Closeout Submittals
2.1.1Recycled Content for Gypsum
Board
09 51 00 SD-03 Product Data
2.1.1 SAcoustical Ceiling Systems
09 67 23.13 SD-02 Shop Drawings
2.1Installation Drawings
SD-03 Product Data
1.2.1 SManufacturer's Catalog Data
SD-04 Samples
3.1.4Floor Topping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
09 67 23.13 SD-05 Design Data
1.2.2Design Mix Data
09 90 00 SD-03 Product Data
2.1 SManufacturer's Technical Data
Sheets
SD-04 Samples
1.6 GColor
SD-08 Manufacturer’s Instructions
1.7.2Manufacturer's Safety Data
Sheets
SD-11 Closeout Submittals
1.9.1Local/Regional Materials
1.5.4Materials
10 14 00.20 SD-02 Shop Drawings
1.3.2Detail Drawings
SD-03 Product Data
3.1Installation
SD-04 Samples
1.3.1Interior Signage
10 21 13 SD-03 Product Data
2.1Cleaning and Maintenance
Instructions
2.2.1Stainless Steel Sheet
2.2.2Anchoring Devices and Fasteners
2.2.4Hardware and Fittings
2.2.3Brackets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
10 21 13 2.2.5Door Hardware
2.5Pilaster Shoes
SD-11 Closeout Submittals
2.3Recycled content for stainless steel partitions and screens
10 28 13 SD-03 Product Data
2.2 SAccessory Items
SD-11 Closeout Submittals
2.1Recycled content for stainless steel toilet accessories
2.1Recycled Content
10 51 13 SD-03 Product Data
2.2 SMaterial
2.1 SFinish
2.3Components
12 21 00 SD-04 Samples
2.1 GWindow Blinds
SD-07 Certificates
1.4.1Indoor Air Quality
SD-11 Closeout Submittals
2.1Indoor Air Quality for window blinds
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.9As-Built Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
21 13 13.00 10 1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.8 GPreliminary Tests
3.9 GFinal Acceptance Test
3.10 GOnsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
1.4.3 GSway Bracing
1.2.1.3 GHydraulic Calculations
SD-06 Test Reports
3.8Preliminary Test Report
3.9Final Acceptance Test Report
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10 GOperating and Maintenance
Manuals
22 00 00 SD-03 Product Data
2.4Fixtures
2.4.3Flush valve water closets
2.4.4Flush valve urinals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
22 00 00 2.4.11Countertop lavatories
2.4.14 GDrinking-Water Fountains
SD-06 Test Reports
3.9 GTests, Flushing and Disinfection
SD-07 Certificates
1.3 GMaterials and Equipment
SD-10 Operation and Maintenance
Data
3.9.1Plumbing System
23 00 00 SD-02 Shop Drawings
1.4.4Detail Drawings
SD-03 Product Data
2.8.1.1Insulated Nonmetallic Flexible
Duct Runouts
2.8.1.1Duct Connectors
2.8.2Duct Access Doors
2.8.3Fire Dampers
2.8.4Manual Balancing Dampers
2.8.7.1Diffusers
2.8.7.2Registers and Grilles
2.8.8Louvers
2.9.1.1Centrifugal Fans
2.9.1.2In-Line Centrifugal Fans
2.9.1.3Centrifugal Type Power Wall
Ventilators
2.9.1.4Ceiling Exhaust Fans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 00 00 2.9.1.4 SEnergy Star label for ceiling exhaust fan product
2.10 GAir Handling Units
2.11.1.1Constant Volume, Single Duct
Terminal Units
2.11.1.2Variable Volume, Single Duct
Terminal Units
2.12Energy Recovery Devices
1.4.5Test Procedures
1.2.1.2Diagrams
2.8.1 SIndoor Air Quality for Duct
Sealants
SD-06 Test Reports
3.11 GPerformance Tests
3.9Damper Acceptance Test
SD-07 Certificates
1.4.1Bolts
1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.13.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 00 00 3.13.1Operation and Maintenance
Manuals
2.8.3Fire Dampers
2.8.4Manual Balancing Dampers
2.9.1.1Centrifugal Fans
2.9.1.2In-Line Centrifugal Fans
2.9.1.3Centrifugal Type Power Wall
Ventilators
2.9.1.4Ceiling Exhaust Fans
2.10Air Handling Units
SD-11 Closeout Submittals
3.12 SIndoor Air Quality During
Construction
23 05 48.00 40 SD-02 Shop Drawings
1.2 GInstallation Drawings
SD-03 Product Data
1.2Equipment and Performance
Data
2.1Isolators
SD-06 Test Reports
2.4Type of Isolator
2.4Type of Base
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 GTAB Firm
1.2TAB Team Assistants
1.2TAB Team Engineer
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 05 93 1.2TAB Team Field Leader
SD-02 Shop Drawings
1.3.2TAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3Equipment and Performance
Data
1.5.2 GTAB Procedures
1.5.2Calibration
1.3.2 GSystems Readiness Check
1.5.4TAB Execution
SD-06 Test Reports
3.3.6 GCertified Final DALT Report
1.6.1.1 GTAB Design Review Report
1.5.5.2 GTAB Report
SD-07 Certificates
1.5.1Independent TAB Agency and
Personnel Qualifications
1.5.3.1TAB Firm
1.3.2Design Review Report
1.6.1Advanced Notice for TAB Field
Work
23 07 00 SD-02 Shop Drawings
3.2.2.4MICA Plates
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 07 00 3.3Duct Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-04 Samples
2.2.1.1Thermal Insulation
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2Draft As-Built Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
1.8.3 GCertificate of Networthiness
Documentation
1.8.1 GProgramming Software
1.8.2 GController Application Programs
GConfiguration Software
2.2 GManufacturer's Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 09 00 SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1PVT Procedures
3.5.3 GPVT Report
1.9.1Pre-Construction Quality Control
(QC) Checklist
1.9.2Post-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.6 GOperation and Maintenance
(O&M) Instructions
3.8.1 GTraining Documentation
SD-11 Closeout Submittals
2.5Enclosure Keys
3.1.6.1Password Summary Report
1.9.3Closeout Quality Control (QC)
Checklist
23 11 25 SD-02 Shop Drawings
1.5.3 GGas Piping System
SD-03 Product Data
1.6.1Pipe and Fittings
1.5.3Gas Equipment Connectors
2.7 GLPG Containers and Accessories
1.5.3Gas Piping System
2.1Pipe Coating Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 11 25 2.6Pressure Regulators
2.4Risers
2.2.8Transition Fittings
2.3Valves
2.2.4 SWarning and Identification Tape
SD-06 Test Reports
3.18 GTesting
3.18.1 GPressure Tests for Liquified
Petroleum Gas
3.18.2Test with Gas
SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
SD-08 Manufacturer’s Instructions
1.5.2PE Pipe and Fittings
2.1Pipe Coating Materials
SD-10 Operation and Maintenance
Data
1.3.1Gas Facility System and
Equipment Operation
1.3.2Gas Facility System Maintenance
1.3.3Gas Facility Equipment
Maintenance
23 23 00 SD-02 Shop Drawings
2.3 GRefrigerant Piping System
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 23 00 2.3Refrigerant Piping System
1.5.2Spare Parts
1.3.1Qualifications
3.5Refrigerant Piping Tests
3.1Verification of Dimensions
SD-06 Test Reports
3.5Refrigerant Piping Tests
SD-07 Certificates
2.1Service Organization
SD-10 Operation and Maintenance
Data
1.5Maintenance
3.4Operation and Maintenance
Manuals
23 81 00 SD-03 Product Data
3.7.1Spare Parts
3.4Posted Instructions
2.5.1Coil Corrosion Protection
3.6System Performance Tests
3.4Training
2.1Supplied Products
2.2Manufacturer's Standard Catalog
Data
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 81 00 3.6 GSystem Performance Tests
SD-07 Certificates
3.7.2Service Organizations
SD-10 Operation and Maintenance
Data
3.4Operation and Maintenance
Manuals
SD-11 Closeout Submittals
2.2.2.3Ozone Depleting Substances
23 82 16.00 40 SD-02 Shop Drawings
2.1Fabrication Drawings
3.1Installation Drawings
SD-03 Product Data
2.1 GVolatile Refrigerant Cooling
SD-06 Test Reports
3.2Final Test Reports
SD-10 Operation and Maintenance
Data
3.3.1Operation and Maintenance
Manuals
23 82 43.00 40 SD-02 Shop Drawings
1.2.1Installation Drawings
SD-03 Product Data
2.1.1 SPerformance Data
2.1 GDuct Heaters
2.2.1Heating Elements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
23 82 43.00 40 2.2.1Enclosures
2.2.2Controls
SD-08 Manufacturer’s Instructions
1.2.1Manufacturer's Instructions
23 82 46.00 40 SD-03 Product Data
2.1 SPerformance Data
2.1Electric Unit Heaters
2.2.1Heating Element
2.2.2Controls
3.1.1Casings
2.2.3Propellers and Motors
SD-08 Manufacturer’s Instructions
1.2.1Manufacturer's Instructions
25 05 11 SD-01 Preconstruction Submittals
3.1.2.2 GDevice Account Lock Exception
Request
3.7 GMultiple IP Connection Device
Request
1.8.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.8.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
SD-02 Shop Drawings
3.1.3.1User Interface Banner Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
25 05 11 1.6.2 GNetwork Communication Report
1.6.5 GCybersecurity Riser Diagram
1.6.3 GControl System Inventory Report
1.6.1 GCybersecurity Interconnection
Schedule
SD-03 Product Data
1.6.6 GControl System Cybersecurity
Documentation
SD-07 Certificates
1.7Software Licenses
SD-11 Closeout Submittals
3.5.2.2.5Password Summary Report
1.6.4Software Recovery And
Reconstitution Images
3.2.2.1Device Audit Record Upload
Software
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1Material, Equipment, and Fixture
Lists
SD-03 Product Data
2.1.1Conduits and Raceways
2.1.3Wire and Cable
3.2.1.9Splices and Connectors
2.1.4Switches
2.1.5Receptacles
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 05 00.00 40 2.1.6Outlet Boxes, Pull Boxes and
Junction Boxes
2.1.8Circuit Breakers
2.1.7Panelboards
2.1.9Lamps and Lighting Fixtures
SD-06 Test Reports
3.3Continuity Test
3.3Phase-Rotation Tests
3.3Insulation Resistance Test
SD-08 Manufacturer’s Instructions
3.1Manufacturer's Instructions
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 09 23.00 40 SD-03 Product Data
3.1 GInstallation Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 09 23.00 40 2.2.1 GPhotocell Switch
2.2.2 GOccupancy Sensors
SD-06 Test Reports
3.2System Operation Tests
SD-10 Operation and Maintenance
Data
3.3Lighting Control System, Data
Package 5
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.3 GCable trays
SD-03 Product Data
2.11Receptacles
2.12.3Circuit breakers
2.9Switches
2.15 GMotor controllers
2.16 GManual motor starters
2.24 GMetering
2.19.3 GGrounding Busbar
2.25 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.4 GGrounding system test
3.5.3 GGround-fault receptacle test
SD-07 Certificates
2.10 GFuses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 20 00 SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
2.24 GMetering
26 24 13 SD-02 Shop Drawings
1.5.2 GSwitchboard Drawings
SD-03 Product Data
2.2 GSwitchboard
SD-06 Test Reports
2.5.2Switchboard Design Tests
2.5.3Switchboard Production Tests
3.5.1Acceptance Checks and Tests
SD-07 Certificates
2.5.4Cybersecurity Equipment
Certification
3.5.1.7Cybersecurity Installation
Certification
SD-10 Operation and Maintenance
Data
1.6.1 GSwitchboard Operation and
Maintenance
SD-11 Closeout Submittals
1.6.2 GAssembled Operation and
Maintenance Manuals
2.5.1 GEquipment Test Schedule
3.5 GRequest for Settings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 24 13 3.5 GRequired Settings
2.8 GService Entrance Available Fault
Current Label
26 27 13.10 30 SD-03 Product Data
2.1 GPower Meters
2.1.3 GCurrent
2.1.2 GPotential Transformer
2.2.2 GCommunications Module
1.6.1 GProtocol Modules
1.6.2 GData Recorder
1.6.2 GModem
SD-06 Test Reports
3.3.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance
Data
2.1 GPower Meters
2.2.2 GCommunications Module
1.6.1 GProtocol Modules
1.6.2 GData Recorder
1.6.2 GModem
SD-11 Closeout Submittals
3.3.2 GSystem Function Verification
26 41 00 SD-02 Shop Drawings
1.4.1.1 GOverall lightning protection
system
1.4.1.2Each major component
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 41 00 SD-06 Test Reports
1.4.3 GLightning Protection and
Grounding System Test Plan
3.5.1 GLightning Protection and
Grounding System Test
SD-07 Certificates
1.2.3 GLightning Protection System
Installers Documentation
1.4.2 GComponent UL Listed and
Labeled
1.4.4 GLightning protection system
inspection certificate
3.1.1 GRoof manufacturer's warranty
26 42 14.00 10 SD-02 Shop Drawings
1.3.4 GDrawings
2.1.1 GContractor's Modifications
SD-03 Product Data
2.1 GEquipment
1.5Spare Parts
SD-06 Test Reports
3.5 GTests and Measurements
2.1.1 GContractor's Modifications
SD-07 Certificates
2.1Cathodic Protection System
1.3.1 GServices of 'Corrosion Expert'
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 42 14.00 10 SD-10 Operation and Maintenance
Data
2.1 GCathodic Protection System
3.6 GTraining Course
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
1.5.2Occupancy/Vacancy Sensor
Coverage Layout
SD-03 Product Data
2.2 GLuminaires
2.4 GLight Sources
2.3Drivers, Ballasts and Generators
1.6.1 GLED Luminaire Warranty
1.5.4Luminaire Design Data
2.5.2.2Vacancy Sensors
2.6.1 GExit Signs
2.6.2 GLED Emergency Drivers
2.5.2.1Occupancy Sensors
2.5.3 GLighting Control Panel
SD-06 Test Reports
1.5.5 GLED Luminaire - IES LM-79 Test
Report
1.5.6 GLED Light Source - IES LM-80
Test Report
1.5.7 GLED Light Source - IES TM-21
Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 51 00 1.5.8 GOccupancy/Vacancy Sensor
Verification Tests
1.5.11.3Energy Efficiency
SD-07 Certificates
1.6.1.1Luminaire Useful Life Certificate
1.5.3LED Driver and Dimming Switch
Compatibility Certificate
26 56 00 SD-01 Preconstruction Submittals
1.5.2 GPhotometric Plan
1.6.1 GLED Luminaire Warranty
SD-02 Shop Drawings
1.5.1.1 GLuminaire Drawings
SD-03 Product Data
2.2 GLED Luminaires
2.2 SEnergy Star Label for LED
Luminaire Product
2.2.2 GLuminaire Light Sources
2.2.3Luminaire Power Supply Units
(Drivers)
2.3.1 GPhotocell
SD-05 Design Data
1.5.3 GDesign Data for Luminaires
SD-06 Test Reports
1.5.4 GLED Luminaire - IES LM-79 Test
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
26 56 00 1.5.5 GLED Light Source - IES LM-80
Test Report
3.2Operating Test
SD-07 Certificates
1.6.1 GLuminaire Useful Life Certificate
SD-10 Operation and Maintenance
Data
1.7Operational Service
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings
SD-03 Product Data
2.3 GTelecommunications cabling
2.4.6 GPatch panels
2.5 GTelecommunications
outlet/connector assemblies
2.4.2 GEquipment support frame
2.4.4 GConnector blocks
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
27 10 00 1.6.3 GTest plan
SD-09 Manufacturer’s Field
Reports
2.12.1 GFactory reel tests
SD-10 Operation and Maintenance
Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
27 21 00.00 40 SD-02 Shop Drawings
2.1 GIntercommunication System
SD-03 Product Data
2.1.1 GAudio Visual System
2.3.1Cables and Raceways
2.3.2Surge Protection
SD-10 Operation and Maintenance
Data
3.3Operation and Maintenance Data
28 08 10 SD-05 Design Data
3.1 GTest Plan
SD-06 Test Reports
3.2.2Draft Test Report
3.4 GFinal Test Report
SD-07 Certificates
1.4.1Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 56 PAGES
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
28 10 05 SD-02 Shop Drawings
1.3.3.1 GESS Components
1.3.3.2 GOverall System Single Line
Diagram
1.3.3.1 GNetwork Topology
SD-03 Product Data
2.3.2 GDetection Sensors
2.4.2 GWireless Hand Held Card Reader
2.4.2 GAccess Control Unit
2.1 GTime Server
2.4.2 GPhoto Beam Detectors
2.4.3 GAccess Control Devices
2.3.2.1.2 GGap Sensor
2.4.3.4.3 GLoop Detectors
2.5.1 GCameras
2.5.1.2 GCamera Lenses
2.5.1.3 GCamera Housing and Mounts
2.5.4.3…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .