W912PM20R00030003.pdf
PDF 29 KB Posted
- Attached to
- SOF Assessment and Selection Training Complex Federal contract opportunity
- Solicitation number
- W912PM20R0003
About this file
This document provides details for a federal solicitation to construct a Special Operations Forces Assessment and Selection Training Complex. The solicitation seeks to build new training space, storage space, locker rooms and showers, and building support space. Additional facilities will include pre-engineered guard houses, security gates, under vehicle surveillance systems, and supporting utilities. An obstacle course is required with multiple physical training stations along a circuit route. Built-in systems for fire alarm/mass notification, fire suppression, energy management control, telephone networks, advanced communications, television, electronic access control, and a protected distribution system must be incorporated. Supporting site work involves preparation, electrical, water, sanitary sewer, natural gas, chilled water and information systems, lighting, vehicle parking, access drives and roads, sidewalks, storm drainage, landscaping and other improvements. Design and construction must follow DoD high performance and sustainable building requirements and federal laws/executive orders. The solicitation number is W912PM20R0003 issued by the Department of the Army Corps of Engineers Engineering District Wilmington.
View the file
Other files for this federal contract opportunity
Show all 50
SOF Assessment and Selection Training Complex has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PN 86021
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to incorporate the follow ing attachments into the Table of Contents:
1) Appendix A, Example 1 Past Experience
2) Appendix A, Example 3 Past Performance
3) Tab A Proposal Cover Sheet
All other provisions of this solicitation remain unchanged.
////////////////////////////////////////////////////////////////LAST ITEM///////////////////////////////////////////////////////////////
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Mar-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM20R0003
X 9B. DATED (SEE ITEM 11)
28-Feb-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Mar-2020
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM20R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 10 - TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 86021_Site_Visit_Map.jp g
24-FEB-2020
Attachment 10 PN86021_RTA_PLANS_ v3of4_unlocked.pdf
27-FEB-2020
Attachment 11 PN86021_RTS_PLANS_ v4of4.pdf
27-FEB-2020
Attachment 12 PN86021_RTA_PLANS_ v4of4_unlocked
27-FEB-2020
Attachment 2 PN86021_RTA_SPECS_
VOL_1.pdf
27-FEB-2020
Attachment 3 PN86021_RTA_SPECS_
VOL_2.pdf
27-FEB-2020
Attachment 4 PN86021_RTA_SPECS_
VOL_3.pdf
27-FEB-2020
Attachment 5 PN86021_RTA_PLANS_ v1_of_4.pdf
27-FEB-2020
Attachment 6 PN86021_RTA_PLANS_ v1of4_unlocked.pdf
27-FEB-2020
Attachment 7 PN86021_RTA_PLANS_ v2of4.pdf
27-FEB-2020
Attachment 8 PN86021_RTA_PLANS_ v2of4_unlocked.pdf
27-FEB-2020
Attachment 9 PN86021_RTA_PLANS_ v3of4.pdf
27-FEB-2020
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 86021_Site_Visit_Map.jp g
24-FEB-2020
Attachment 10 PN86021_RTA_PLANS_ v3of4_unlocked.pdf
27-FEB-2020
Attachment 11 PN86021_RTS_PLANS_ v4of4.pdf
27-FEB-2020
Attachment 12 PN86021_RTA_PLANS_ v4of4_unlocked
27-FEB-2020
Attachment 13 Tab A Proposal Cover
Sheet
12-MAR-2020
W912PM20R0003
Attachment 14 Appendix A, Example 3
Past Performance
12-MAR-2020
Attachment 15 Appendix A, Example 1
Past Experience
12-MAR-2020
Attachment 2 PN86021_RTA_SPECS_
VOL_1.pdf
27-FEB-2020
Attachment 3 PN86021_RTA_SPECS_
VOL_2.pdf
27-FEB-2020
Attachment 4 PN86021_RTA_SPECS_
VOL_3.pdf
27-FEB-2020
Attachment 5 PN86021_RTA_PLANS_ v1_of_4.pdf
27-FEB-2020
Attachment 6 PN86021_RTA_PLANS_ v1of4_unlocked.pdf
27-FEB-2020
Attachment 7 PN86021_RTA_PLANS_ v2of4.pdf
27-FEB-2020
Attachment 8 PN86021_RTA_PLANS_ v2of4_unlocked.pdf
27-FEB-2020
Attachment 9 PN86021_RTA_PLANS_ v3of4.pdf
27-FEB-2020
(End of Summary of Changes)