Amend_0006_FY20PN86021-RB-CU101.pdf
PDF 1 MB Posted
- Attached to
- SOF Assessment and Selection Training Complex
- Solicitation number
- W912PM20R0003
About this file
This document consists of plans and specifications for a proposed construction project at Camp Mackall in North Carolina. The project involves construction of new training and storage facilities, including training space, locker rooms, guard houses, security gates, an obstacle course, and supporting utilities. Built systems will include fire protection, energy management, communications networks, security systems, and a protected distribution system. The project will implement sustainable design and cybersecurity requirements. The solicitation number for this opportunity is W912PM20R0003 and was issued by the U.S. Army Corps of Engineers for the SOF Assessment and Selection Training Complex. The estimated value is over $10 million.
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
S
S
S
S
S
S
CO
CO
CO
W
G
F
F
F
M
B
F
P
M
B
F
P
PROPOSED CONSTRUCTION
TRAILER & PARKING AREA
U
E
U
E
U
C
U
C
U
C
U
C
X
P
I
V
P
I
V
TIE-IN #4
SD #4
TIE-IN #3
TIE-IN #2
SD #3
SD #2
SD #1
SD #5
SD TIE IN
TIE-IN #8
TIE-IN #7
TIE-IN #6
TIE-IN #5
TIE-IN #1
GRATE INLET
TOP: 346.10
GRATE INLET
TOP: 342.27
EXISTING READY
BUILDING T-4334
FFE = 344.50
EXISTING
COMPANY
ADMINISTRATION
FACILITY T-4034
FFE = 344.50
GRATE INLET
TOP: 342.27
GRATE INLET
TOP: 342.37
GRATE INLET
TOP: 342.39
GRATE INLET
TOP: 342.26
GRATE INLET
TOP: 342.75
GRATE INLET
TOP: 343.16
GRATE INLET
TOP: 342.81
GRATE INLET
TOP: 342.52
GRATE INLET
TOP: 343.06
GRATE INLET
TOP: 342.95
PROPOSED
READY BUILDING
FFE = 344.70
NEW 4" DOMESTIC WATER CONNECTION
WITH GATE VALVE (BY ASUS)
NEW 1" GASLINE CONNECTION. REFER
TO MECHANICAL/PLUMBING SHEETS.
NEW 6" SANITARY SEWER
CONNECTION. REFER TO
PLUMBING SHEETS.
AMERICAN STATES UTILITY SERVICES
(ASUS) TO PROVIDE SEWER MAIN SERVICES
UP TO BUILDING WITH CLEANOUT WITH A
MINIMUM OF 5' OR A POINT OF
DEMARCATION AS SPECIFIED BY ASUS.
CONTRACTOR SHALL COORDINATE WITH
DPW REGARDING GAS TIE-IN LOCATION.
ALIGNMENT ONLY SHOWN FOR
PRELIMINARY LAYOUT PURPOSES. GAS LINE
SHALL BE METERED. METER LOCATION
SHALL BE COORDINATED WITH DPW.
NEW CLEANOUT, TYP. BY ASUS
NEW 6" FIRE WATER LINE
WITH GATE VALVE. REFER
TO FIRE PROTECTION
SHEETS
AMERICAN STATES UTILITY SERVICES
(ASUS) TO PROVIDE WATER MAIN SERVICES
UP TO BUILDING WITH METER, RPZ
BACKFLOW PREVENTER, AND POST
INDICATOR VALVE. THE CONTRACTOR
SHALL INSTALL PIPING UP TO A MINIMUM OF
5' OR A POINT OF DEMARCATION AS
SPECIFIED BY ASUS.
NEW BOLLARDS TO BE
PLACED TO PROTECT
NEW UTILITIES, TYP. SEE
DETAIL 1, SHEET CI503
FIRE WATER BFP (BY ASUS)
WILL HAVE TAMPER SWITCH.
NEW 6" SANITARY SEWER
CONNECTION. REFER TO
PLUMBING SHEETS.
PROVIDE 1
" SCHEDULE 40 LP GAS SUPPLY
WITH LP GAS RATED SHUT OFF VALVE AND
ADUSTABLE VALVE BOX RATED FOR HEAVY
TRAFFIC WITHIN 5' OF TIE-IN POINT. VALVE
BOX SHALL BE LABELED "GAS" ON COVER AND
BE INSTALLED FLUSH WITH EXISTING GRADE.
METAL LOCATING TAPE SHALL BE PROVIDED
AT A MAXIMUM OF 30" BELOW FINISH GRADE.
NEW TRANSFORMERS.
REFER TO ELECTRICAL
SHEETS. ELECTRICAL
CONNECTION AND
ALIGNMENT BY SANDHILL
UTILITY SERVICES.
NEW UNDERGROUND POWER LINE.
REFER TO ELECTRICAL SHEETS.
TIE IN TO EXISTING
SECURITY CONDUIT
CURRENTLY CAPPED FOR
FUTURE USE.
NEW UNDERGROUND
CONDUIT WITH TAMPER
SWITCHES AND HOT BOX
CONNECTION. SEE SHEET
ES101 FOR DETAILED
POWER TELECOMM AND
SECURITY INFORMATION.
INSTALL WIND SCREEN FABRIC
PANELS BETWEEN EXISTING
BOLLARDS. SEE DETAIL #2 ON
THIS SHEET.
(12)
" YARD HYDRANTS SUPPLIED
WITH 1-1/2" C.W. PROVIDE (6)
BOLLARDS (FIRST FLOOR ONLY)
(12)
" YARD HYDRANTS
SUPPLIED WITH 1-1/2" C.W.
PROVIDE (6) BOLLARDS
(FIRST FLOOR ONLY)
RPZ AND ISOLATION VALVES WITHIN
AN INSULATED VALVE BOX .
R E
A D
Y
B
U I L D
I N
G
C O
M P
O S
I T
E
U
T I L I T
I E
S
P
L A
N
CU101
H E
M
L R
H E
M
SCALE: 1" = 40'
COMPOSITE UTILITIES PLAN
GENERAL NOTES
1. REFER TO PLUMBING/MECHANICAL SHEETS FOR INTERIOR
CONNECTION INFORMATION.
2. ALL NEW UTILITY CROSSINGS TO HAVE A MINIMUM OF 18"
SEPARATION DISTANCE BETWEEN EACH OTHER AND ANY
EXISTING UTILITIES.
3. UNDERGROUND ELECTRIC LINE LOCATION HAS NOT BEEN FIELD
LOCATED AND IS UNKNOWN. CONTRACTOR SHOULD TAKE ALL
SAFETY PRECAUTIONS WHEN EXCAVATING FOR UTILITIES ON
THIS SITE.
4. ELECTRICAL CONNECTION INFORMATION COMPILED FROM
CURRENT SURVEY INFORMATION AND AS BUILT DRAWINGS BY
CAPE FEAR ENGINEERING DATED MAY 20, 2015.
5. WALK OFF GRATE SHALL, AT MINIMUM, COVER THE ENTIRE DOOR
WIDTH. WALK OFF GRATE DRAIN LINES ARE TO BE 6 IN. PVC AT 1%
MINIMUM SLOPE.
6. COORDINATE NEW COMMUNICATION, ELECTRICAL, SECURITY,
SEWER, AND WATER LINES TO ENSURE THAT THERE IS NO
CONFLICT BETWEEN LOCATION OF THESE NEW LINES WITH THE
WALK OFF GRATES AND THEIR ASSOCIATED DRAIN LINES.
TRUE
NORTH
A
S O
L I C
I T
A T
I O
N
N
O
F I L E
N
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
C T
A N
S I
D
F
E B
R U
A R
Y
W H
N R
C A
T E
G O
R Y
D
E
Z A
P A
T A
Z A
P A
I
C O
R P
O R
A T
E D
F
A I R
V I E
W
R
O A
D
S
U I T
E
C H
A R
L O
T T
E
N
C
6 7 8 9 10
B
C
D
E
F
G
C A
M P
M
C
K A
L L
N
O R
H
R
O L I N
A
S O
F
A
S S
E S
S M
E N
T
A
D
L E
C T
I O
N
T
R A
I N
I N
G
C
O M
P L E
X
P N
F
Y
RTA SUBMITTAL
RB
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
W I L M
I N
G T
S
T R
I C
T
D
A R
L I N
G T
V E
W I L M
I N
G T
O N
N
C
F Y
P
N R
B C
U
D
W G
KEY PLAN
GRAPHIC SCALE
1" = 40'
40'0 80'20'
NOTE
WIND SCREEN FABRIC PANELS (1 OF 4)
SHALL SPAN BETWEEN EXISTING BOLLARDS.
A NEW 2x2 ANGLE WITH THREE SLOTTED
OPENINGS SHALL BE WELDED TO EACH
BOLLARD AS SHOWN. FABRIC PANEL WITH
THREE INTEGRAL GROMMETS (ON EACH
END OF PANEL) SHALL BE ATTACHED TO
SLOTTED OPENINGS WITH ZIP-TIES.
EXISTING BOLLARD HEIGHTS AND THE
DISTANCE BETWEEN BOLLARDS SHALL BE
FIELD VERIFIED PRIOR TO FABRICATION OF
WIND SCREEN FABRIC PANELS AND
COMPONENTS.
NOT TO SCALE
WIND SCREEN DETAIL
EXISTING STEEL
BOLLARD (1 OF 4)
WELDED ANGLE
2" X 2" X
" TO BOLLARD
INTEGRAL METAL GROMMET
(1 OF 6 PER WIND SCREEN PANEL)
1/2" X 1 1/2" SLOT (TYP)
A D
D E
D
W
A
K
G
R A
T E
S
W
I T
H
A
S S
O C
I A
T E
D
D
R A
N
T
E S
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
DUMPSTER ENCLOSURE
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
ETR
AutoCAD SHX Text
EB
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
1X2FT E-BOX
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
CONNEX TRAILER STORAGE
AutoCAD SHX Text
CONNEX TRAILER STORAGE
AutoCAD SHX Text
CONNEX TRAILER STORAGE
AutoCAD SHX Text
CONNEX TRAILER STORAGE
AutoCAD SHX Text
EXISTING DETENTION POND
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
EB
AutoCAD SHX Text
EM
AutoCAD SHX Text
EM
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
EB
AutoCAD SHX Text
TENT
AutoCAD SHX Text
TENT
AutoCAD SHX Text
TENT
AutoCAD SHX Text
TENT
AutoCAD SHX Text
CONX STOR.
AutoCAD SHX Text
CONX STOR.
AutoCAD SHX Text
EXISTING COVERED SHELTER
AutoCAD SHX Text
CONX STOR.
AutoCAD SHX Text
TENT
AutoCAD SHX Text
TWO STORY BRICK& BLOCK BUILDING
AutoCAD SHX Text
TWO STORY BRICK& BLOCK BUILDING
AutoCAD SHX Text
EXISTING WALL
AutoCAD SHX Text
WALL
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
EXISTING CLOTHES LINES
AutoCAD SHX Text
DIRT DRIVE
AutoCAD SHX Text
SPECIAL FORCES WAY (ASPHALT PAVING)
AutoCAD SHX Text
A-TEAM ROAD (ASPHALT PAVING)
AutoCAD SHX Text
SPECIAL FORCES WAY (ASPHALT PAVING)
AutoCAD SHX Text
A-TEAM ROAD (GRAVEL PAVING)
AutoCAD SHX Text
US
AutoCAD SHX Text
US
AutoCAD SHX Text
US
AutoCAD SHX Text
US
AutoCAD SHX Text
US
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text
SPECIAL FORCES WAY
AutoCAD SHX Text
A-TEAM RD
AutoCAD SHX Text
SPECIAL FORCES WAY
AutoCAD SHX Text
11TH ABN DIV RD
AutoCAD SHX Text
A-TEAM RD
AutoCAD SHX Text
SPECIAL FORCES WAY
AutoCAD SHX Text
SPECIAL FORCES WAY
AutoCAD SHX Text
SPECIAL FORCES WAY
| Sheets and Views |
| Layout 1 |
File details come from the government source that posted it. Updated .