Amend_0006_Submittal Register_REVISION.pdf
PDF 32 KB Posted
- Attached to
- SOF Assessment and Selection Training Complex Federal contract opportunity
- Solicitation number
- W912PM20R0003
About this file
This submittal register outlines the submission requirements for a federal contract to construct a Special Operations Forces Assessment and Selection Training Complex. Key deliverables include product data, shop drawings, samples, material certifications, test reports, and closeout documentation for various construction elements. Product data must be provided for elastomeric waterproofing sheet material, stainless steel toilet accessories, and fertilizer. Topsoil composition tests and sod certifications are also required. The contractor must submit this documentation to the approving authority according to the schedule and obtain approval before procurement or installation of these items. This contract is awarded by the Department of the Army Corps of Engineers Engineering District Wilmington for the purpose of developing training space, storage space, locker rooms and showers, building support space, security facilities, training obstacles, and supporting site infrastructure for a new Special Operations Forces training complex.
View the file
Other files for this federal contract opportunity
Show all 50
SOF Assessment and Selection Training Complex has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
W912HN18D200
SOF ASSESSMENT & SELECTION TRAINING COMPLEX
07 13 53 SD-03 Product Data
1.3Manufacturer's Standard Details
2.1Elastomeric Waterproofing Sheet
Material
10 28 13 SD-03 Product Data
2.2 SAccessory Items
SD-11 Closeout Submittals
2.1Recycled content for stainless steel toilet accessories
2.1Recycled Content
32 92 23 SD-03 Product Data
2.4Fertilizer
SD-06 Test Reports
2.2.3Topsoil composition tests
SD-07 Certificates
2.1sods
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
File details come from the government source that posted it. Updated .