About this file

This document outlines the requirements for a federal construction contract solicitation to build a Special Operations Forces Assessment and Selection Training Complex at Camp Mackall in North Carolina. The project consists of new training facilities, storage and support spaces, security infrastructure including guard houses, gates and under vehicle surveillance, as well as associated utilities, site work, communications and information technology systems. Supporting facilities include site preparation, roadwork, parking, storm drainage and landscaping. The contract will require adherence to high performance and sustainable building standards in accordance with federal laws and executive orders. Access for persons with disabilities and comprehensive interior design and audiovisual services are also included. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Wilmington.

View the file

Other files for this federal contract opportunity

Other files attached to SOF Assessment and Selection Training Complex, newest first.
File Type Posted
W912PM20R00030008.pdf PDF
W912PM20R00030008_Conformed.pdf PDF
Amend_0007_PN86021_0006_Technical_Summary_of_Changes.pdf PDF
Amend_0007_FY20PN86021-RB-CG103.pdf PDF
Amend_0007_FY20PN86021-RB-CU101.pdf PDF
Amend_0007_PN86021_RTA_SPECS_VOL_02.pdf PDF
W912PM20R00030007.pdf PDF
Amend_0007_10_28_13_Revised 4-18.pdf PDF
Amend_0007_FY20PN86021-RB-AE409.pdf PDF
Amend_0006_FY20PN86021-SCP-CS402.pdf PDF
Amend_0006_07 13 53_ADDED.pdf PDF
Amend_0006_PN86021_0006_Technical Summary of Changes.pdf PDF
Amend_0006_FY20PN86021-AE102.pdf PDF
Amend_0006_FY20PN86021-RB-AE301.pdf PDF
Amend_0006_FY20PN86021-NCP-CS402.pdf PDF
W912PM20R00030006_Conformed.pdf PDF
Amend_0006_32 92 23_ADDED.pdf PDF
Amend_0006_FY20PN86021-NCP-CI505.pdf PDF
Amend_0006_10 28 13_REVISED.pdf PDF
Amend_0006_FY20PN86021-RB-CU101.pdf PDF
W912PM20R00030006.pdf PDF
PN86021_0005_Technical Summary of Changes.pdf PDF
Amend_0005_Submittal_Regsiter.pdf PDF
Amend_0005_FY20PN86021-NN-SC523.pdf PDF
W912PM20R00030005_Conformed.pdf PDF
W912PM20R00030005.pdf PDF
W912PM20R00030004.pdf PDF
PN86021_0004_Technical Summary of Changes (002).pdf PDF
Amend 0004 - Pictures for Total Design Analysis RB-SCP-NCP-NN.pdf PDF
W912PM20R00030004_Conformed.pdf PDF
86021 List of Site Visit Attendees.pdf PDF
Amend 0003 Appendix A Example 3 Past Performance.pdf PDF
Amend 0003 Appendix A Example 1 Past Experience.pdf PDF
W912PM20R00030003.pdf PDF
W912PM20R00030002.pdf PDF
W912PM20R00030002-Conformed.pdf PDF
W912PM20R00030001-Conformed.pdf PDF
W912PM20R00030001.pdf PDF
PN86021_RTA_PLANS_v2of4_unlocked.pdf PDF
W912PM20R0003_SOF_Assessment_and_Selection_Complex.pdf PDF
PN86021_RTA_PLANS_v4of4_unlocked.pdf PDF
PN86021_RTA_PLANS_v1of4_unlocked.pdf PDF
PN86021_RTA_PLANS_v1of4.pdf PDF
PN86021_RTA_PLANS_v2of4.pdf PDF
PN86021_RTA_PLANS_v3of4_unlocked.pdf PDF
86021_Site_Visit_Map.jpg JPG image
PN86021_RTA_SPECS_VOL 02.pdf PDF
PN86021_RTA_PLANS_v3of4.pdf PDF
PN86021_RTA_SPECS_VOL 01.pdf PDF
PN86021_RTA_SPECS_VOL 03.pdf PDF
Show all 50

SOF Assessment and Selection Training Complex has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOF ASSESSMENT AND SELECTION TRAINING COMPLEX PN 86021 FY20

CAMP MACKALL, NC NORTH CAROLINA

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00.00 20 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 37 PROJECT SCHEDULE

01 33 00.00 37 SUBMITTAL PROCEDURES

01 33 29.00 37 SUSTAINABILITY

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.00 37 INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19.00 37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00.00 37 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 FACILITY DATA REQUIREMENTS

01 91 00.15 TOTAL BUILDING COMMISSIONING

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 13 33 TIMBERWORK

06 64 00 GLASS FIBER REINFORCED PLASTIC PANELING

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 21 13 INSULATION

PROJECT TABLE OF CONTENTS Page 1

(REVISED BY AMENDMENT)

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 31 00 ACCESS DOORS AND PANELS

08 51 69.10 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 51 00 ACOUSTICAL CEILINGS

09 67 23.13 STANDARD RESINOUS FLOORING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 51 13 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 23 FABRICATED STRUCTURES

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

PROJECT TABLE OF CONTENTS Page 2

23 23 00 REFRIGERANT PIPING

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

23 82 16.00 40 AIR COILS

23 82 43.00 40 ELECTRIC DUCT HEATERS

23 82 46.00 40 ELECTRIC UNIT HEATERS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 09 23.00 40 LIGHTING CONTROL DEVICES

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 24 13 SWITCHBOARDS

26 27 13.10 30 ELECTRIC METERS

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

26 56 00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 21 00.00 40 INTERCOMMUNICATION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING

28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 05 21 GEOGRID SOIL REINFORCEMENT

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 05 23.13 UTILITY HORIZONTAL DIRECTIONAL DRILLING

33 40 00 STORM DRAINAGE UTILITIES

PROJECT TABLE OF CONTENTS Page 3

33 51 15 LIQUID PETROLEUM GAS DISTRIBUTION

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

DIVISION 34 - TRANSPORTATION

34 41 26.16 UNDER VEHICLE SURVEILLANCE AND LICENSE PLATE ANALYTICS

SYSTEM

34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS

-- End of Project Table of Contents --