The Bureau of Reclamation seeks design-build qualifications for yard piping and flow measurement upgrades at the Brackish Groundwater National Desalination Research Facility in Alamogordo, New Mexico, with Phase One qualifications due November 18, 2026, at 4:00 PM MST. The procurement is a Total Small Business set-aside run as a two-phase selection under FAR Subpart 36.3, in which a maximum of three most highly qualified firms advance to Phase Two. UCB-Contracting Activity in Salt Lake City, Utah is the contracting office, and Contracting Officer Kimberley Hervat (kimberley_hervat@ios.doi.gov) receives submissions. Amendment 0005, issued November 17, 2026, reaffirms the November 18 deadline.
The contract is firm fixed-price, with a performance period of January 8, 2027 through January 7, 2028 and work beginning within 21 calendar days of notice to proceed. Liquidated damages are $1,616.08 per calendar day of delay. The prime must self-perform at least 15 percent of the work, and non-similarly situated subcontracted work may not exceed 85 percent. Scope includes a TP10 flow measurement vault with three magnetic flow meters, new manifolds, a CW vault, full SCADA integration, and commissioning, plus an optional replacement of 50 to 500 feet of damaged SWST2 pipeline. Work hours are 7:30 a.m. to 4:30 p.m., Monday through Friday, unless the Contracting Officer's Representative approves otherwise. The NAICS code is 237110 with a $45.0 million size standard, and the PSC is C1NE. Required bonding and insurance include a minimum $500,000 general liability policy. Existing site plans, as-built drawings, and SCADA diagrams will not be released until Phase Two.
Phase One evaluates general technical approach, technical qualifications (evidence of up to three similar projects completed within eight years), project team and key personnel (resumes limited to four pages each), and past performance. Qualifications must address federal and state design-build experience, heavy civil construction, electrical and SCADA systems, and environmental permitting. The three short-listed firms will be evaluated in Phase Two on design concept, technical approach, teaming agreements, and a price proposal submitted as Attachment 12. Technical factors are weighted equally, and all non-price factors combined are significantly more important than price.
Notice text
6 versions
Update #6 · Latest ·
BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY YARD PIPING AND FLOW MEASUREMENT UPGRADES - Amendment 00005 is to provide additional information regarding Amendment 4.
Update #5 ·
BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY YARD PIPING AND FLOW MEASUREMENT UPGRADES - Amendment 00004 is to change the Contract Specialist and Contracting Officer.
Update #4 ·
BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY YARD PIPING AND FLOW MEASUREMENT UPGRADES - Amendment 00003 is to clarify solicitation Questions and Answers and extend the Phase One due date.
Update #3 ·
BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY YARD PIPING AND FLOW MEASUREMENT UPGRADES - Amendment 00002 is to provide solicitation Questions and Answers and extend the Phase One due date.
Update #2 ·
BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY YARD PIPING AND FLOW MEASUREMENT UPGRADES - Amendment 00001 is to provide a solicitation Question and Answer.
Update #1 ·
BRACKISH GROUNDWATER NATIONAL DESALINATION RESEARCH FACILITY YARD PIPING AND FLOW MEASUREMENT UPGRADES
Files
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Bgndrf yard piping & flow measurement upgrades | Pre-Solicitation | |
| Bgndrf yard piping and flow measurement upgrades | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Bgndrf custodial services | — | Total Small Business | |
| NGWSP Cutter Lateral Reach 21 Booster Plant | Bureau of Reclamation | Total Small Business | |
| Turnout Buildings | — | No set-aside | |
| FWS - Pixley NWR Water Recirculation Design-Build | — | Total Small Business | |
| Brine pipeline access improvements | ENDIST Los Angeles | Total Small Business |