Repair live fire training facility aircraft mock-up

Closed Solicitation Posted

Solicitation number
FA665626R0006
Agency
Responses due
Set-aside
Woman-Owned Small Business

Opportunity facts

Place of performance
Vienna, Ohio 44473, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Reserve Command seeks repair and corrective work to the Aircraft Fire Training Facility aircraft mock-up at Youngstown Air Reserve Station, with proposals due September 25, 2026, at 10:00 AM EST. This is a Women-Owned Small Business set-aside under NAICS 236220, Commercial and Institutional Building Construction.

Place of performance is Vienna, Ohio (3976 King Graves Road). The contractor must furnish all labor, supervision, materials, equipment, tools, transportation, testing, quality control, and services to complete work identified in the Statement of Work and technical documentation. Scope includes troubleshooting and repair or replacement of four burner systems (Wheel Well, Flight Deck, Cargo Area, and Pax Area) and associated ignition systems; removal of the Tail Engine Burner per Technical Order; replacement of a malfunctioning cargo-area sprinkler head; repair or replacement of the warped R2 door and warped cargo-area grating; structural steel repairs and corrosion remediation; installation of emergency energy shutoff capability at the propane storage area; installation of required solenoid valves in the LPG/propane distribution system; correction of legacy pneumatic shutoff valve deficiencies; and control-system repairs and upgrades. All contractor personnel must obtain favorable Criminal Background History checks through the National Crime Information Center and DBIDS cards prior to site access; a mandatory site visit is scheduled for September 9, 2026.

The contractor must comply with USAF Technical Order 35E1-2-13-1, NFPA 54, NFPA 58, NFPA 70, NFPA 1003, and NFPA 1402. Performance period is 90 calendar days from the Notice to Proceed. Estimated contract value is between $250,000 and $500,000 with a firm fixed-price structure. Davis-Bacon prevailing wage rates apply per Wage Determination OH20260101. Performance and payment bonds at 100 percent are required within 10 calendar days of award. The Government intends to award based on lowest evaluated price among technically acceptable proposals without negotiations.

Notice text

2 versions

Update #2 · Latest ·

Amendment 0003-SOW/Specification Change

The 910th Airlift Wing requires repair and corrective work to the Aircraft Fire Training Facility (AFTF) aircraft mock-up located at Youngstown Air Reserve Station.

An inspection and evaluation of the Aircraft Fire Training Facility was conducted in August 2025 and finalized in April 2026. The assessment identified deficiencies affecting the facility's burner and ignition systems, structural components, corrosion protection, sprinkler system, propane distribution and emergency shutoff systems, control systems, and associated components.

The contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, testing, quality control, and other items and services necessary to complete the work identified in the Statement of Work, drawings, specifications, and solicitation attachments.

  • Troubleshooting, repair, and/or replacement of the Tail Engine Burner, Wheel Well Burner, Flight Deck Burner, and Cargo Area Burner and associated ignition systems.
  • Repair or replacement of burner ignition components as required to restore proper operation.
  • Replacement of the malfunctioning cargo-area sprinkler head and restoration of proper drainage functionality.
  • Structural steel repairs and corrosion remediation beneath portions of the aircraft mock-up.
  • Corrosion repair beneath flight-deck stairs and around door assemblies.
  • Repair and/or replacement of the warped R2 door and warped grating near the cargo-fire area.
  • Certified welding and associated aircraft mock-up repairs.
  • Installation/restoration of an emergency energy shutoff capability at the propane storage area.
  • Installation of required solenoid valve(s) in the LPG/propane distribution system.
  • Correction of deficiencies involving legacy pneumatic shutoff valves.
  • Required control-system repairs/upgrades.
  • Associated maintenance, testing, and corrective actions necessary to provide a complete and functional system.

Applicable standards identified in the Government's technical documentation include, as applicable:

  • USAF Technical Order 35E1-2-13-1
  • NFPA 54
  • NFPA 58
  • NFPA 70
  • NFPA 1003
  • NFPA 1402
Update #1 ·

The 910th Airlift Wing requires repair and corrective work to the Aircraft Fire Training Facility (AFTF) aircraft mock-up located at Youngstown Air Reserve Station.

An inspection and evaluation of the Aircraft Fire Training Facility was conducted in August 2025 and finalized in April 2026. The assessment identified deficiencies affecting the facility's burner and ignition systems, structural components, corrosion protection, sprinkler system, propane distribution and emergency shutoff systems, control systems, and associated components.

The contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, testing, quality control, and other items and services necessary to complete the work identified in the Statement of Work, drawings, specifications, and solicitation attachments.

  • Troubleshooting, repair, and/or replacement of the Tail Engine Burner, Wheel Well Burner, Flight Deck Burner, and Cargo Area Burner and associated ignition systems.
  • Repair or replacement of burner ignition components as required to restore proper operation.
  • Replacement of the malfunctioning cargo-area sprinkler head and restoration of proper drainage functionality.
  • Structural steel repairs and corrosion remediation beneath portions of the aircraft mock-up.
  • Corrosion repair beneath flight-deck stairs and around door assemblies.
  • Repair and/or replacement of the warped R2 door and warped grating near the cargo-fire area.
  • Certified welding and associated aircraft mock-up repairs.
  • Installation/restoration of an emergency energy shutoff capability at the propane storage area.
  • Installation of required solenoid valve(s) in the LPG/propane distribution system.
  • Correction of deficiencies involving legacy pneumatic shutoff valves.
  • Required control-system repairs/upgrades.
  • Associated maintenance, testing, and corrective actions necessary to provide a complete and functional system.

Applicable standards identified in the Government's technical documentation include, as applicable:

  • USAF Technical Order 35E1-2-13-1
  • NFPA 54
  • NFPA 58
  • NFPA 70
  • NFPA 1003
  • NFPA 1402

Files

Show all 16

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Repair live fire training facility aircraft mock-up Pre-Solicitation
Renovate B203 for C130 J Conversion Original Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WWYK250063 - install react VII facility, B9001, post V19 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Woman-Owned Small Business
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221 Tinker AFB, Oklahoma 73145, United States · NAICS 236220 Air Force Sustainment Center Total Small Business
Repair Naval Reserve Training Facility B3370 Charleston AFB, South Carolina 29404, United States · NAICS 236220 Air Mobility Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity