Providencia Island Solar Power Plant Project

Closed Solicitation Posted

Solicitation number
72051423R00004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Colombia

Notice details come from SAM.gov. Updated .

About this opportunity

The US Agency for International Development Colombia seeks to procure a battery-based electrical energy storage system to serve as the primary energy source for Providencia Island, Colombia. The solicitation requires the system to have a minimum 2.5 megawatt-hour capacity connected to a substation adjacent to a 1.8 megawatt solar power plant, support interoperability of energy sources, reduce load oscillation, provide frequency regulation, and ensure resilience. Proposals are due by May 12, 2023 and will be evaluated based on price and technical acceptability.

No set-aside is designated for this opportunity. The NAICS code is 334110 and PSC code is J-7. The estimated value is $1.5-2.5 million to be awarded as a firm fixed-price commercial item contract. The battery energy storage system must supply 1.8 megawatts of the island's peak demand for one hour and integrate with Providencia Island's existing 3.15 megawatt diesel generator infrastructure located in Providencia, Colombia as part of the Providencia Island Solar Power Plant Project.

Notice text

3 versions

Update #3 · Latest ·

The purpose of amendment 04 is to incorporate a newly required FAR clause into the solicitation as indicated within. No other changes have been made.

===================================================================================================

The purpose of this amendment is to modify the closing date of the solicitation and incorporate the changes from the Q+A. Please see the attached documents for complete information on these changes. 

===================================================================================================

The Providencia Island Solar Power Plant Project will serve to manufacture or procure the battery-based electrical energy storage system that will provide the primary source of energy for Providencia Island, Colombia. This system will be connected to a sub-station adjacent to a solar power station to allow optimization in the integration of several interconnected generation sources, support for the interoperability of energy sources, load oscillation reduction, primary frequency regulation, and resilience for emergency conditions. This procurement will include the following components: cells; modules; battery racks with their respective protection elements; inverters; battery management system; control, monitoring, protection, and communication systems; auxiliary services for batteries; and Supervisory control and data acquisition (SCADA) system for the integration of the battery energy storage system (BESS) to the island’s hybrid system.

The Contractor will participate in the development of a project on the island of Providencia, belonging to the Archipelago of San Andrés, Providencia and Santa Catalina, an overseas department of Colombia, located in the Caribbean Sea. This project consists of the construction of a 1.8 MWp solar power plant, a battery energy storage system (BESS) and a power management system (PMS) to incorporate and manage the island's existing electrical system, which has two 1400 kilowatts (kW) and one 750 kW generator set. The Photovoltaic solar system (SSFV in Spanish) and the Providencia Island Solar Power Plant Project will be located on the same premises, which will be located in the south of the island as shown in the attached solicitation.

The Providencia Island Solar Power Plant Project will have a delivery capacity to Providencia's electric system of 2.5 megawatt hour (MWh) and a minimum delivery duration of one (1) hour, connected to a substation adjacent to the battery system, which will allow the optimization in the integration of the various generation sources (diesel plants, solar plants, solar roofs, battery system). The Providencia Island Solar Power Plant Project will support the interoperability of energy sources, reduction of load oscillation, primary frequency regulation, and resilience for emergency conditions. The system will supply the island's peak demand up to 1.8 megawatt
(MW) for one hour, black start, and continuous voltage regulation according to the operating range for 13.2 kilovolt (kV) grids.

Update #2 ·

The purpose of this amendment is to modify the closing date of the solicitation and incorporate the changes from the Q+A. Please see the attached documents for complete information on these changes. 

===================================================================================================

The Providencia Island Solar Power Plant Project will serve to manufacture or procure the battery-based electrical energy storage system that will provide the primary source of energy for Providencia Island, Colombia. This system will be connected to a sub-station adjacent to a solar power station to allow optimization in the integration of several interconnected generation sources, support for the interoperability of energy sources, load oscillation reduction, primary frequency regulation, and resilience for emergency conditions. This procurement will include the following components: cells; modules; battery racks with their respective protection elements; inverters; battery management system; control, monitoring, protection, and communication systems; auxiliary services for batteries; and Supervisory control and data acquisition (SCADA) system for the integration of the battery energy storage system (BESS) to the island’s hybrid system.

The Contractor will participate in the development of a project on the island of Providencia, belonging to the Archipelago of San Andrés, Providencia and Santa Catalina, an overseas department of Colombia, located in the Caribbean Sea. This project consists of the construction of a 1.8 MWp solar power plant, a battery energy storage system (BESS) and a power management system (PMS) to incorporate and manage the island's existing electrical system, which has two 1400 kilowatts (kW) and one 750 kW generator set. The Photovoltaic solar system (SSFV in Spanish) and the Providencia Island Solar Power Plant Project will be located on the same premises, which will be located in the south of the island as shown in the attached solicitation.

The Providencia Island Solar Power Plant Project will have a delivery capacity to Providencia's electric system of 2.5 megawatt hour (MWh) and a minimum delivery duration of one (1) hour, connected to a substation adjacent to the battery system, which will allow the optimization in the integration of the various generation sources (diesel plants, solar plants, solar roofs, battery system). The Providencia Island Solar Power Plant Project will support the interoperability of energy sources, reduction of load oscillation, primary frequency regulation, and resilience for emergency conditions. The system will supply the island's peak demand up to 1.8 megawatt
(MW) for one hour, black start, and continuous voltage regulation according to the operating range for 13.2 kilovolt (kV) grids.

Update #1 ·

The Providencia Island Solar Power Plant Project will serve to manufacture or procure the battery-based electrical energy storage system that will provide the primary source of energy for Providencia Island, Colombia. This system will be connected to a sub-station adjacent to a solar power station to allow optimization in the integration of several interconnected generation sources, support for the interoperability of energy sources, load oscillation reduction, primary frequency regulation, and resilience for emergency conditions. This procurement will include the following components: cells; modules; battery racks with their respective protection elements; inverters; battery management system; control, monitoring, protection, and communication systems; auxiliary services for batteries; and Supervisory control and data acquisition (SCADA) system for the integration of the battery energy storage system (BESS) to the island’s hybrid system.

The Contractor will participate in the development of a project on the island of Providencia, belonging to the Archipelago of San Andrés, Providencia and Santa Catalina, an overseas department of Colombia, located in the Caribbean Sea. This project consists of the construction of a 1.8 MWp solar power plant, a battery energy storage system (BESS) and a power management system (PMS) to incorporate and manage the island's existing electrical system, which has two 1400 kilowatts (kW) and one 750 kW generator set. The Photovoltaic solar system (SSFV in Spanish) and the Providencia Island Solar Power Plant Project will be located on the same premises, which will be located in the south of the island as shown in the attached solicitation.

The Providencia Island Solar Power Plant Project will have a delivery capacity to Providencia's electric system of 2.5 megawatt hour (MWh) and a minimum delivery duration of one (1) hour, connected to a substation adjacent to the battery system, which will allow the optimization in the integration of the various generation sources (diesel plants, solar plants, solar roofs, battery system). The Providencia Island Solar Power Plant Project will support the interoperability of energy sources, reduction of load oscillation, primary frequency regulation, and resilience for emergency conditions. The system will supply the island's peak demand up to 1.8 megawatt
(MW) for one hour, black start, and continuous voltage regulation according to the operating range for 13.2 kilovolt (kV) grids.

Files

File Type Posted
72051423R00004 (04).pdf PDF
72051423R00004 conformed to mod 04.pdf PDF
72051423R00004 (03) List of Changes.pdf PDF
J.7.1 - HiRes ECP-MCE-ECC21007-ID-01-ELE-PL-48-0-01.pdf PDF
J.7.13 - EPC-MCE-ECC21007-ID-01-INS-PL-112.pdf PDF
J.7.14 - ECP-MCE-ECC21007-ID-01-ELE-ET-101.pdf PDF
J.7.16 - Ubicacion_Shelter_PMS.pdf PDF
72051423R00004 (03) - Conformed Solicitation (informational).pdf PDF
J.7.15 - Arquitectura_Control_SOPESA.pdf PDF
72051423R00004 (03) Attachments.pdf PDF
Providencia QandA.pdf PDF
72051423R00004 (02).pdf PDF
72051423R00004 Providencia Solar RFP.pdf PDF
J.6 Budget Template.xlsx XLSX spreadsheet
J.7.1 - ECP-MCE-ECC21007-ID-01-ELE-PL-48-0-01.pdf PDF
J.7.2 - ECP-MCE-ECC21007-ID-01-CIV-PL-027-E-01.pdf PDF
J.7.5 - ECP-MCE-ECC21007-ID-01-INS-ET-117-B.pdf PDF
J.7.10 - ECP-MCE-ECC21007-ID-01-INS-ET-155-C.pdf PDF
72051423R00004 Providencia Solar RFP Attachments.pdf PDF
J.2. MME MOU.pdf PDF
J.7.3 - ECP-MCE-ECC21007-ID-01-CIV-PL-027-E-02.pdf PDF
J.7.4 - ECP-MCE-ECC21007-ID-01-CIV-PL-027-E-03.pdf PDF
J.7.6 - EPC-MCE-ECC21007-ID-01-INS-PL-112-4.pdf PDF
J.7.7 - EPC-MCE-ECC21007-ID-01-INS-PL-112-6.pdf PDF
J.7.9 - ECP-MCE-ECC21007-ID-01-INS-ET-157-0.pdf PDF
J.7.8 - EPC-MCE-ECC21007-ID-01-INS-PL-112-8.pdf PDF
J.7.11 - ECP-21007-IB01-0-INS-ET-002.pdf PDF
J.7.12 - ECP-21007-IB01-0-INS-ET-003.pdf PDF
Show all 28