J.7.16 - Ubicacion_Shelter_PMS.pdf

PDF 11 MB Posted

Attached to
Providencia Island Solar Power Plant Project
Solicitation number
72051423R00004
Issued by

About this file

This solicitation is for a Providencia Island Solar Power Plant Project in Colombia. The project will manufacture or procure a battery-based electrical energy storage system to serve as the primary energy source for Providencia Island. The system will include cells, modules, battery racks, inverters, a battery management system, control, monitoring, protection and communication systems, auxiliary battery services, and a SCADA system to integrate the battery energy storage system into the island's hybrid system. The contractor will participate in developing a 1.8 MWp solar power plant, battery energy storage system, and power management system to incorporate the island's existing generators into the electrical grid. The battery storage system must have a 2.5 MWh delivery capacity to the electric system for a minimum of one hour. The system will support interoperability of energy sources, reduce load oscillation, provide primary frequency regulation, and ensure resilience during emergencies. It must supply up to 1.8 MW of the island's peak demand for one hour, enable black starts, and continuously regulate voltage for 13.2 kV grids. The soliciting agency is the US Agency for International Development Colombia.

View the file

Other files

File Type Posted
72051423R00004 conformed to mod 04.pdf PDF
72051423R00004 (04).pdf PDF
72051423R00004 (03) List of Changes.pdf PDF
72051423R00004 (03) - Conformed Solicitation (informational).pdf PDF
72051423R00004 (03) Attachments.pdf PDF
J.7.13 - EPC-MCE-ECC21007-ID-01-INS-PL-112.pdf PDF
J.7.14 - ECP-MCE-ECC21007-ID-01-ELE-ET-101.pdf PDF
J.7.15 - Arquitectura_Control_SOPESA.pdf PDF
Providencia QandA.pdf PDF
J.7.1 - HiRes ECP-MCE-ECC21007-ID-01-ELE-PL-48-0-01.pdf PDF
72051423R00004 (02).pdf PDF
72051423R00004 Providencia Solar RFP Attachments.pdf PDF
J.7.5 - ECP-MCE-ECC21007-ID-01-INS-ET-117-B.pdf PDF
72051423R00004 Providencia Solar RFP.pdf PDF
J.7.10 - ECP-MCE-ECC21007-ID-01-INS-ET-155-C.pdf PDF
J.6 Budget Template.xlsx XLSX spreadsheet
J.7.2 - ECP-MCE-ECC21007-ID-01-CIV-PL-027-E-01.pdf PDF
J.7.12 - ECP-21007-IB01-0-INS-ET-003.pdf PDF
J.7.11 - ECP-21007-IB01-0-INS-ET-002.pdf PDF
J.7.3 - ECP-MCE-ECC21007-ID-01-CIV-PL-027-E-02.pdf PDF
J.7.1 - ECP-MCE-ECC21007-ID-01-ELE-PL-48-0-01.pdf PDF
J.7.9 - ECP-MCE-ECC21007-ID-01-INS-ET-157-0.pdf PDF
J.7.6 - EPC-MCE-ECC21007-ID-01-INS-PL-112-4.pdf PDF
J.7.4 - ECP-MCE-ECC21007-ID-01-CIV-PL-027-E-03.pdf PDF
J.7.7 - EPC-MCE-ECC21007-ID-01-INS-PL-112-6.pdf PDF
J.2. MME MOU.pdf PDF
J.7.8 - EPC-MCE-ECC21007-ID-01-INS-PL-112-8.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Se plantea que el Shelter para el PMS sea instalado en la Central de generación Bahía Garret la cual se encuentra localizada al Norte de la Isla Providencia:

Dirección:

• Sector el Caballete, Bahía Garret

• Código postal: 880028

• PROVIDENCIA, ARCHIPIÉLAGO DE SAN ANDRES

Ubicación Geográfica:

• 13.381317243078216, -81.36311773610603

Dentro de la Central de generación Bahía Garret se dispone del siguiente espacio:

Fibra óptica proveniente del Parque Solar ECP y Reconectadores

Fibra óptica Entre Celdas de Protección y Shelter

PMS Lugar previsto para Instalación del Shelter PMS

PMS

UBICACIÓN DEL SHELTER PMS EN

CENTRAL BAHÍA GARRET

Salón PMS

G1

G2

G3 C el da s de

Pr ot ec ci ón

Almacenamiento Diésel

File details come from the government source that posted it. Updated .