Pre-Solicitation Notice Initial Outfitting Medical Center Addition and Alteration (MCAA), Naval Support Activity Bethesda Campus, Bethesda, MD
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9127S22R6001
- Agency
-
ENDIST Little Rock
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 337127 Institutional Furniture Manufacturing
- PSC
- 7110 Office Furniture
- Place of performance
- Bethesda, Maryland 20810, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice seeks proposals for an initial outfitting and transition supply contract to provide relocation, transition, commissioning, and excessing services for the Medical Center Addition and Alteration project at Walter Reed National Military Medical Center in Bethesda, Maryland. The United States Army Corps of Engineers will administer the firm-fixed price contract to validate existing plans, procure new furnishings and equipment, and manage the transition of approximately 520 personnel from buildings scheduled for demolition or renovation into the new 590,000 square foot medical services building constructed in two phases. The solicitation is expected to post on February 1, 2022 on SAM.gov and will be awarded based on best overall value to the government.
The acquisition is designated as a Service-Disabled Veteran Owned Small Business set-aside. The main NAICS code is 541611 and PSC code R499 covers administrative and service contracts. The current designer of record is HDR and construction contractor is Clark Construction. The estimated contract value is over $150 million and delivery period is approximately 1,870 days following award in early 2022. Transition is projected to involve relocating equipment and personnel across multiple buildings totaling over 700,000 gross square feet of renovated and new medical facilities.
Notice text
4 versions
Update #4 · Latest ·
3February2022 - Update
The site visit schedule for 7Feb2022 has been postponed until the Final Solicitation has been approved and posted. Date and times will be provided in the Final Solicitation. Contractors will be allowed to select a preferred date and time on a first come basis.
The solicitation package is currently under review. Please monitor SAM.gov for the official solicitation and supporting documents to be posted. The solicitation is anticipated to be posted for approximately 2 weeks.
End of Update
27January2022 - Update
The Draft Solicitation has been updated as follows:
-Attachment 65 - Log Cat A Binder Set 2 2018 0118.pdf (dated 18January2018; 1076 pages) and Attachment 66 - Log Cat C Binder.pdf (dated 18January2018; 2094 pages) both documents are uploaded as mulitple documents.
-Method of Proposal Submission and copies required to be submitted has been updated.
-Bidder Inquiry has been updated: BIDDER INQUIRY KEY: 7M6NK2-T3PBQ5
-Site Visit Information has ben updated.
End of Update
DRAFT SOLICITATION HAS BEEN POSTED ATTACHED TO THIS PRE-SOLICITATION NOTICE. RESPONSE HAS BEEN EXTENDED TO 29JANUARY2022.
This is Service-Disabled Veteran Owned Small Business competitive acquisition is for a Firm-Fixed Price Initial Outfitting and Transition (IO&T) Supply Contract for the Medical Center Addition and Alteration (MCAA) at Walter Reed National Military Medical Center (WRNMMC), located at Naval Support Activity Bethesda Campus, Bethesda, MD.
The planned renovations and additions to WRNMMC are intended to provide wounded warriors, active-duty military personnel and their families with world-class healthcare services based on the principles of evidence-based design. This phase plan envisions 124,050GSF of renovations to currently occupied spaces, demolition of approximately 332,000GSF of aging and inefficient buildings and construction of 590,000 GSF state of the art medical services building that will address the facility deficiencies identified by the Defense Health Board. The project is a DBB project. The Designer of Record (DOR) is HDR and the Construction contractor is CLARK Construction. The Design/Construction project is administered by NAVFAC Washington located in Navy Yard, Washington DC. The IO&T Contract is administered by the United States Army Corps of Engineers (USACE) located in Little Rock, AR. The DOR was awarded Oct 2012 and the Construction award on Sept 2019.
This project is a stand-alone IO&T project that follows a DBB project for this location. Transition is expected to include 520 personnel (estimated). The IO Contractor may use Revit or AutoCAD for this project. The Contractor will validate the DoR plans, Project Room Content, and End User's mission needs. Minimal changes are expected and should be on a mission change only basis, unless FFE specified in the current plans is obsolete.
The IO project includes the following buildings:
-Building 2. Scope: 96,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA south). Excessing (DRMO) services required.
-Building 3. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions needing to move prior to demo in Phase II.
-Building 4. Scope: 16534 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 5. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions need to be move prior to demo in Phase II.
-Building 6. Scope: 17006 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 7. Scope: 72,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 85T. Excessing (DRMO) services required.
-Building 8, Scope: 80,000 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 9. Scope: 38,215 GSF scheduled for renovation in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South), Bldg. 9 and 85T. Excessing (DRMO) and Outfitting services required.
-Building 10. Scope: 81,835 GSF scheduled for renovation in Phase III. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 10. Excessing DRMO and Outfitting services required.
-Building 39. Scope: 590,000 GSF new construction in 2 phases. Outfitting/Transition/Commissioning Services required at completion of each phase.
-Building 84T. Scope: 9,438 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II completion. Bldg. 84T is approximately 450 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 85T: Scope 90,582 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II Completion. Bldg. 85T is approximately 300 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 100 MRI suite. Scope: 5,788 GSF scheduled for demo after Phase I completion. Relocation of equipment (including 3 MRI’s) and transition of personnel to Phase I new construction Bldg. 39 (MCAA South). Excessing (DRMO) services required after all MRI’s are transition.
Delivery Period is approximately 1870 days after award.
All required provisions and clauses will be identified in the solicitation and resulting contract award. The solicitation is expected to be posted on SAM.gov on or around February 1, 2022. However, prospective Offerors should be aware that the procurement timeline remains subject to change by the Government based on mission needs and other factors.
This notice does not commit the Government to pay, and the Government will not pay, any costs or expenses incurred by any prospective Offeror for the preparation or submission of an offer. This notice does not constitute a request for proposal, request for quote nor invitation to bid. The intent is to only provide the required notice by FAR 5.2, Synopsis of Proposed Contract Actions, in preparation for the release of the Request for Proposal (RFP).
Contract award will be made to the successful Offeror whose proposal represents the best overall value and is determined to be the most beneficial to the Government.
Update #3 ·
27January2022 - Update
The Draft Solicitation has been updated as follows:
-Attachment 65 - Log Cat A Binder Set 2 2018 0118.pdf (dated 18January2018; 1076 pages) and Attachment 66 - Log Cat C Binder.pdf (dated 18January2018; 2094 pages) both documents are uploaded as mulitple documents.
-Method of Proposal Submission and copies required to be submitted has been updated.
-Bidder Inquiry has been updated: BIDDER INQUIRY KEY: 7M6NK2-T3PBQ5
-Site Visit Information has ben updated.
End of Update
DRAFT SOLICITATION HAS BEEN POSTED ATTACHED TO THIS PRE-SOLICITATION NOTICE. RESPONSE HAS BEEN EXTENDED TO 29JANUARY2022.
This is Service-Disabled Veteran Owned Small Business competitive acquisition is for a Firm-Fixed Price Initial Outfitting and Transition (IO&T) Supply Contract for the Medical Center Addition and Alteration (MCAA) at Walter Reed National Military Medical Center (WRNMMC), located at Naval Support Activity Bethesda Campus, Bethesda, MD.
The planned renovations and additions to WRNMMC are intended to provide wounded warriors, active-duty military personnel and their families with world-class healthcare services based on the principles of evidence-based design. This phase plan envisions 124,050GSF of renovations to currently occupied spaces, demolition of approximately 332,000GSF of aging and inefficient buildings and construction of 590,000 GSF state of the art medical services building that will address the facility deficiencies identified by the Defense Health Board. The project is a DBB project. The Designer of Record (DOR) is HDR and the Construction contractor is CLARK Construction. The Design/Construction project is administered by NAVFAC Washington located in Navy Yard, Washington DC. The IO&T Contract is administered by the United States Army Corps of Engineers (USACE) located in Little Rock, AR. The DOR was awarded Oct 2012 and the Construction award on Sept 2019.
This project is a stand-alone IO&T project that follows a DBB project for this location. Transition is expected to include 520 personnel (estimated). The IO Contractor may use Revit or AutoCAD for this project. The Contractor will validate the DoR plans, Project Room Content, and End User's mission needs. Minimal changes are expected and should be on a mission change only basis, unless FFE specified in the current plans is obsolete.
The IO project includes the following buildings:
-Building 2. Scope: 96,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA south). Excessing (DRMO) services required.
-Building 3. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions needing to move prior to demo in Phase II.
-Building 4. Scope: 16534 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 5. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions need to be move prior to demo in Phase II.
-Building 6. Scope: 17006 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 7. Scope: 72,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 85T. Excessing (DRMO) services required.
-Building 8, Scope: 80,000 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 9. Scope: 38,215 GSF scheduled for renovation in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South), Bldg. 9 and 85T. Excessing (DRMO) and Outfitting services required.
-Building 10. Scope: 81,835 GSF scheduled for renovation in Phase III. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 10. Excessing DRMO and Outfitting services required.
-Building 39. Scope: 590,000 GSF new construction in 2 phases. Outfitting/Transition/Commissioning Services required at completion of each phase.
-Building 84T. Scope: 9,438 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II completion. Bldg. 84T is approximately 450 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 85T: Scope 90,582 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II Completion. Bldg. 85T is approximately 300 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 100 MRI suite. Scope: 5,788 GSF scheduled for demo after Phase I completion. Relocation of equipment (including 3 MRI’s) and transition of personnel to Phase I new construction Bldg. 39 (MCAA South). Excessing (DRMO) services required after all MRI’s are transition.
Delivery Period is approximately 1870 days after award.
All required provisions and clauses will be identified in the solicitation and resulting contract award. The solicitation is expected to be posted on SAM.gov on or around February 1, 2022. However, prospective Offerors should be aware that the procurement timeline remains subject to change by the Government based on mission needs and other factors.
This notice does not commit the Government to pay, and the Government will not pay, any costs or expenses incurred by any prospective Offeror for the preparation or submission of an offer. This notice does not constitute a request for proposal, request for quote nor invitation to bid. The intent is to only provide the required notice by FAR 5.2, Synopsis of Proposed Contract Actions, in preparation for the release of the Request for Proposal (RFP).
Contract award will be made to the successful Offeror whose proposal represents the best overall value and is determined to be the most beneficial to the Government.
Update #2 ·
DRAFT SOLICITATION HAS BEEN POSTED ATTACHED TO THIS PRE-SOLICITATION NOTICE. RESPONSE HAS BEEN EXTENDED TO 29JANUARY2022.
This is Service-Disabled Veteran Owned Small Business competitive acquisition is for a Firm-Fixed Price Initial Outfitting and Transition (IO&T) Supply Contract for the Medical Center Addition and Alteration (MCAA) at Walter Reed National Military Medical Center (WRNMMC), located at Naval Support Activity Bethesda Campus, Bethesda, MD.
The planned renovations and additions to WRNMMC are intended to provide wounded warriors, active-duty military personnel and their families with world-class healthcare services based on the principles of evidence-based design. This phase plan envisions 124,050GSF of renovations to currently occupied spaces, demolition of approximately 332,000GSF of aging and inefficient buildings and construction of 590,000 GSF state of the art medical services building that will address the facility deficiencies identified by the Defense Health Board. The project is a DBB project. The Designer of Record (DOR) is HDR and the Construction contractor is CLARK Construction. The Design/Construction project is administered by NAVFAC Washington located in Navy Yard, Washington DC. The IO&T Contract is administered by the United States Army Corps of Engineers (USACE) located in Little Rock, AR. The DOR was awarded Oct 2012 and the Construction award on Sept 2019.
This project is a stand-alone IO&T project that follows a DBB project for this location. Transition is expected to include 520 personnel (estimated). The IO Contractor may use Revit or AutoCAD for this project. The Contractor will validate the DoR plans, Project Room Content, and End User's mission needs. Minimal changes are expected and should be on a mission change only basis, unless FFE specified in the current plans is obsolete.
The IO project includes the following buildings:
-Building 2. Scope: 96,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA south). Excessing (DRMO) services required.
-Building 3. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions needing to move prior to demo in Phase II.
-Building 4. Scope: 16534 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 5. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions need to be move prior to demo in Phase II.
-Building 6. Scope: 17006 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 7. Scope: 72,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 85T. Excessing (DRMO) services required.
-Building 8, Scope: 80,000 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 9. Scope: 38,215 GSF scheduled for renovation in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South), Bldg. 9 and 85T. Excessing (DRMO) and Outfitting services required.
-Building 10. Scope: 81,835 GSF scheduled for renovation in Phase III. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 10. Excessing DRMO and Outfitting services required.
-Building 39. Scope: 590,000 GSF new construction in 2 phases. Outfitting/Transition/Commissioning Services required at completion of each phase.
-Building 84T. Scope: 9,438 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II completion. Bldg. 84T is approximately 450 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 85T: Scope 90,582 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II Completion. Bldg. 85T is approximately 300 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 100 MRI suite. Scope: 5,788 GSF scheduled for demo after Phase I completion. Relocation of equipment (including 3 MRI’s) and transition of personnel to Phase I new construction Bldg. 39 (MCAA South). Excessing (DRMO) services required after all MRI’s are transition.
Delivery Period is approximately 1870 days after award.
All required provisions and clauses will be identified in the solicitation and resulting contract award. The solicitation is expected to be posted on SAM.gov on or around February 1, 2022. However, prospective Offerors should be aware that the procurement timeline remains subject to change by the Government based on mission needs and other factors.
This notice does not commit the Government to pay, and the Government will not pay, any costs or expenses incurred by any prospective Offeror for the preparation or submission of an offer. This notice does not constitute a request for proposal, request for quote nor invitation to bid. The intent is to only provide the required notice by FAR 5.2, Synopsis of Proposed Contract Actions, in preparation for the release of the Request for Proposal (RFP).
Contract award will be made to the successful Offeror whose proposal represents the best overall value and is determined to be the most beneficial to the Government.
Update #1 ·
This is Service-Disabled Veteran Owned Small Business competitive acquisition is for a Firm-Fixed Price Initial Outfitting and Transition (IO&T) Supply Contract for the Medical Center Addition and Alteration (MCAA) at Walter Reed National Military Medical Center (WRNMMC), located at Naval Support Activity Bethesda Campus, Bethesda, MD.
The planned renovations and additions to WRNMMC are intended to provide wounded warriors, active-duty military personnel and their families with world-class healthcare services based on the principles of evidence-based design. This phase plan envisions 124,050GSF of renovations to currently occupied spaces, demolition of approximately 332,000GSF of aging and inefficient buildings and construction of 590,000 GSF state of the art medical services building that will address the facility deficiencies identified by the Defense Health Board. The project is a DBB project. The Designer of Record (DOR) is HDR and the Construction contractor is CLARK Construction. The Design/Construction project is administered by NAVFAC Washington located in Navy Yard, Washington DC. The IO&T Contract is administered by the United States Army Corps of Engineers (USACE) located in Little Rock, AR. The DOR was awarded Oct 2012 and the Construction award on Sept 2019.
This project is a stand-alone IO&T project that follows a DBB project for this location. Transition is expected to include 520 personnel (estimated). The IO Contractor may use Revit or AutoCAD for this project. The Contractor will validate the DoR plans, Project Room Content, and End User's mission needs. Minimal changes are expected and should be on a mission change only basis, unless FFE specified in the current plans is obsolete.
The IO project includes the following buildings:
-Building 2. Scope: 96,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA south). Excessing (DRMO) services required.
-Building 3. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions needing to move prior to demo in Phase II.
-Building 4. Scope: 16534 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 5. Scope: Transition services required from Bldgs. 2 and 7 for designated spaces/functions need to be move prior to demo in Phase II.
-Building 6. Scope: 17006 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 7. Scope: 72,000 GSF scheduled for demo in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 85T. Excessing (DRMO) services required.
-Building 8, Scope: 80,000 GSF scheduled for demolition. (‘No’ IO&T services required)
-Building 9. Scope: 38,215 GSF scheduled for renovation in Phase II. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South), Bldg. 9 and 85T. Excessing (DRMO) and Outfitting services required.
-Building 10. Scope: 81,835 GSF scheduled for renovation in Phase III. Relocation of equipment and transition of personnel to Phase I new construction Bldg. 39 (MCAA South) and Bldg. 10. Excessing DRMO and Outfitting services required.
-Building 39. Scope: 590,000 GSF new construction in 2 phases. Outfitting/Transition/Commissioning Services required at completion of each phase.
-Building 84T. Scope: 9,438 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II completion. Bldg. 84T is approximately 450 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 85T: Scope 90,582 GSF Temporary Facilities scheduled for demo after Phase II completion. Relocation of equipment and transition of personnel to newly constructed Bldg. 39 (MCAA North and South) in Phase I and II per transition schedule. Excessing (DRMO) services required after PHASE II Completion. Bldg. 85T is approximately 300 feet from the existing Walter Reed Outpatient Clinic (Bldg. 19).
-Building 100 MRI suite. Scope: 5,788 GSF scheduled for demo after Phase I completion. Relocation of equipment (including 3 MRI’s) and transition of personnel to Phase I new construction Bldg. 39 (MCAA South). Excessing (DRMO) services required after all MRI’s are transition.
Delivery Period is approximately 1870 days after award.
All required provisions and clauses will be identified in the solicitation and resulting contract award. The solicitation is expected to be posted on SAM.gov on or around February 1, 2022. However, prospective Offerors should be aware that the procurement timeline remains subject to change by the Government based on mission needs and other factors.
This notice does not commit the Government to pay, and the Government will not pay, any costs or expenses incurred by any prospective Offeror for the preparation or submission of an offer. This notice does not constitute a request for proposal, request for quote nor invitation to bid. The intent is to only provide the required notice by FAR 5.2, Synopsis of Proposed Contract Actions, in preparation for the release of the Request for Proposal (RFP).
Contract award will be made to the successful Offeror whose proposal represents the best overall value and is determined to be the most beneficial to the Government.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--36C25227B0026 Remodel ENT Procedure Rooms CON 537-19-109 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business | |
| 540-22-700 | EHRM Infrastructure Upgrades Construction | Clarksburg WV | VA Technology Acquisition Center | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--528A8-22-814 Consolidate Primary Care Reception | Veterans Integrated Service Network 2 | No set-aside | |
| Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Y1DA--FY27 NRM | 619-24-103 | Replace Flooring & Repair Walls in Building 1 (VA-27-00012190) | Veterans Integrated Service Network 7 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity