Attachment 3 - GC Schedule 113782 - June 2021 - Full WBS.pdf

PDF 12 MB Posted

Attached to
Pre-Solicitation Notice Initial Outfitting Medical Center Addition and Alteration (MCAA), Naval Support Activity Bethesda Campus, Bethesda, MD
Solicitation number
W9127S22R6001
Issued by

About this file

This pre-solicitation notice provides details for an initial outfitting and transition supply contract to support renovations and additions at the Walter Reed National Military Medical Center in Bethesda, Maryland. The contract will include relocating equipment and transitioning personnel from buildings scheduled for demolition into new construction and renovated spaces. Key requirements include outfitting and commissioning services for the new 590,000 square foot building addition in two phases, as well as transition support for various buildings and temporary facilities. The estimated delivery period is 1,870 days following award. The solicitation is expected to be posted on February 1, 2022. The award will be made to the offeror providing the best overall value to the government. The contracting agency is the United States Army Corps of Engineers Engineering District in Little Rock, Arkansas.

View the file

Other files

File Type Posted
Draft Solicitation 27January2022.pdf PDF
Attachment 65a - Log Cat A Binder Set 2 2018 0118_Part1.pdf PDF
Attachment 66b - Log Cat C Binder_Part2.pdf PDF
Attachment 66c - Log Cat C Binder_Part3.pdf PDF
Attachment 65b - Log Cat A Binder Set 2 2018 0118_Part2.pdf PDF
Attachment 66d - Log Cat C Binder_Part4.pdf PDF
Attachment 66a - Log Cat C Binder_Part1.pdf PDF
Attachment 29 - B.08.02_DMLSS P1 DCAA.xls XLS spreadsheet
Attachment 19 - BLDG 10 FLOOR PLAN SET.pdf PDF
Attachment 23 - CID Supporting Documents Redacted.pdf PDF
Attachment 52 - DMLSS P2-3 BHDA01.xls XLS spreadsheet
Attachment 40 - DMLSS P1 OB GYN3.xls XLS spreadsheet
Attachment 26 - Design Analysis 65Percent Basis of Design.pdf PDF
Attachment 9 - 1171746drwg600021.pdf PDF
Attachment 68 - Log Cat R Binder.pdf PDF
Attachment 57 - DMLSS P2-3 EBFA00 HC.xls XLS spreadsheet
Attachment 36 - DMLSS P1 METERNAL.xls XLS spreadsheet
Attachment 83 - Updated Artwork Package.pdf PDF
Draft Solicitation 22R6001.pdf PDF
Attachment 72 - MCAA PHASE 1_28OCT21 Redated V4.xlsx XLSX spreadsheet
Attachment 75 - MilCon Pre-Bid Site Visit Presentation for Construction Contractors (June 2019).pdf PDF
Attachment 54 - DMLSS P2-3 BLAA00 PI.xls XLS spreadsheet
Attachment 8 - 1171746drwg60007I.pdf PDF
Attachment 41 - DMLSS P1 PRIMARY.xls XLS spreadsheet
Attachment 17 - BLDG 07 FLOOR PLAN SET.pdf PDF
Attachment 81 - SECNAV_5512_1_11787 APPROVED AC PASS ID FORM 05282014.pdf PDF
Attachment 46 - DMLSS P2-3 BBDA01.xls XLS spreadsheet
Attachment 53 - DMLSS P2-3 BHGA00.xls XLS spreadsheet
Attachment 50 - DMLSS P2-3 BHAAWW.xls XLS spreadsheet
Attachment 51 - DMLSS P2-3 BHCA00.xls XLS spreadsheet
Attachment 84 - Wayfinding and Signage.docx DOCX document
Attachment 15 - BLDG 02 FLOOR PLAN SET.pdf PDF
Attachment 49 - DMLSS P2-3 BFFA00.xls XLS spreadsheet
Attachment 6 - 1171746drwg60005.pdf PDF
Attachment 16 - B.08.02_BLDG 05 FLOOR PLAN SET.pdf PDF
Attachment 55 - DMLSS P2-3 BLBA00 OC.xls XLS spreadsheet
Attachment 20 - BLDG 84T_FLOOR PLAN SET_20130111.pdf PDF
Attachment 11 - 20201130 PFD WR MCAA BLDG 9-10.pdf PDF
Attachment 25 - DBIDs-Process-Guide.pdf PDF
Attachment 62 - DMLSS Phase 1 OBGYN.xls XLS spreadsheet
Attachment 21 - BLDG 85T OUTPT MED FAC OVERALL 2.pdf PDF
Attachment 4 - 1171746drwg60001.pdf PDF
Attachment 22 - BLDG 85T OUTPT MED FAC OVERALL.pdf PDF
Attachment 12 - 20201135 PFD WR MCAA BLDG C.pdf PDF
Attachment 77 - NSA-Bethesda Installation and Maps.pdf PDF
Attachment 70 - MCAA IOR Weekly Risk Report Template.xlsx XLSX spreadsheet
Attachment 27 - DMLSS P1 ANESTHESIA.xls XLS spreadsheet
Attachment 45 - DMLSS P2-3 BBDA00.xls XLS spreadsheet
Attachment 82 - Submittal Examples.pdf PDF
Attachment 31 - DMLSS P1 ER.xls XLS spreadsheet
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Activity ID Activity Name Original Duration

Remaining Duration

Start Finish

TotalTotal 1902 1489 11-Nov-2019 A 13-May-2027

WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSIONWALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION 1902 1489 11-Nov-2019 A 13-May-2027

MILESTONESMILESTONES 1844 1489 12-Nov-2019 A 13-May-2027

MILE-005 Contract Award 0 0 12-Nov-2019 A

MILE-010 Notice To Proceed Phase 1 0 0 21-Sep-2020 A

MILE-140 Cafeteria Complete 0 0 19-Oct-2020 A

MILE-101 Building C Phase 1 CCD (1219 CD after NTP) 0 0 08-May-2024*

MILE-015 Notice To Proceed Phase 2 / 3 / 4 (120 CD Owner Move Complete)0 0 06-Sep-2024*

MILE-103 Building 9 Phase 3 CCD (365 CD after PH 1 Occupancy) 0 0 04-Sep-2025*

MILE-104 Building 10 Phase 4 CCD (730 CD after PH 1 Occupancy) 0 0 04-Sep-2026*

MILE-102 Building C Phase 2 CCD (851 CD after PH 1 Occupancy) 0 0 03-Jan-2027*

MILE-126 Projected Completion 0 0 13-May-2027

MILE-110 Contract Completion (CCD) 0 0 13-May-2027*

PHASE 1 PROJECT MILESTONESPHASE 1 PROJECT MILESTONES 1104 1000 08-Apr-2021 A 08-May-2024

P1MILE-230 Phase 1 - Start Structural Foundations 0 0 08-Apr-2021 A

P1MILE-220 Phase 1 - Existing Buildings Demolished 0 0 30-Apr-2021 A

P1MILE-240 Phase 1 - Start Structural Concrete 0 0 13-Aug-2021

P1MILE-260 Phase 1 - Offsite Exterior Mock-Up Complete 0 0 27-Oct-2021

P1MILE-270 Phase 1 - Offsite Exterior Mock-Up Book Complete 0 0 10-Nov-2021

P1MILE-180 Phase 1 - Start Building Envelope 0 0 22-Feb-2022

P1MILE-190 Phase 1 - Structure Top-Out 0 0 02-May-2022

P1MILE-210 Phase 1 - Facility Turnover Planning Meeting 0 0 07-Jul-2022

P1MILE-130 Phase 1 - Permanent Power 0 0 14-Jul-2022

P1MILE-160 Phase 1 - Temporary Watertight 0 0 25-Aug-2022

P1MILE-250 Phase 1 - Start Hanging Drywall 0 0 26-Aug-2022

P1MILE-150 Phase 1 - Conditioned Air 0 0 28-Sep-2022

P1MILE-170 Phase 1 - Building Envelope Complete 0 0 24-Mar-2023

P1MILE-200 Phase 1 - Substantial Completion Phase 1 0 0 08-May-2024

LOE MILESTONESLOE MILESTONES 1683 1489 21-Sep-2020 A 13-May-2027

LOE-PHASE1 LOE - Building C Phase 1 937 716 21-Sep-2020 A 08-May-2024

LOE-PHASE4 LOE - Building 10 Phase 4 1060 1060 18-Jun-2024 13-May-2027

LOE-PHASE2 LOE - Building C Phase 2 850 850 06-Sep-2024 03-Jan-2027

LOE-PHASE3 LOE - Building 9 Phase 3 364 364 06-Sep-2024 04-Sep-2025

SUMMARY SCHEDULESUMMARY SCHEDULE 1015 716 23-Dec-2019 A 08-May-2024

SUMM-UTL-1150 Phase 1 Site Utilities 272 64 23-Dec-2019 A 02-Sep-2021

SUMM-SURV-1150 Phase 1 Surveying Site 1012 765 06-Apr-2020 A 04-Aug-2023

SUMM-NOISE-1000 Phase 1 Noise and Vibrations 1366 1043 21-Sep-2020 A 08-May-2024

SUMM-PEST-1000 Phase 1 Pest Control 1219 1022 21-Sep-2020 A 17-Apr-2024

SUMM-DEMO-1140 Phase 1 Demolition 174 0 19-Nov-2020 A 02-Jun-2021 A

SUMM-DFDN-1160 Phase 1 Deep Foundations 127 14 09-Apr-2021 A 14-Jul-2021

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Notice To Proceed Phase 1

Phase 1 - Start Structural Foundations

Phase 1 - Existing Buildings Demolished

Phase 1 - Start Structural Concrete

Phase 1 - Offsite Exterior Mock-Up Complete

Phase 1 - Offsite Exterior Mock-Up Book Complete

Phase 1 - Start Building Envelope

Phase 1 - Structure Top-Out

Phase 1 - Facility Turnover Planning Meeting

Phase 1 - Permanent Power

Phase 1 Site Utilities

Phase 1 Demolition

Phase 1 Deep Foundations

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Full WBS

Remaining Duration

Start Finish

SUMM-BGS-1140 Phase 1 Below Grade Structure 79 79 12-Aug-2021 29-Oct-2021

SUMM-AGS-1130 Phase 1 Above Grade Structure 268 268 28-Sep-2021 22-Jun-2022

SUMM-RI-1160 Phase 1 Rough-Ins 481 481 24-Jan-2022 19-May-2023

SUMM-WSKIN-1170 Phase 1 Building Envelope - West Elevation 211 211 22-Feb-2022 20-Sep-2022

SUMM-SSKIN-1180 Phase 1 Building Envelope - South Elevation 406 406 22-Feb-2022 03-Apr-2023

SUMM-ESKIN-1190 Phase 1 Building Envelope - East Elevation 162 162 07-Apr-2022 15-Sep-2022

SUMM-NSKIN-1200 Phase 1 Building Envelope - North Elevation 202 202 07-Apr-2022 25-Oct-2022

SUMM-HOIST-1000 Phase 1 Construction Hoist Operations 455 455 27-Apr-2022 25-Jul-2023

SUMM-ELEV-OPCOST Operator Hours 368 man hours at $152.27/hr ($188.44/hr OT) for other trades (ExB#45)308 308 27-Apr-2022 18-Jul-2023

SUMM-MERR-1210 Phase 1 Building Envelope - MER Roof 302 302 19-May-2022 16-Mar-2023

SUMM-WROOF-1200 Phase 1 Building Envelope - Roofing 155 155 22-Jul-2022 23-Dec-2022

SUMM-FIN-1170 Phase 1 Finishes 526 526 24-Aug-2022 31-Jan-2024

SUMM-UTL-1160 Phase 1 Landscaping 83 83 26-Jul-2023 16-Oct-2023

SUMM-INSP-1180 Phase 1 Testing and Inspections 98 98 20-Oct-2023 25-Jan-2024

MOBILIZATION AND STARTUPMOBILIZATION AND STARTUP 339 0 02-Dec-2019 A 16-Apr-2021 A

CLARK MOBILIZATIONCLARK MOBILIZATION 5 0 02-Mar-2020 A 06-Mar-2020 A

CMOB-1000 Clark Mobilize Onsite 5 0 02-Mar-2020 A 06-Mar-2020 A

FIELD OFFICE SETUPFIELD OFFICE SETUP 339 0 02-Dec-2019 A 16-Apr-2021 A

FOFC-1000 NAVFAC Develop Layout 5 0 02-Dec-2019 A 31-Dec-2019 A

FOFC-1020 Procure Proposals For Layout 13 0 02-Jan-2020 A 15-Jan-2020 A

FOFC-1030 Develop Outage Request 7 0 09-Jan-2020 A 10-Jan-2020 A

FOFC-1040 NAVFAC Review & Approve Outage Request 5 0 10-Jan-2020 A 28-Jan-2020 A

FOFC-1060 Clark Submit Budget For Barracks 5 0 15-Jan-2020 A 04-Feb-2020 A

FOFC-1070 NAVFAC Approve Budget For Barracks 5 0 05-Feb-2020 A 21-Feb-2020 A

FOFC-1050 NAVFAC Preconstruction Meeting 1 0 18-Feb-2020 A 18-Feb-2020 A

CLARK FIELD OFFICE RENOVATIONCLARK FIELD OFFICE RENOVATION 161 0 19-Feb-2020 A 17-Sep-2020 A

OFFICE SPACE & COMMON AREASOFFICE SPACE & COMMON AREAS 161 0 19-Feb-2020 A 17-Sep-2020 A

FIELD-CLARK-1020 Cut / Cap Plumbing - Clark Office 5 0 19-Feb-2020 A 09-Apr-2020 A

FIELD-CLARK-1000 Demolition - Clark Office 7 0 25-Feb-2020 A 17-Apr-2020 A

FIELD-CLARK-1005 Cut & Make Safe Electrical - Clark Office 5 0 26-Feb-2020 A 13-Mar-2020 A

FIELD-CLARK-1007 Relocate Electrical Risers - Clark Office 3 0 26-Feb-2020 A 24-Apr-2020 A

FIELD-CLARK-1065 Reroute Electrical Wiring - Clark Office 4 0 26-Feb-2020 A 24-Apr-2020 A

FIELD-CLARK-1040 Relocate Sprinkler Heads - Clark Office 2 0 28-Feb-2020 A 02-Mar-2020 A

FIELD-CLARK-1210 IMPACT PCO#810005 - 1 - Mold Discovered at Bathrooms & Chases (Develop Scope & Price)7 0 28-Feb-2020 A 13-Mar-2020 A

FIELD-CLARK-1010 Relocate HVAC - Clark Office 6 0 02-Mar-2020 A 27-Mar-2020 A

FIELD-CLARK-1240 IMPACT PCO#810005 - 2 - NAVFAC Approve Mold Remediation Scope and Price5 0 09-Mar-2020 A 13-Mar-2020 A

FIELD-CLARK-1250 IMPACT - Coronavirus Patients in Bldg 61 7 0 13-Mar-2020 A 25-Mar-2020 A

FIELD-CLARK-1220 IMPACT PCO#810005 - 4 - Mold Remediation - Clark Office 7 0 30-Mar-2020 A 17-Apr-2020 A

FIELD-CLARK-1270 IMPACT PCO#810005 - 3 - Additional Mold Discovered at Bathrooms4 0 09-Apr-2020 A 17-Apr-2020 A

FIELD-CLARK-1280 IMPACT PCO#810005 - 5 - Mold Remediation - Common Area5 0 20-Apr-2020 A 20-Apr-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Phase 1 Below Grade Structure

Phase 1 Above Grade Structure

IMPACT PCO#810005 - 1 - Mold Discovered at Bathrooms & Chases (Develop Scope & Price)

IMPACT PCO#810005 - 2 - NAVFAC Approve Mold Remediation Scope and Price

IMPACT PCO#810005 - 4 - Mold Remediation - Clark Office

IMPACT PCO#810005 - 3 - Additional Mold Discovered at Bathrooms

IMPACT PCO#810005 - 5 - Mold Remediation - Common Area

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

FIELD-CLARK-1290 IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - Rocksprings8 0 20-Apr-2020 A 29-Apr-2020 A

FIELD-CLARK-1320 IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - MC Dean8 0 20-Apr-2020 A 29-Apr-2020 A

FIELD-CLARK-1080 Install Lighting - Clark Office 6 0 24-Apr-2020 A 04-May-2020 A

FIELD-CLARK-1030 Outlets And HVAC Connections - Clark Office 4 0 27-Apr-2020 A 06-May-2020 A

FIELD-CLARK-1060 Install Drywall HVAC Units - Clark Office 4 0 28-Apr-2020 A 08-May-2020 A

FIELD-CLARK-1050 Install Drywall In Bathroom And Reception - Clark Office 3 0 30-Apr-2020 A 05-May-2020 A

FIELD-CLARK-1070 Rough Carpentry - Clark Office 3 0 30-Apr-2020 A 05-May-2020 A

FIELD-CLARK-1100 Prime And Paint - Clark Office 6 0 04-May-2020 A 27-May-2020 A

FIELD-CLARK-1140 Install Lighting - Bathroom - Clark Office 2 0 04-May-2020 A 07-May-2020 A

FIELD-CLARK-1105 Install Low Voltage & AV - Clark Office 4 0 05-May-2020 A 15-May-2020 A

FIELD-CLARK-1310 IMPACT - COVID 19 DELIVERY OF FURNITURE 25 0 06-May-2020 A 12-Jun-2020 A

FIELD-CLARK-1150 Install Toilets & Urinals Prefab Carriers - Bathroom - Clark Office3 0 14-May-2020 A 18-May-2020 A

FIELD-CLARK-1090 Install Flooring - Clark Office 8 0 01-Jun-2020 A 09-Jun-2020 A

FIELD-CLARK-1330 IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - JJK3 0 02-Jun-2020 A 10-Jun-2020 A

FIELD-CLARK-1160 Install Wall Panels - Bathroom - Clark Office 1 0 05-Jun-2020 A 11-Jun-2020 A

FIELD-CLARK-1340 IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - Source One6 0 08-Jun-2020 A 12-Jun-2020 A

FIELD-CLARK-1120 Install Furniture - Clark Office 4 0 15-Jun-2020 A 22-Jun-2020 A

FIELD-CLARK-1200 Prime And Paint - Bathroom - Clark Office 2 0 15-Jun-2020 A 17-Jun-2020 A

FIELD-CLARK-1170 Install Flooring - Bathroom - Clark Office 2 0 17-Jun-2020 A 22-Jun-2020 A

FIELD-CLARK-1130 Clark Move In 0 0 22-Jun-2020 A

FIELD-CLARK-1190 Install Sinks & Fixtures - Bathroom - Clark Office 1 0 12-Aug-2020 A 13-Aug-2020 A

FIELD-CLARK-1155 Install Toilet Partitions - Bathroom - Clark Office 2 0 13-Aug-2020 A 13-Aug-2020 A

FIELD-CLARK-1180 Install Bathroom Accessories 1 0 17-Aug-2020 A 18-Aug-2020 A

FIELD-CLARK-1110 Install Kitchen Cabinets And Appliances - Clark Office 4 0 14-Sep-2020 A 17-Sep-2020 A

PCO 810033 - RFI 0175 (Building 61 Core Drill through Slabs Confirmation)PCO 810033 - RFI 0175 (Building 61 Core Drill through Slabs Confirmation) 68 0 29-Apr-2020 A 20-May-2020 A

FIELD-CLARK-1360 IMPACT - RFI 0175 - Building 61 Core Drill through Slabs Confirmation - PCO#81003315 0 29-Apr-2020 A 12-May-2020 A

FIELD-CLARK-1370 IMPACT - RFI 0175 - Relocate Sprinkler - PCO#810033 3 0 13-May-2020 A 15-May-2020 A

FIELD-CLARK-1380 IMPACT - RFI 0175 - Patch Drywall - PCO#810033 3 0 18-May-2020 A 20-May-2020 A

NAVFAC FIELD OFFICE RENOVATIONNAVFAC FIELD OFFICE RENOVATION 321 0 21-Feb-2020 A 16-Apr-2021 A

OFFICE SPACE & COMMON AREASOFFICE SPACE & COMMON AREAS 321 0 21-Feb-2020 A 16-Apr-2021 A

FIELD-NAVFAC-1215 Cut & Make Safe Electrical - NAVFAC Office 5 0 21-Feb-2020 A 04-May-2020 A

FIELD-NAVFAC-1230 Cut / Cap Plumbing - NAVFAC Office 5 0 25-Feb-2020 A 05-May-2020 A

FIELD-NAVFAC-1210 Demolition - NAVFAC Office 7 0 28-Feb-2020 A 08-May-2020 A

FIELD-CLARK-1260 IMPACT - NAVFAC ISSUES STOP WORK (East Side) DUE TO OCCUPANCY 3rd & 4th Floors20 0 06-Apr-2020 A 20-Apr-2020 A

FIELD-NAVFAC-1240 Relocate Sprinkler Heads - NAVFAC Office 2 0 20-Apr-2020 A 08-May-2020 A

FIELD-CLARK-1230 IMPACT PCO#810005 - 7 - Mold Remediation 7 0 21-Apr-2020 A 23-Apr-2020 A

FIELD-NAVFAC-1260 Outlets And HVAC Connections - NAVFAC Office 4 0 27-Apr-2020 A 04-May-2020 A

FIELD-NAVFAC-1217 Relocate Electrical Risers - NAVFAC Office 3 0 27-Apr-2020 A 04-May-2020 A

FIELD-NAVFAC-1275 Reroute Electrical Wiring - NAVFAC Office 4 0 27-Apr-2020 A 04-May-2020 A

FIELD-CLARK-1300 IMPACT PCO#810005 - 8 - Rebuild of Mold Remediation - Rockspring5 0 27-Apr-2020 A 04-May-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - Rocksprings

IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - MC Dean

IMPACT - COVID 19 DELIVERY OF FURNITURE

Install Toilets & Urinals Prefab Carriers - Bathroom - Clark Office

IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - JJK

IMPACT PCO#810005 - 6 - Rebuild of Mold Remediation - Source One

Install Sinks & Fixtures - Bathroom - Clark Office

Install Toilet Partitions - Bathroom - Clark Office

Install Kitchen Cabinets And Appliances - Clark Office

IMPACT - RFI 0175 - Building 61 Core Drill through Slabs Confirmation - PCO#810033

IMPACT - RFI 0175 - Relocate Sprinkler - PCO#810033

IMPACT - NAVFAC ISSUES STOP WORK (East Side) DUE TO OCCUPANCY 3rd & 4th Floors

IMPACT PCO#810005 - 8 - Rebuild of Mold Remediation - Rockspring

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

FIELD-NAVFAC-1276 IMPACT PCO#810005 - 8 - Rebuild of Mold Remediation - MC Dean5 0 27-Apr-2020 A 04-May-2020 A

FIELD-NAVFAC-1250 Install Drywall In Bathroom And Reception - NAVFAC Office 3 0 30-Apr-2020 A 01-Jun-2020 A

FIELD-NAVFAC-1220 Relocate HVAC - NAVFAC Office - TO BE DELETED 6 0 04-May-2020 A 04-May-2020 A

FIELD-NAVFAC-1270 Install Drywall HVAC Units - NAVFAC Office 4 0 04-May-2020 A 04-May-2020 A

FIELD-NAVFAC-1280 Install Lighting - NAVFAC Office 6 0 07-May-2020 A 18-May-2020 A

FIELD-NAVFAC-1350 Install Lighting - Bathroom - NAVFAC Office 2 0 07-May-2020 A 15-May-2020 A

FIELD-NAVFAC-1290 Rough Carpentry - NAVFAC Office 3 0 11-May-2020 A 13-May-2020 A

FIELD-NAVFAC-1310 Prime And Paint - NAVFAC Office 10 0 27-May-2020 A 11-Jun-2020 A

FIELD-NAVFAC-1390 Install Casework - Bathroom - NAVFAC Office - TO BE DELETED1 0 01-Jun-2020 A 02-Jun-2020 A

FIELD-NAVFAC-1300 Install Flooring - NAVFAC Office 8 0 10-Jun-2020 A 22-Jun-2020 A

FIELD-NAVFAC-1360 Install Toilets & Urinals Prefab Carriers - Bathroom - NAVFAC Office3 0 15-Jun-2020 A 17-Jun-2020 A

FIELD-NAVFAC-1410 Prime And Paint - Bathroom - NAVFAC Office 2 0 18-Jun-2020 A 19-Jun-2020 A

FIELD-NAVFAC-1330 Install Furniture - NAVFAC Office 4 0 19-Jun-2020 A 23-Jun-2020 A

FIELD-NAVFAC-1370 Install Wall Panels - Bathroom - NAVFAC Office 1 0 22-Jun-2020 A 25-Jun-2020 A

FIELD-NAVFAC-1380 Install Flooring - Bathroom - NAVFAC Office 2 0 24-Jun-2020 A 10-Jul-2020 A

FIELD-NAVFAC-1320 Final Clean - NAVFAC Office 4 0 20-Jul-2020 A 21-Jul-2020 A

FIELD-NAVFAC-1365 Install Toilet Partitions - Bathroom - NAVFAC Office 2 0 13-Aug-2020 A 14-Aug-2020 A

FIELD-NAVFAC-1400 Install Sinks & Fixtures - Bathroom - NAVFAC Office 1 0 14-Aug-2020 A 14-Aug-2020 A

FIELD-NAVFAC-1340 NAVFAC Move In 0 0 16-Apr-2021 A

810051 - IT INFRASTRUCTURE810051 - IT INFRASTRUCTURE 103 0 02-Jun-2020 A 13-Nov-2020 A

FIELD-NAVFAC-1480 IMPACT - NAVFAC Issues RFP for 810051 1 0 02-Jun-2020 A 03-Jun-2020 A

FIELD-NAVFAC-1490 IMPACT - Clark Provides Pricing for RFP 810051 40 0 03-Jun-2020 A 10-Aug-2020 A

FIELD-NAVFAC-1500 IMPACT - NAVFAC & Clark Negotiate Pricing for RFP 810051 5 0 10-Aug-2020 A 10-Aug-2020 A

FIELD-NAVFAC-1510 IMPACT - NAVFAC Issues MOD for 810051 5 0 10-Aug-2020 A 13-Aug-2020 A

FIELD-NAVFAC-1520 IMPACT - Clark Procures Materials & Mobilizes for 810051 20 0 13-Aug-2020 A 10-Sep-2020 A

FIELD-NAVFAC-1530 IMPACT - Clark Installs Work for 810051 15 0 11-Sep-2020 A 13-Nov-2020 A

810157 - NAVFAC RFP FFE CHANGES810157 - NAVFAC RFP FFE CHANGES 191 0 06-Oct-2020 A 09-Apr-2021 A

FIELD-NAVFAC-1540 IMPACT - NAVFAC Issues RFP for 810157 1 0 06-Oct-2020 A 06-Oct-2020 A

FIELD-NAVFAC-1550 IMPACT - Clark Provides Pricing for RFP 810157 20 0 06-Oct-2020 A 05-Dec-2020 A

FIELD-NAVFAC-1560 IMPACT - NAVFAC & Clark Negotiate Pricing for RFP 810157 5 0 07-Dec-2020 A 21-Jan-2021 A

FIELD-NAVFAC-1570 IMPACT - NAVFAC Issues NTP for 810157 5 0 06-Jan-2021 A 06-Jan-2021 A

FIELD-NAVFAC-1580 IMPACT - Clark Procures Materials & Mobilizes for 810157 20 0 07-Jan-2021 A 26-Jan-2021 A

FIELD-NAVFAC-1590 IMPACT - Clark Installs Electrical Work for 810157 15 0 26-Jan-2021 A 12-Feb-2021 A

FIELD-NAVFAC-1600 IMPACT - Clark Releases Furniture Work for 810157 5 0 22-Feb-2021 A 26-Feb-2021 A

FIELD-NAVFAC-1610 IMPACT - Furniture Lead Time for 810157 30 0 01-Mar-2021 A 01-Apr-2021 A

FIELD-NAVFAC-1620 IMPACT - Install Furniture Lead for 810157 5 0 02-Apr-2021 A 09-Apr-2021 A

810002 2ND FLOOR USUHS SPACE810002 2ND FLOOR USUHS SPACE 43 0 30-Apr-2020 A 27-Jul-2020 A

FIELD-NAVFAC-1420 NAVFAC Issues 810002 NTP to Clark 1 0 30-Apr-2020 A 30-Apr-2020 A

FIELD-NAVFAC-1430 Demo Carpet & Finishes - 810002 3 0 04-May-2020 A 06-May-2020 A

FIELD-NAVFAC-1440 Deliver & Store Lighting - 810002 5 0 18-Jun-2020 A 24-Jun-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

IMPACT PCO#810005 - 8 - Rebuild of Mold Remediation - MC Dean

Install Drywall In Bathroom And Reception - NAVFAC Office

Install Casework - Bathroom - NAVFAC Office - TO BE DELETED

Install Toilets & Urinals Prefab Carriers - Bathroom - NAVFAC Office

Install Wall Panels - Bathroom - NAVFAC Office

Install Flooring - Bathroom - NAVFAC Office

Install Toilet Partitions - Bathroom - NAVFAC Office

Install Sinks & Fixtures - Bathroom - NAVFAC Office

NAVFAC Move In

IMPACT - Clark Provides Pricing for RFP 810051

IMPACT - NAVFAC & Clark Negotiate Pricing for RFP 810051

IMPACT - NAVFAC Issues MOD for 810051

IMPACT - Clark Procures Materials & Mobilizes for 810051

IMPACT - Clark Installs Work for 810051

IMPACT - NAVFAC Issues RFP for 810157

IMPACT - Clark Provides Pricing for RFP 810157

IMPACT - NAVFAC & Clark Negotiate Pricing for RFP 810157

IMPACT - NAVFAC Issues NTP for 810157

IMPACT - Clark Procures Materials & Mobilizes for 810157

IMPACT - Clark Installs Electrical Work for 810157

IMPACT - Clark Releases Furniture Work for 810157

IMPACT - Furniture Lead Time for 810157

IMPACT - Install Furniture Lead for 810157

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

FIELD-NAVFAC-1450 Prime & Paint Walls - 810002 15 0 23-Jun-2020 A 17-Jul-2020 A

FIELD-NAVFAC-1460 Install Carpet & Flooring - 810002 3 0 20-Jul-2020 A 24-Jul-2020 A

FIELD-NAVFAC-1470 Space Ready for Tenant Fit-Out - 810002 1 0 27-Jul-2020 A 27-Jul-2020 A

ADMINISTRATIONADMINISTRATION 1674 1261 02-Dec-2019 A 26-Jun-2026

PROCUREMENTPROCUREMENT 1674 1261 02-Dec-2019 A 26-Jun-2026

PURCHASINGPURCHASING 270 0 06-Dec-2019 A 16-Dec-2020 A

PURC-02-0001 Award Excavation - Metro Earthworks 1 0 06-Dec-2019 A 06-Dec-2019 A

PURC-03-0001 Award Precast Concrete - Arban & Carosi 1 0 11-Dec-2019 A 11-Dec-2019 A

PURC-21-0000 Award Fire Suppression 1 0 19-Dec-2019 A 19-Dec-2019 A

PURC-09-0005 Award Access Flooring - Irvine 1 0 19-Dec-2019 A 19-Dec-2019 A

PURC-26-0004 Award Controls - Siemens 1 0 20-Dec-2019 A 20-Dec-2019 A

PURC-23-0000 Award Plumbing - Kirlin 1 0 24-Dec-2019 A 24-Dec-2019 A

PURC-02-4010 Award Concrete - Clark Concrete 1 0 30-Dec-2019 A 30-Dec-2019 A

PURC-05-0001 Award Miscellanious Metals - AIW 1 0 31-Dec-2019 A 31-Dec-2019 A

PURC-05-0002 Award Decorative Metals - AIW 1 0 31-Dec-2019 A 31-Dec-2019 A

PURC-10-0013 Award Folding Partitions - Modern Door 1 0 02-Jan-2020 A 08-Jan-2020 A

PURC-23-0001 Award Mechanical - Harris 1 0 07-Jan-2020 A 07-Jan-2020 A

PURC-10-0000 Award Fabric Wall Panels - Bost & Filtrex 1 0 08-Jan-2020 A 08-Jan-2020 A

PURC-26-0001 Award Electrical - MC Dean 1 0 08-Jan-2020 A 08-Jan-2020 A

PURC-02-0000 Award Building - Demolition 1 0 10-Jan-2020 A 28-Jan-2020 A

PURC-03-0000 Award Drilled Concrete Piers - Goettle 1 0 10-Jan-2020 A 10-Jan-2020 A

PURC-02-4000 Award Abatement - Potomac 1 0 10-Jan-2020 A 14-Feb-2020 A

PURC-03-0006 Award Ultra High Performance Concrete - Pillar 1 0 13-Jan-2020 A 13-Jan-2020 A

PURC-00-0000 Award Layout Surveying - Christopher Consultants 1 0 15-Jan-2020 A 15-Jan-2020 A

PURC-10-0001 Award Painting - NLP 1 0 15-Jan-2020 A 15-Jan-2020 A

PURC-04-0001 Award Stone Cladding - Bratti 1 0 15-Jan-2020 A 15-Jan-2020 A

PURC-07-0007 Award Expansion Joints - Andie Mac 1 0 17-Jan-2020 A 17-Jan-2020 A

PURC-09-0000 Award Drywall Buildings 9 & 10 - Rockspring 1 0 20-Jan-2020 A 29-Jan-2020 A

PURC-07-0001 Award Waterproofing - Andie Mac 1 0 21-Jan-2020 A 21-Jan-2020 A

PURC-07-0006 Award Joints And Sealants - Andie Mac 1 0 21-Jan-2020 A 21-Jan-2020 A

PURC-26-0002 Award Water Distribution - Total Engineering 1 0 22-Jan-2020 A 31-Jan-2020 A

PURC-26-0003 Award Underground Electrical Distribution - Benchmark 1 0 22-Jan-2020 A 22-Jan-2020 A

PURC-07-0002 Award Air Barrier - Cameron 1 0 23-Jan-2020 A 23-Jan-2020 A

PURC-09-0002 Award Resilient Flooring - Source One 1 0 28-Jan-2020 A 28-Jan-2020 A

PURC-02-4020 Award Support of Excavation - Clark Foundations 1 0 28-Jan-2020 A 29-Jan-2020 A

PURC-10-0002 Award Wall And Door Protection - Wall Protex 1 0 30-Jan-2020 A 30-Jan-2020 A

PURC-14-0000 Award Elevators - Delaware 1 0 30-Jan-2020 A 30-Jan-2020 A

PURC-08-0006 Award Glass And Glazing - Physical Security 1 0 30-Jan-2020 A 31-Jan-2020 A

PURC-07-0003 Award Metal Wall Panels - Vetro 1 0 30-Jan-2020 A 30-Jan-2020 A

PURC-23-0002 Award Testing And Balancing - Metro Test and Balance 1 0 07-Feb-2020 A 07-Feb-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Space Ready for Tenant Fit-Out - 810002

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

PURC-09-3000 Award Drywall Building C - Cleveland 1 0 12-Feb-2020 A 12-Feb-2020 A

PURC-01-0003 Award Project Photography - Preski 1 0 13-Feb-2020 A 13-Feb-2020 A

PURC-09-0004 Award Resinous Flooring - Capitol Finishes 1 0 19-Feb-2020 A 19-Feb-2020 A

PURC-1-1000 Purchasing Group Tier 1 0 0 28-Feb-2020 A

PURC-08-0004 Award Fire And Smoke Doors - Won-Door Corporation 1 0 02-Mar-2020 A 05-Mar-2020 A

PURC-00-0001 Award Noise And Vibration Monitoring - ECS 1 0 06-Mar-2020 A 06-Mar-2020 A

PURC-21-0001 Award Pneumatic Tube System - Pevco Systems 1 0 13-Mar-2020 A 13-Mar-2020 A

PURC-10-0005 Award Toilet Compartments - Material Distributors 1 0 16-Mar-2020 A 16-Mar-2020 A

PURC-10-0010 Award Toilet Accessories - Material Distributors 1 0 16-Mar-2020 A 16-Mar-2020 A

PURC-10-0011 Award Fire Extinguishers - Material Distributors 1 0 16-Mar-2020 A 16-Mar-2020 A

PURC-10-0003 Award Medical Equipment - ISEC 1 0 30-Mar-2020 A 11-May-2020 A

PURC-10-0006 Award Headwalls -AMICO 1 0 30-Mar-2020 A 15-May-2020 A

PURC-10-0007 Award Window Treatments - Goodman Brothers 1 0 30-Mar-2020 A 05-May-2020 A

PURC-10-0008 Award Medical Casework - ISEC 1 0 30-Mar-2020 A 11-May-2020 A

PURC-06-0002 Award Millwork - Jefferson 1 0 30-Mar-2020 A 09-Apr-2020 A

PURC-09-0003 Award Terrazzo Flooring - Roman Mosaic and Tile 1 0 30-Mar-2020 A 06-Apr-2020 A

PURC-03-0005 Award Aggregate Piers - Helitech 1 0 01-Apr-2020 A 01-Apr-2020 A

PURC-2.2-1010 Purchasing Group Tier 2.2 0 0 01-Apr-2020 A

PURC-10-0004 Award Signage 1 0 03-Apr-2020 A 03-Apr-2020 A

PURC-01-0004 Award Fall Protection 1 0 10-Apr-2020 A 30-Apr-2020 A

PURC-08-0000 Award Louvers 1 0 10-Apr-2020 A 24-Apr-2020 A

PURC-01-0002 Award 3rd Party Testing 1 0 24-Apr-2020 A 24-Apr-2020 A

PURC-05-0000 Award Reinforcing Steel 1 0 27-Apr-2020 A 27-Apr-2020 A

PURC-2.1-1000 Purchasing Group Tier 2.1 0 0 30-Apr-2020 A

PURC-3.2-1010 Purchasing Group Tier 3.2 0 0 30-Apr-2020 A

PURC-08-0002 Award Doors Frames And Hardware 1 0 30-Apr-2020 A 30-Apr-2020 A

PURC-08-0003 Award Overhead Coiling Doors 1 0 30-Apr-2020 A 30-Apr-2020 A

PURC-09-0001 Award Ceramic Tiling 1 0 01-May-2020 A 01-May-2020 A

PURC-04-0000 Award Masonry 1 0 12-May-2020 A 12-May-2020 A

PURC-08-0001 Award Interior Glazing 1 0 13-May-2020 A 13-May-2020 A

PURC-32-0001 Award Landscaping 1 0 20-May-2020 A 20-May-2020 A

PURC-32-0002 Award Site Paving 1 0 20-May-2020 A 20-May-2020 A

PURC-10-0012 Award Prefab Audiometric Rooms 1 0 02-Jun-2020 A 02-Jun-2020 A

PURC-07-0004 Award Roofing 1 0 02-Jun-2020 A 02-Jun-2020 A

PURC-08-0005 Award ICU Doors 1 0 02-Jun-2020 A 02-Jun-2020 A

PURC-10-0009 Award Auditorium Seating 1 0 05-Jun-2020 A 05-Jun-2020 A

PURC-3.1-1000 Purchasing Group Tier 3.1 0 0 15-Oct-2020 A

PURC-32-0000 Award Asphalt Paving 1 0 15-Oct-2020 A 15-Oct-2020 A

PURC-07-0005 Award Spray Fireproofing 1 0 15-Oct-2020 A 15-Oct-2020 A

PURC-3.3-1020 Purchasing Group Tier 3.3 0 0 16-Dec-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Purchasing Group Tier 3.1

Award Asphalt Paving

Award Spray Fireproofing

Purchasing Group Tier 3.3

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

PURC-06-0001 Award Rough Carpentry 1 0 16-Dec-2020 A 16-Dec-2020 A

BONDS / SUB BONDSBONDS / SUB BONDS 423 10 16-Dec-2019 A 15-Jul-2021

BOND-CCG-0000 Bond - Clark Construction Group 10 0 16-Dec-2019 A 27-Dec-2019 A

BOND-23-0000 Bond - Plumbing 10 0 06-Jan-2020 A 01-Apr-2020 A

BOND-21-0000 Bond - Fire Suppression 10 0 06-Jan-2020 A 28-Jan-2020 A

BOND-23-0001 Bond - Mechanical 10 0 07-Jan-2020 A 10-Jan-2020 A

BOND-26-0001 Bond - Electrical 10 0 09-Jan-2020 A 17-Jan-2020 A

BOND-03-0001 Bond - Precast Concrete Subcontractor 10 0 13-Jan-2020 A 01-Apr-2020 A

BOND-05-0001 Bond - Miscellanious Metals 10 0 13-Jan-2020 A 01-Apr-2020 A

BOND-05-0002 Bond - Decorative Metals (with Misc Metals) 10 0 13-Jan-2020 A 22-Jan-2020 A

BOND-26-0004 Bond - Controls 10 0 20-Jan-2020 A 01-Apr-2020 A

BOND-00-0000 Bond - Layout Surveying -UNDER 100K 10 0 20-Jan-2020 A 30-Jan-2020 A

BOND-03-0000 Bond - Drilled Concrete Piers 10 0 20-Jan-2020 A 30-Jan-2020 A

BOND-02-0001 Bond - Excavation Subcontractor-BOND WAIVER 10 0 20-Jan-2020 A 31-Jan-2020 A

BOND-09-0005 Bond - Access Flooring 10 0 20-Jan-2020 A 28-Jan-2020 A

BOND-10-0014 Bond - Folding Partitions 10 0 20-Jan-2020 A 30-Jan-2020 A

BOND-10-0001 Bond - Painting 10 0 22-Jan-2020 A 20-May-2020 A

BOND-03-0006 Bond - Ultra High Performance Concrete 10 0 03-Feb-2020 A 01-Apr-2020 A

BOND-10-0000 Bond - Fabric Wall Panels 10 0 05-Feb-2020 A 19-Feb-2020 A

BOND-23-0002 Bond - Testing And Balancing 10 0 07-Feb-2020 A 08-Feb-2020 A

BOND-09-0000 Bond - Drywall Building 9 & 10 10 0 11-Feb-2020 A 01-Apr-2020 A

BOND-07-0001 Bond - Waterproofing 10 0 14-Feb-2020 A 01-Apr-2020 A

BOND-07-0006 Bond - Joints And Sealants 10 0 14-Feb-2020 A 28-Feb-2020 A

BOND-07-0007 Bond - Expansion Joints 10 0 14-Feb-2020 A 28-Feb-2020 A

BOND-09-3000 Bond - Drywall Building C 10 0 24-Feb-2020 A 01-Apr-2020 A

BOND-26-0002 Bond - Water Distribution 10 0 02-Mar-2020 A 29-May-2020 A

BOND-08-0006 Bond - Glass And Glazing 10 0 03-Mar-2020 A 31-Mar-2020 A

BOND-04-0001 Bond - Stone Cladding 10 0 04-Mar-2020 A 29-May-2020 A

BOND-02-0000 Bond - Building Demolition 10 0 05-Mar-2020 A 15-Mar-2020 A

BOND-14-0000 Bond - Elevators 10 0 09-Mar-2020 A 08-May-2020 A

BOND-07-0003 Bond - Metal Wall Panels 10 0 09-Mar-2020 A 01-Apr-2020 A

BOND-02-4000 Bond - Building Abatement 10 0 13-Mar-2020 A 01-Apr-2020 A

BOND-10-0002 Bond - Wall And Door Protection 10 0 16-Mar-2020 A 08-May-2020 A

BOND-00-0001 Bond - Noise And Vibration Monitoring Subcontractor 10 0 23-Mar-2020 A 23-Mar-2020 A

BOND-21-0001 Bond - Pneumatic Tube System 10 0 24-Mar-2020 A 29-May-2020 A

BOND-26-0003 Bond - Underground Electrical Distribution 10 0 27-Mar-2020 A 29-May-2020 A

BOND-09-0002 Bond - Resilient Flooring 10 0 01-Apr-2020 A 01-Apr-2020 A

BOND-10-0005 Bond - Toilet Compartments 10 0 01-Apr-2020 A 13-Apr-2020 A

BOND-10-0010 Bond - Toilet Accessories 10 0 01-Apr-2020 A 13-Apr-2020 A

BOND-10-0011 Bond - Fire Extinguishers 10 0 01-Apr-2020 A 13-Apr-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Award Rough Carpentry

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

BOND-08-0004 Bond - Fire And Smoke Doors 10 0 09-Apr-2020 A 10-Jun-2020 A

BOND-03-0005 Bond - Aggregate Piers 10 0 01-May-2020 A 01-Aug-2020 A

BOND-01-0002 Bond - 3rd Party Testing 10 0 01-May-2020 A 01-Oct-2020 A

BOND-07-0002 Bond - Air Barrier 10 0 01-May-2020 A 15-Jul-2020 A

BOND-09-0003 Bond - Terrazzo Flooring 10 0 01-May-2020 A 08-May-2020 A

BOND-09-0004 Bond - Resinous Flooring 10 0 08-May-2020 A 15-May-2020 A

BOND-08-0003 Bond - Overhead Coiling Doors 10 0 10-Jun-2020 A 18-Sep-2020 A

BOND-10-0007 Bond - Window Treatments 10 0 10-Jun-2020 A 20-Aug-2020 A

BOND-10-0003 Bond - Medical Equipment and Casework 10 0 18-Jun-2020 A 18-Jun-2020 A

BOND-08-0002 Bond - Doors Frames And Hardware 10 0 20-Jun-2020 A 18-Sep-2020 A

BOND-09-0001 Bond - Ceramic Tiling 10 0 25-Jun-2020 A 30-Jul-2020 A

BOND-04-0000 Bond - Masonry 10 0 01-Jul-2020 A 31-Jul-2020 A

BOND-07-0004 Bond - Roofing 10 0 01-Jul-2020 A 20-Jul-2020 A

BOND-08-0000 Bond - Louvers 10 0 01-Jul-2020 A 31-Jul-2020 A

BOND-32-0001 Bond - Landscaping 10 0 01-Jul-2020 A 30-Mar-2021 A

BOND-01-0004 Bond - Fall Protection 10 0 05-Jul-2020 A 18-Sep-2020 A

BOND-05-0000 Bond - Reinforcing Steel 10 0 17-Jul-2020 A 15-Oct-2020 A

BOND-10-0009 Bond - Auditorium Seating 10 0 29-Jul-2020 A 29-Jul-2020 A

BOND-10-0008 Bond - Surgical Lights and Boom 10 0 03-Aug-2020 A 04-Aug-2020 A

BOND-08-0001 Bond - Interior Glazing 10 0 04-Aug-2020 A 01-Oct-2020 A

BOND-06-0002 Bond - Millwork 10 0 14-Aug-2020 A 14-Aug-2020 A

BOND-32-0002 Bond - Site Paving 10 0 01-Oct-2020 A 07-Oct-2020 A

BOND-10-0006 Bond - Headwalls 10 0 14-Oct-2020 A 26-Feb-2021 A

BOND-10-0012 Bond - Prefab Audiometric Rooms 10 0 02-Nov-2020 A 29-Jan-2021 A

BOND-07-0005 Bond - Spray Fireproofing 10 0 16-Nov-2020 A 30-Nov-2020 A

BOND-32-0000 Bond - Asphalt Paving 10 0 16-Nov-2020 A 30-Nov-2020 A

BOND-10-0004 Bond - Signage 10 0 01-Feb-2021 A 18-Feb-2021 A

BOND-06-0001 Bond - Rough Carpentry 10 0 01-Mar-2021 A 03-Mar-2021 A

BOND-05-0010 Bond - Additional Sub Bonds 10 10 01-Jun-2021 A 15-Jul-2021

BOND-08-0005 Bond - ICU Doors 10 10 01-Jul-2021 15-Jul-2021

SUBCONTRACTOR MOBILIZATIONSUBCONTRACTOR MOBILIZATION 981 578 13-Jan-2020 A 19-Oct-2023

MOB-23-0001 Assign Team - Mechanical 10 0 13-Jan-2020 A 24-Jan-2020 A

MOB-26-0001 Assign Team - Electrical & Mobilization for Enabling Work 10 0 20-Jan-2020 A 07-Feb-2020 A

MOB-09-0000 Assign Team - Drywall Building 9 & 10 10 0 20-Jan-2020 A 30-Jan-2020 A

MOB-26-2010 Assign Team - Concrete 10 0 27-Jan-2020 A 07-Feb-2020 A

MOB-23-0000 Assign Team - Plumbing Subcontractor 10 0 30-Jan-2020 A 28-Feb-2020 A

MOB-21-0000 Assign Team - Fire Suppression 10 0 03-Feb-2020 A 14-Feb-2020 A

MOB-05-0001 Assign Team - Miscellanious Metals 10 0 03-Feb-2020 A 14-Feb-2020 A

MOB-05-0002 Assign Team - Decorative Metals 10 0 03-Feb-2020 A 14-Feb-2020 A

MOB-02-4010 Assign Team - Support of Excavation -Clark Foundations 10 0 03-Feb-2020 A 14-Feb-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Bond - Overhead Coiling Doors

Bond - Doors Frames And Hardware

Bond - Landscaping

Bond - Reinforcing Steel

Bond - Headwalls

Bond - Prefab Audiometric Rooms

Bond - Spray Fireproofing

Bond - Asphalt Paving

Bond - Signage

Bond - Rough Carpentry

Bond - Additional Sub Bonds

Bond - ICU Doors

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

MOB-23-0002 Assign Team - Testing And Balancing 10 0 10-Feb-2020 A 21-Feb-2020 A

MOB-07-0003 Assign Team - Metal Wall Panels 10 0 10-Feb-2020 A 19-Feb-2020 A

MOB-02-0000 Assign Team - Building Demolition 2 0 11-Feb-2020 A 12-Feb-2020 A

MOB-26-0003 Assign Team - Underground Electrical Distribution 10 0 14-Feb-2020 A 14-Feb-2020 A

MOB-03-0006 Assign Team - Ultra High Performance Concrete 10 0 17-Feb-2020 A 28-Feb-2020 A

MOB-07-0001 Assign Team - Waterproofing 10 0 17-Feb-2020 A 28-Feb-2020 A

MOB-08-0006 Assign Team - Glass And Glazing 10 0 17-Feb-2020 A 27-Feb-2020 A

MOB-07-0006 Assign Team - Joints And Sealants 10 0 17-Feb-2020 A 28-Feb-2020 A

MOB-26-0002 Assign Team - Water Distribution 5 0 17-Feb-2020 A 21-Feb-2020 A

MOB-03-2010 Assign Team - Precast Concrete Subcontractor 10 0 17-Feb-2020 A 27-Feb-2020 A

MOB-03-0000 Assign Team - Drilled Concrete Pier Subcontractor 10 0 18-Feb-2020 A 26-Feb-2020 A

MOB-02-0001 Assign Team - Excavation Subcontractor 10 0 18-Feb-2020 A 26-Feb-2020 A

MOB-02-4000 Assign Team - Building Abatement 3 0 19-Feb-2020 A 21-Feb-2020 A

MOB-26-0004 Assign Team - Controls 10 0 24-Feb-2020 A 27-Feb-2020 A

MOB-00-0000 Assign Team - Layout Surveying Subcontractor 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-09-3000 Assign Team - Drywall Building C 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-00-0100 Assign Team - Early Cafeteria Work - Temporary Partitions 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-01-0003 Assign Team - Project Photography 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-07-0002 Assign Team - Air Barrier 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-07-0007 Assign Team - Expansion Joints 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-10-0000 Assign Team - Fabric Wall Panels 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-10-0001 Assign Team - Painting 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-09-0005 Assign Team - Access Flooring 10 0 02-Mar-2020 A 13-Mar-2020 A

MOB-04-0001 Assign Team - Stone Cladding 10 0 06-Mar-2020 A 19-Mar-2020 A

MOB-00-0001 Assign Team - Noise And Vibration Monitoring Subcontractor 10 0 01-Apr-2020 A 06-Apr-2020 A

MOB-10-0002 Assign Team - Wall And Door Protection 10 0 01-Apr-2020 A 03-Apr-2020 A

MOB-14-0000 Assign Team - Elevators 10 0 27-Apr-2020 A 20-May-2020 A

MOB-03-0005 Assign Team - Aggregate Piers 10 0 01-May-2020 A 15-May-2020 A

MOB-01-0002 Assign Team - 3rd Party Testing 10 0 01-May-2020 A 15-May-2020 A

MOB-21-0001 Assign Team - Pneumatic Tube System 10 0 01-May-2020 A 15-May-2020 A

MOB-09-0002 Assign Team - Resilient Flooring 10 0 01-May-2020 A 15-May-2020 A

MOB-09-0004 Assign Team - Resinous Flooring 10 0 01-May-2020 A 15-May-2020 A

MOB-05-0000 Assign Team - Reinforcing Steel 10 0 01-May-2020 A 15-May-2020 A

MOB-10-0004 Assign Team - Signage 10 0 01-May-2020 A 15-May-2020 A

MOB-10-0005 Assign Team - Toilet Compartments 10 0 01-May-2020 A 15-May-2020 A

MOB-10-0010 Assign Team - Toilet Accessories 10 0 01-May-2020 A 15-May-2020 A

MOB-MECH-1000 Cut/Cap Mobilization - Harris 20 0 01-May-2020 A 29-May-2020 A

MOB-10-0011 Assign Team - Fire Extinguishers 10 0 11-May-2020 A 20-May-2020 A

MOB-04-0000 Assign Team - Masonry 10 0 13-May-2020 A 15-May-2020 A

MOB-10-0007 Assign Team - Window Treatments 10 0 08-Jun-2020 A 18-Jun-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

MOB-09-0001 Assign Team - Ceramic Tiling 10 0 10-Jun-2020 A 10-Jun-2020 A

MOB-10-0003 Assign Team - Medical Equipment 10 0 10-Jun-2020 A 10-Jun-2020 A

MOB-10-0008 Assign Team - Medical Casework 10 0 22-Jun-2020 A 22-Jun-2020 A

MOB-32-0001 Assign Team - Landscaping 10 0 29-Jun-2020 A 30-Jun-2020 A

MOB-07-0004 Assign Team - Roofing 10 0 01-Jul-2020 A 01-Jul-2020 A

MOB-01-0004 Assign Team - Fall Protection 10 0 08-Jul-2020 A 15-Jul-2020 A

MOB-08-0000 Assign Team - Louvers 10 0 17-Jul-2020 A 17-Jul-2020 A

MOB-08-0001 Assign Team - Interior Glazing 10 0 01-Aug-2020 A 01-Aug-2020 A

MOB-08-0002 Assign Team - Doors / Frames / Hardware 10 0 01-Aug-2020 A 01-Aug-2020 A

MOB-08-0004 Assign Team - Fire And Smoke Doors 10 0 01-Aug-2020 A 01-Aug-2020 A

MOB-32-0002 Assign Team - Site Paving 10 0 01-Aug-2020 A 01-Aug-2020 A

MOB-26-0800 Assign Team - ABM Electrical for Electrical Equipment Testing 10 0 01-Aug-2020 A 01-Aug-2020 A

MOB-10-0009 Assign Team - Auditorium Seating 10 0 03-Aug-2020 A 14-Aug-2020 A

MOB-08-0003 Assign Team - Overhead Coiling Doors 10 0 09-Aug-2020 A 19-Aug-2020 A

MOB-MASN-1000 Mobilize Masonry Subcontractor 10 0 12-Aug-2020 A 23-Oct-2020 A

MOB-08-0005 Assign Team - ICU Doors 10 0 01-Sep-2020 A 11-Sep-2020 A

MOB-06-0002 Assign Team - Millwork 10 0 11-Sep-2020 A 16-Sep-2020 A

MOB-32-0000 Assign Team - Asphalt Paving 10 0 30-Sep-2020 A 09-Oct-2020 A

MOB-10-0012 Assign Team - Prefab Audiometric Rooms 10 0 01-Oct-2020 A 01-Oct-2020 A

MOB-10-0006 Assign Team - Headwalls 10 0 13-Oct-2020 A 16-Oct-2020 A

MOB-07-0005 Assign Team - Spray Fireproofing 10 0 15-Oct-2020 A 15-Oct-2020 A

MOB-06-0001 Assign Team - Rough Carpentry 10 0 04-Jan-2021 A 15-Jan-2021 A

MOB-CONC-1000 Mobilize Concrete 10 8 29-Jun-2021 A 13-Jul-2021

MOB-REINFSTEEL-1000 Mobilize Reinforcing Steel Subcontractor 10 7 29-Jun-2021 A 12-Jul-2021

MOB-03-0015 Mobilize - Helitech - Aggregate Piers 10 10 29-Jul-2021 11-Aug-2021

MOB-PRCST-1000 Mobilize Precast Concrete Subcontractor 10 10 07-Feb-2022 18-Feb-2022

MOB-26-0005 Mobilization for Controls 10 10 07-Jun-2022 20-Jun-2022

MOB-UHCP-1000 Mobilize Ultra High Performance Concrete 10 10 27-Jun-2022 11-Jul-2022

MOB-10-6623 Mobilize Terrazzo Flooring 30 30 07-Sep-2023 19-Oct-2023

SUBCONTRACTOR SUBMITTALS PREP & SUBMIT TO CLARKSUBCONTRACTOR SUBMITTALS PREP & SUBMIT TO CLARK 1445 1090 02-Dec-2019 A 28-Oct-2025

SUBM-01-1000 Prepare & Submit Project Startup 6 Month Schedule 65 0 02-Dec-2019 A 28-Feb-2020 A

SUBM-ACC-1010 Prepare & Submit Accident Prevention Plan 20 0 16-Dec-2019 A 07-Jan-2020 A

SUBM-22-1329 Prepare & Submit Sanitary Sewage Pumps 79 0 13-Jan-2020 A 25-Apr-2020 A

SUBM-IAQ-1010 Prepare & Submit IAQ Plan 20 0 20-Jan-2020 A 28-Feb-2020 A

SUBM-22-0070.4 Prepare & Submit Plumbing - Interceptors 40 0 31-Jan-2020 A 24-Mar-2020 A

SUBM-QC-1010 Prepare & Submit QC Plan 10 0 03-Feb-2020 A 14-Feb-2020 A

SUBM-PRIR2-1000 Priority Submittals - Group 2 0 0 03-Feb-2020 A

SUBM-07-1353 Prepare & Submit Membrane Waterproofing 30 0 04-Feb-2020 A 10-Mar-2020 A

SUBM-07-1400 Prepare & Submit Fluid Waterproofing 30 0 04-Feb-2020 A 29-May-2020 A

SUBM-07-1619 Prepare & Submit Metallic Oxide Waterproofing 30 0 04-Feb-2020 A 29-May-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Assign Team - Doors / Frames / Hardware

Assign Team - Fire And Smoke Doors

Assign Team - ABM Electrical for Electrical Equipment Testing

Assign Team - Overhead Coiling Doors

Mobilize Masonry Subcontractor

Assign Team - Asphalt Paving

Assign Team - Prefab Audiometric Rooms

Assign Team - Headwalls

Assign Team - Spray Fireproofing

Assign Team - Rough Carpentry

Mobilize Concrete

Mobilize Reinforcing Steel Subcontractor

Mobilize - Helitech - Aggregate Piers

Mobilize Precast Concrete Subcontractor

Mobilization for Controls

Mobilize Ultra High Performance Concrete

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

SUBM-07-1800 Prepare & Submit Traffic Coatings 30 0 04-Feb-2020 A 08-Jun-2020 A

SUBM-07-9200 Prepare & Submit Joint Sealants 20 0 04-Feb-2020 A 29-May-2020 A

SUBM-07-9313 Prepare & Submit Expansion Joints 40 0 04-Feb-2020 A 25-Sep-2020 A

SUBM-DEMO-1010 Prepare & Submit Demolition Plan 10 0 13-Feb-2020 A 27-Feb-2020 A

SUBM-07-4213.02 Prepare & Submit Metal Wall Panels MPS-1 Samples & PD 30 0 19-Feb-2020 A 31-Aug-2020 A

SUBM-07-4213.03 Prepare & Submit Recessed Flat Seam Panels MPS-2 Shop Drawings60 7 19-Feb-2020 A 12-Jul-2021

SUBM-07-4213.04 Prepare & Submit Recessed Flat Seam Panels MPS-2 Samples & PD30 0 19-Feb-2020 A 31-Aug-2020 A

SUBM-07-1000 Prepare & Submit Metal Wall Panels MPS-3 40 0 19-Feb-2020 A 01-Apr-2020 A

SUBM-07-4213.05 Prepare & Submit Metal Wall Cassette Panels Mwcps Shop Drawings60 7 19-Feb-2020 A 12-Jul-2021

SUBM-07-4213.06 Prepare & Submit Metal Wall Cassette Panels Mwcps Samples & PD30 0 19-Feb-2020 A 31-Aug-2020 A

SUBM-07-4253.1 Prepare & Submit Rain Screen Attachement Shop Drawings 50 0 19-Feb-2020 A 25-Sep-2020 A

SUBM-07-4253.2 Prepare & Submit Rain Screen Attachement Samples & PD 30 0 19-Feb-2020 A 31-Aug-2020 A

SUBM-07-4201 Prepare & Submit Skylights Shop drawings 60 0 19-Feb-2020 A 21-Jul-2020 A

SUBM-07-MU Prepare & Submit Recessed Flat Seam Panels MPS-2 Mock up drawings30 0 19-Feb-2020 A 28-Feb-2021 A

SUBM-08-4400.1 Prepare & Submit Curtainwall Shop Drawings 80 1 20-Feb-2020 A 01-Jul-2021

SUBM-08-4400.2 Prepare & Submit Curtainwall Shop Samples & PD 80 0 20-Feb-2020 A 05-Nov-2020 A

SUBM-08-4400.3 Prepare & Submit Curtainwall Mockup Shop Drawings 40 0 20-Feb-2020 A 21-Dec-2020 A

SUBM-08-8100.1 Prepare & Submit Punch Window Shop Drawings 60 0 20-Feb-2020 A 15-Jun-2021 A

SUBM-08-8100.2 Prepare & Submit Punch Window Samples & PD 60 0 20-Feb-2020 A 05-Nov-2020 A

SUBM-08-8100.3 Prepare & Submit Punch Window Mockup Shop Drawings 40 0 20-Feb-2020 A 21-Dec-2020 A

SUBM-04-4200.2 Prepare & Submit Stone Cladding Samples & PD 25 0 21-Feb-2020 A 30-Jun-2020 A

SUBM-VIB-1010 Prepare & Submit Noise And Vibration Plan 25 0 24-Feb-2020 A 06-Apr-2020 A

SUBM-ABATE-1000 Prepare & Submit Abatement 30 0 24-Feb-2020 A 20-Mar-2020 A

SUBM-07-2727 Prepare & Submit Air Barrier - Enabling Work 30 0 02-Mar-2020 A 31-Mar-2020 A

SUBM-01-9115.3 Prepare & Submit Precast Mockup Shop Drawings 50 0 02-Mar-2020 A 14-Jan-2021 A

SUBM-05-1200.1 Prepare & Submit Structural Welding 20 0 02-Mar-2020 A 14-Aug-2020 A

SUBM-05-1200.2 Prepare & Submit Structural Steel 40 0 02-Mar-2020 A 31-Aug-2020 A

SUBM-05-3000 Prepare & Submit Steel Decks 40 0 02-Mar-2020 A 30-Jun-2020 A

SUBM-07-4247 Prepare & Submit Ultra High Performance Concrete Panels 60 0 02-Mar-2020 A 30-Jun-2020 A

SUBM-26-0923.1 Prepare & Submit Lighting Control Systems - Line Voltage Devices100 0 02-Mar-2020 A 27-Jul-2020 A

SUBM-26-0923.2 Prepare & Submit Lighting Control Systems - Low Voltage Devices100 0 02-Mar-2020 A 22-Jul-2020 A

SUBM-26-0923.3 Prepare & Submit Lighting Control Systems - Software 100 0 02-Mar-2020 A 29-Jul-2020 A

SUBM-26-1113 Prepare & Submit Medium Voltage Switchgear 100 0 02-Mar-2020 A 26-May-2020 A

SUBM-26-1116 Prepare & Submit Secondary Unit Substations 80 0 02-Mar-2020 A 28-May-2020 A

SUBM-26-2000.1 Prepare & Submit Interior Power Distribution - Panels 80 0 02-Mar-2020 A 29-Jul-2020 A

SUBM-26-2000.2 Prepare & Submit Interior Power Distribution - Transformers 80 0 02-Mar-2020 A 29-Jul-2020 A

SUBM-26-2000.3 Prepare & Submit Interior Power Distribution - Busway 80 0 02-Mar-2020 A 29-Jul-2020 A

SUBM-26-2000.4 Prepare & Submit Interior Power Distribution - Cable Trays / Runways & Trough80 0 02-Mar-2020 A 01-Apr-2020 A

SUBM-26-2000.5 Prepare & Submit Interior Power Distribution - Wireway 80 0 02-Mar-2020 A 01-Apr-2020 A

SUBM-26-2000.6 Prepare & Submit Interior Power Distribution - Receptacles 40 0 02-Mar-2020 A 01-Apr-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Prepare & Submit Expansion Joints

Prepare & Submit Metal Wall Panels MPS-1 Samples & PD

Prepare & Submit Recessed Flat Seam Panels MPS-2 Shop Drawings

Prepare & Submit Recessed Flat Seam Panels MPS-2 Samples & PD

Prepare & Submit Metal Wall Cassette Panels Mwcps Shop Drawings

Prepare & Submit Metal Wall Cassette Panels Mwcps Samples & PD

Prepare & Submit Rain Screen Attachement Shop Drawings

Prepare & Submit Rain Screen Attachement Samples & PD

Prepare & Submit Skylights Shop drawings

Prepare & Submit Recessed Flat Seam Panels MPS-2 Mock up drawings

Prepare & Submit Curtainwall Shop Drawings

Prepare & Submit Curtainwall Shop Samples & PD

Prepare & Submit Curtainwall Mockup Shop Drawings

Prepare & Submit Punch Window Shop Drawings

Prepare & Submit Punch Window Samples & PD

Prepare & Submit Punch Window Mockup Shop Drawings

Prepare & Submit Stone Cladding Samples & PD

Prepare & Submit Precast Mockup Shop Drawings

Prepare & Submit Structural Welding

Prepare & Submit Structural Steel

Prepare & Submit Ultra High Performance Concrete Panels

Prepare & Submit Lighting Control Systems - Line Voltage Devices

Prepare & Submit Lighting Control Systems - Low Voltage Devices

Prepare & Submit Lighting Control Systems - Software

Prepare & Submit Interior Power Distribution - Panels

Prepare & Submit Interior Power Distribution - Transformers

Prepare & Submit Interior Power Distribution - Busway

Prepare & Submit Interior Power Distribution - Cable Trays / Runways & Trough

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

SUBM-26-2000.7 Prepare & Submit Interior Power Distribution - Switches 40 0 02-Mar-2020 A 01-Apr-2020 A

SUBM-26-2001 Prepare & Submit Isolated Power Panels 40 0 02-Mar-2020 A 28-May-2020 A

SUBM-26-2300 Prepare & Submit Low Voltage Switch Gear 100 0 02-Mar-2020 A 21-Aug-2020 A

SUBM-26-2313 Prepare & Submit Paralleling Low Voltage Switch Gear 100 0 02-Mar-2020 A 26-Aug-2020 A

SUBM-26-2413 Prepare & Submit Switchboards 100 0 02-Mar-2020 A 27-Jul-2020 A

SUBM-26-2714 Prepare & Submit Electric Meters 100 0 02-Mar-2020 A 21-May-2020 A

SUBM-26-2923 Prepare & Submit VFD Systems 100 0 02-Mar-2020 A 25-May-2020 A

SUBM-26-3353 Prepare & Submit Static Uninterruptible Power Supply (UPS) 100 0 02-Mar-2020 A 28-May-2020 A

SUBM-26-3623 Prepare & Submit Automatic Transfer Switches 100 0 02-Mar-2020 A 12-Aug-2020 A

SUBM-26-4100 Prepare & Submit Lighting Protection System 80 0 02-Mar-2020 A 27-May-2020 A

SUBM-26-5100 Prepare & Submit Interior Lighting Fixtures 60 0 02-Mar-2020 A 29-Jul-2020 A

SUBM-26-5600.2 Prepare & Submit Exterior Lighting - Photometric Plan 60 0 02-Mar-2020 A 26-May-2020 A

SUBM-26-6513 Prepare & Submit Snow Melt System 60 0 02-Mar-2020 A 01-Apr-2020 A

SUBM-27-0513 Prepare & Submit Transponder System 80 0 02-Mar-2020 A 28-May-2020 A

SUBM-27-1000.1 Prepare & Submit Building Telecommunications - Cabling 80 0 02-Mar-2020 A 01-Apr-2020 A

SUBM-27-1000.2 Prepare & Submit Building Telecommunications - Panels 80 0 02-Mar-2020 A 28-May-2020 A

SUBM-27-1000 Prepare & Submit Building Telecommunications System 80 0 02-Mar-2020 A 28-May-2020 A

SUBM-27-5113.3 Prepare & Submit Radio Paging System 80 0 02-Mar-2020 A 28-May-2020 A

SUBM-27-5116 Prepare & Submit Radio And Public Address Sytem 80 0 02-Mar-2020 A 28-May-2020 A

SUBM-27-5223 Prepare & Submit Nurse Call System 80 0 02-Mar-2020 A 28-May-2020 A

SUBM-28-2000.1 Prepare & Submit Electronic Security Systems (ESS) 100 0 02-Mar-2020 A 22-May-2020 A

SUBM-28-2000.2 Prepare & Submit Electronic Security Systems (ESS) - Infant Protection System100 0 02-Mar-2020 A 29-Jul-2020 A

SUBM-28-2000.3 Prepare & Submit Electronic Security Systems (ESS) - Elevator Interface100 0 02-Mar-2020 A 26-May-2020 A

SUBM-28-2000.4 Prepare & Submit Electronic Security Systems (ESS) - Backup Battery100 0 02-Mar-2020 A 26-May-2020 A

SUBM-28-3176.1 Prepare & Submit Interior Fire Alarm System 100 0 02-Mar-2020 A 05-Jun-2020 A

SUBM-28-3176.2 Prepare & Submit Interior Fire Alarm System - Wiring Diagrams100 0 02-Mar-2020 A 10-Sep-2020 A

SUBM-28-3176.3 Prepare & Submit Interior Fire Alarm System - System Layout 100 0 02-Mar-2020 A 10-Sep-2020 A

SUBM-33-4616 Prepare & Submit Subdrainage 40 0 02-Mar-2020 A 01-Jun-2020 A

SUBM-PRIR1-1000 Priority Submittals - Group 1 0 0 02-Mar-2020 A

PREENG-GLAS-1060 Pre-Engineering Profile Documents for Blast Doors 20 0 02-Mar-2020 A 15-Dec-2020 A

SUBM-UHPC-1010 Prepare & Submit UHPC Shop Drawings 40 0 02-Mar-2020 A 30-Jun-2020 A

SUBM-05-5013 Prepare & Submit Miscellaneous Metals 49 0 02-Mar-2020 A 19-May-2020 A

SUBM-33-5115 Prepare & Submit Natural Gas, Liquid Petroleum Gas Distribution20 0 03-Mar-2020 A 03-Mar-2020 A

SUBM-02-4291 Prepare & Submit Historic Salvage Plan-Stained Glass 20 0 05-Mar-2020 A 05-Oct-2020 A

SUBM-08-6045 Prepare & Submit Skylights 50 0 05-Mar-2020 A 31-Aug-2020 A

SUBM-08-8856 Prepare & Submit Blast Resistant Glazing 60 25 05-Mar-2020 A 05-Aug-2021

SUBM-03-4500.1 Prepare & Submit Precast Shop Drawings 60 0 09-Mar-2020 A 11-Aug-2020 A

SUBM-03-4500.2 Prepare & Submit Precast Samples & PD 30 0 09-Mar-2020 A 31-Mar-2020 A

SUBM-21-3000 Prepare & Submit Fire Pumps 20 0 09-Mar-2020 A 20-May-2020 A

SUBM-22-0070.7 Prepare & Submit Plumbing - Vibration Absorbing Features 80 0 09-Mar-2020 A 24-Mar-2020 A

Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug

2021 2022

Prepare & Submit Low Voltage Switch Gear

Prepare & Submit Paralleling Low Voltage Switch Gear

Prepare & Submit Static Uninterruptible Power Supply (UPS)

Prepare & Submit Automatic Transfer Switches

Prepare & Submit Interior Lighting Fixtures

Prepare & Submit Exterior Lighting - Photometric Plan

Prepare & Submit Building Telecommunications - Panels

Prepare & Submit Building Telecommunications System

Prepare & Submit Radio And Public Address Sytem

Prepare & Submit Electronic Security Systems (ESS)

Prepare & Submit Electronic Security Systems (ESS) - Infant Protection System

Prepare & Submit Electronic Security Systems (ESS) - Elevator Interface

Prepare & Submit Electronic Security Systems (ESS) - Backup Battery

Prepare & Submit Interior Fire Alarm System - Wiring Diagrams

Prepare & Submit Interior Fire Alarm System - System Layout

Pre-Engineering Profile Documents for Blast Doors

Prepare & Submit Historic Salvage Plan-Stained Glass

Prepare & Submit Blast Resistant Glazing

Prepare & Submit Precast Shop Drawings

Remaining Level of Effort

Actual Level of Effort

Actual Work

Remaining Work

Critical Remaining Work

Milestone WALTER REED P-114 - June 2021 Update - NAVFAC SUBMISSION

Remaining Duration

Start Finish

SUBM-22-0700 Prepare & Submit Thermal Insulation For Plumbing 80 0 09-Mar-2020 A 09-Mar-2020 A

SUBM-22-6070.1 Prepare & Submit Gas And Vacuum Systems - Dental Gas 80 0 09-Mar-2020 A 30-May-2020 A

SUBM-22-6070.3 Prepare & Submit Gas And Vacuum Systems - Components 80 0 09-Mar-2020 A 24-Mar-2020 A

SUBM-23-0515 Prepare & Submit HVAC Piping 80 0 09-Mar-2020 A 29-May-2020 A

SUBM-23-0548 Prepare & Submit Vibraiton And Seismic Controls For HVAC 80 0 09-Mar-2020 A 19-Jun-2020 A

SUBM-23-1125.1 Prepare & Submit Gas Piping System Shop Drawings 80 15 09-Mar-2020 A 22-Jul-2021

SUBM-23-1125.2 Prepare & Submit Gas Piping Regulators 80 0 09-Mar-2020 A 06-Apr-2020 A

SUBM-23-1125.3 Prepare & Submit Gas Piping Valves 80 0 09-Mar-2020 A 08-May-2020 A

SUBM-23-1125.4 Prepare & Submit Gas Pipe Welding 80 0 09-Mar-2020 A 14-Jun-2020 A

SUBM-23-2226.1 Prepare & Submit Steam System 80 0 09-Mar-2020 A 26-May-2020 A

SUBM-23-2226.3 Prepare & Submit Steam System - Valves 80 0 09-Mar-2020 A 30-May-2020 A

SUBM-23-6426 Prepare & Submit Chilled Water 80 0 09-Mar-2020 A 26-May-2020 A

SUBM-33-1100 Prepare & Submit Water Distribution 20 0 09-Mar-2020 A 24-Apr-2020 A

SUBM-33-3000 Prepare & Submit Sanitary Sewers 20 0 09-Mar-2020 A 17-Apr-2020 A

SUBM-33-4000 Prepare & Submit Storm Drainage 20 0 09-Mar-2020 A 01-Jun-2020 A

SUBM-02-1050 Prepare & Submit Support of Excavation Shop Drawings 20 0 11-Mar-2020 A…