About this file

This pre-solicitation notice concerns a firm-fixed price initial outfitting and transition supply contract for medical center additions and alterations at the Naval Support Activity Bethesda Campus in Bethesda, Maryland. The contract involves relocating equipment and transitioning personnel from buildings scheduled for demolition to new construction and renovated facilities. Services include outfitting, transitioning, commissioning, excess property disposal, and temporary facility relocation. The project architect is HDR and construction contractor is CLARK Construction, administered by NAVFAC Washington and USACE Little Rock. The estimated contract period is 1870 days following award. The solicitation is expected to post on February 1, 2022 but timelines remain flexible. The acquisition is a Service-Disabled Veteran Owned Small Business set-aside.

View the file

Other files

File Type Posted
Draft Solicitation 27January2022.pdf PDF
Attachment 65a - Log Cat A Binder Set 2 2018 0118_Part1.pdf PDF
Attachment 66b - Log Cat C Binder_Part2.pdf PDF
Attachment 66c - Log Cat C Binder_Part3.pdf PDF
Attachment 65b - Log Cat A Binder Set 2 2018 0118_Part2.pdf PDF
Attachment 66d - Log Cat C Binder_Part4.pdf PDF
Attachment 66a - Log Cat C Binder_Part1.pdf PDF
Attachment 29 - B.08.02_DMLSS P1 DCAA.xls XLS spreadsheet
Attachment 19 - BLDG 10 FLOOR PLAN SET.pdf PDF
Attachment 23 - CID Supporting Documents Redacted.pdf PDF
Attachment 52 - DMLSS P2-3 BHDA01.xls XLS spreadsheet
Attachment 40 - DMLSS P1 OB GYN3.xls XLS spreadsheet
Attachment 26 - Design Analysis 65Percent Basis of Design.pdf PDF
Attachment 9 - 1171746drwg600021.pdf PDF
Attachment 68 - Log Cat R Binder.pdf PDF
Attachment 57 - DMLSS P2-3 EBFA00 HC.xls XLS spreadsheet
Attachment 36 - DMLSS P1 METERNAL.xls XLS spreadsheet
Attachment 83 - Updated Artwork Package.pdf PDF
Draft Solicitation 22R6001.pdf PDF
Attachment 72 - MCAA PHASE 1_28OCT21 Redated V4.xlsx XLSX spreadsheet
Attachment 75 - MilCon Pre-Bid Site Visit Presentation for Construction Contractors (June 2019).pdf PDF
Attachment 54 - DMLSS P2-3 BLAA00 PI.xls XLS spreadsheet
Attachment 8 - 1171746drwg60007I.pdf PDF
Attachment 3 - GC Schedule 113782 - June 2021 - Full WBS.pdf PDF
Attachment 41 - DMLSS P1 PRIMARY.xls XLS spreadsheet
Attachment 17 - BLDG 07 FLOOR PLAN SET.pdf PDF
Attachment 81 - SECNAV_5512_1_11787 APPROVED AC PASS ID FORM 05282014.pdf PDF
Attachment 46 - DMLSS P2-3 BBDA01.xls XLS spreadsheet
Attachment 53 - DMLSS P2-3 BHGA00.xls XLS spreadsheet
Attachment 50 - DMLSS P2-3 BHAAWW.xls XLS spreadsheet
Attachment 51 - DMLSS P2-3 BHCA00.xls XLS spreadsheet
Attachment 84 - Wayfinding and Signage.docx DOCX document
Attachment 15 - BLDG 02 FLOOR PLAN SET.pdf PDF
Attachment 49 - DMLSS P2-3 BFFA00.xls XLS spreadsheet
Attachment 6 - 1171746drwg60005.pdf PDF
Attachment 16 - B.08.02_BLDG 05 FLOOR PLAN SET.pdf PDF
Attachment 55 - DMLSS P2-3 BLBA00 OC.xls XLS spreadsheet
Attachment 20 - BLDG 84T_FLOOR PLAN SET_20130111.pdf PDF
Attachment 11 - 20201130 PFD WR MCAA BLDG 9-10.pdf PDF
Attachment 25 - DBIDs-Process-Guide.pdf PDF
Attachment 62 - DMLSS Phase 1 OBGYN.xls XLS spreadsheet
Attachment 21 - BLDG 85T OUTPT MED FAC OVERALL 2.pdf PDF
Attachment 4 - 1171746drwg60001.pdf PDF
Attachment 22 - BLDG 85T OUTPT MED FAC OVERALL.pdf PDF
Attachment 12 - 20201135 PFD WR MCAA BLDG C.pdf PDF
Attachment 77 - NSA-Bethesda Installation and Maps.pdf PDF
Attachment 70 - MCAA IOR Weekly Risk Report Template.xlsx XLSX spreadsheet
Attachment 27 - DMLSS P1 ANESTHESIA.xls XLS spreadsheet
Attachment 45 - DMLSS P2-3 BBDA00.xls XLS spreadsheet
Attachment 82 - Submittal Examples.pdf PDF
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .