PO-75 LaBranch Marsh Creation, Louisiana
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12FPC323R0001
- Agency
- Farm Production and Conservation Department of Agriculture
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Norco, Louisiana, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a firm fixed-price construction contract to restore approximately 1,200 acres of marshland and create 6,540 linear feet of tidal creeks in St. Charles Parish, Louisiana. The Department of Agriculture Under Secretary for Farm Production and Conservation will evaluate proposals based on technical qualifications and past performance. Proposals are due by February 17, 2023 for the PO-75 LaBranch Marsh Creation project. The selected contractor shall complete all work within 524 calendar days of the notice to proceed.
There is no set-aside designation. The primary NAICS code is 237990 and PSC code Y2G0. The incumbent contractor is unknown. The place of performance is Norco, Louisiana, and the contract value is estimated at $12 million. The contractor will dredge over 6 million cubic yards of material from Lake Pontchartrain to restore 1,200 acres of previously converted marshland and excavate 39 tidal ponds totaling 6,540 linear feet, completing all work within 524 days.
Notice text
3 versions
Update #3 · Latest ·
Amedment 03 - Provides 30 attachments to the SF30 Amendment of Solicitation form to include (1) Question and Response document, (2) Sign in from Site Visit, (3) Revised Pricing Schedule, (4) Revised Construction Specifications 21 (5) Revised Construction Specification 421; (6) Geotechnical Reports, (7) Magnetometer surveys and reports, (8) Scenic River Permit and (9) USCOE Permits. See Attachment S01 12FPC323R0001 AM03 and referenced attachments.
Amendment 02 - Provided a revised pricing schedule and established date for receipt of questions. See Attachment S01 12FPC323R0001 AM02
Amendment 01 - Provided a revised solicitation package removing and adding clauses. See Attachment S01 12FPC323R0001 AM01
PO-75 LaBranch Marsh Creation, Lousiana
The project’s goal is to restore marsh that has been converted to open water. Project implementation will result in an increase of wildlife and fisheries habitat, acreage and diversity, along with improving water quality. In addition, the project will provide a storm buffer protection to Interstate 10 (I-10), the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area. The project features consist of the creation of 1,200 acres of marsh using dedicated dredging from Lake Pontchartrain. In addition, 6,540 linear feet of tidal creeks will be created. Located in St Charles Parrish, closest City is Norco, Louisiana.
A firm fixed price construction contract is anticipated. Performance time is 524 calendar days from from the issuance of the Notice to Proceed (NTP).
This requirement is Unrestricted, a subcontracting plan will be required prior to award by the successful offeror if the offeror is other than small business.
Update #2 ·
PO-75 LaBranch Marsh Creation, Lousiana
The project’s goal is to restore marsh that has been converted to open water. Project implementation will result in an increase of wildlife and fisheries habitat, acreage and diversity, along with improving water quality. In addition, the project will provide a storm buffer protection to Interstate 10 (I-10), the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area. The project features consist of the creation of 1,200 acres of marsh using dedicated dredging from Lake Pontchartrain. In addition, 6,540 linear feet of tidal creeks will be created. Located in St Charles Parrish, closest City is Norco, Louisiana.
A firm fixed price construction contract is anticipated. Performance time is 524 calendar days from from the issuance of the Notice to Proceed (NTP).
This requirement is Unrestricted, a subcontracting plan will be required prior to award by the successful offeror if the offeror is other than small business.
Update #1 ·
PO-75 LaBranch Marsh Creation, Lousiana
The project’s goal is to restore marsh that has been converted to open water. Project implementation will result in an increase of wildlife and fisheries habitat, acreage and diversity, along with improving water quality. In addition, the project will provide a storm buffer protection to Interstate 10 (I-10), the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area. The project features consist of the creation of 1,200 acres of marsh using dedicated dredging from Lake Pontchartrain. In addition, 6,540 linear feet of tidal creeks will be created. Located in St Charles Parrish, closest City is Norco, Louisiana.
A firm fixed price construction contract is anticipated. Performance time is 524 calendar days from from the issuance of the Notice to Proceed (NTP).
Attachments
Show all 39
Notice history
| Notice | Type | Posted |
|---|---|---|
| PO-75 LaBranch Marsh Creation, Louisiana | Award Notice | |
| PO-75 LaBranch Marsh Creation, Louisiana | Solicitation | |
| PO-75 LaBranch Marsh Creation, Louisiana | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity