PO-75 LaBranch Marsh Creation, Louisiana

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
12FPC323R0001
Agency
Farm Production and Conservation Department of Agriculture
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1KZ Construction Of Other Conservation And Development Facilities
Place of performance
Norco, Louisiana, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a firm fixed-price construction contract to restore approximately 1,200 acres of marshland and create 6,540 linear feet of tidal creeks in St. Charles Parish, Louisiana. The Department of Agriculture Under Secretary for Farm Production and Conservation will evaluate proposals based on technical qualifications and past performance. Proposals are due by February 17, 2023 for the PO-75 LaBranch Marsh Creation project. The selected contractor shall complete all work within 524 calendar days of the notice to proceed.

There is no set-aside designation. The primary NAICS code is 237990 and PSC code Y2G0. The incumbent contractor is unknown. The place of performance is Norco, Louisiana, and the contract value is estimated at $12 million. The contractor will dredge over 6 million cubic yards of material from Lake Pontchartrain to restore 1,200 acres of previously converted marshland and excavate 39 tidal ponds totaling 6,540 linear feet, completing all work within 524 days.

Notice text

3 versions

Update #3 · Latest ·

Amedment 03 -  Provides 30 attachments to the SF30 Amendment of Solicitation form to include  (1) Question and Response document, (2) Sign in from Site Visit, (3) Revised Pricing Schedule, (4) Revised Construction Specifications 21 (5) Revised Construction Specification 421; (6) Geotechnical Reports, (7) Magnetometer surveys and reports, (8) Scenic River Permit and (9) USCOE Permits. See Attachment S01 12FPC323R0001 AM03 and referenced attachments.

Amendment 02 - Provided a revised pricing schedule and established date for receipt of questions.  See Attachment S01 12FPC323R0001 AM02

Amendment 01 - Provided a revised solicitation package removing and adding clauses.  See Attachment S01 12FPC323R0001 AM01

PO-75 LaBranch Marsh Creation, Lousiana

The project’s goal is to restore marsh that has been converted to open water. Project implementation will result in an increase of wildlife and fisheries habitat, acreage and diversity, along with improving water quality. In addition, the project will provide a storm buffer protection to Interstate 10 (I-10), the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area. The project features consist of the creation of 1,200 acres of marsh using dedicated dredging from Lake Pontchartrain. In addition, 6,540 linear feet of tidal creeks will be created. Located in St Charles Parrish, closest City is Norco, Louisiana. 

A firm fixed price construction contract is anticipated. Performance time is 524 calendar days from from the issuance of the Notice to Proceed (NTP).

This requirement is Unrestricted, a subcontracting plan will be required prior to award by the successful offeror if the offeror is other than small business. 

Update #2 ·

PO-75 LaBranch Marsh Creation, Lousiana

The project’s goal is to restore marsh that has been converted to open water. Project implementation will result in an increase of wildlife and fisheries habitat, acreage and diversity, along with improving water quality. In addition, the project will provide a storm buffer protection to Interstate 10 (I-10), the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area. The project features consist of the creation of 1,200 acres of marsh using dedicated dredging from Lake Pontchartrain. In addition, 6,540 linear feet of tidal creeks will be created. Located in St Charles Parrish, closest City is Norco, Louisiana. 

A firm fixed price construction contract is anticipated. Performance time is 524 calendar days from from the issuance of the Notice to Proceed (NTP).

This requirement is Unrestricted, a subcontracting plan will be required prior to award by the successful offeror if the offeror is other than small business. 

Update #1 ·

PO-75 LaBranch Marsh Creation, Lousiana

The project’s goal is to restore marsh that has been converted to open water. Project implementation will result in an increase of wildlife and fisheries habitat, acreage and diversity, along with improving water quality. In addition, the project will provide a storm buffer protection to Interstate 10 (I-10), the region’s primary westward hurricane evacuation route, and complement hurricane protection measures in the area. The project features consist of the creation of 1,200 acres of marsh using dedicated dredging from Lake Pontchartrain. In addition, 6,540 linear feet of tidal creeks will be created. Located in St Charles Parrish, closest City is Norco, Louisiana. 

A firm fixed price construction contract is anticipated. Performance time is 524 calendar days from from the issuance of the Notice to Proceed (NTP).

Attachments

Files attached to this notice, newest first
File Type Posted
S01 12FPC323R0001 AM04.pdf PDF
S01 12FPC323R0001 AM04.pdf PDF
6. PO-75 MCBA Geotechnical Report 12.1.2011.pdf PDF
7.1 PO75 100408 1 - Marsh Creation Topo.pdf PDF
7.1 PO75 100408 2 - Ave Marsh Elevations.pdf PDF
7.1 PO75 100408 4-19 Marsh Creation Cross Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half - full size).pdf PDF
7.4 PO-133-Mag Survey of Access-Drawings.pdf PDF
7.4 PO-133-Mag Survey_Report.pdf PDF
9. PO-133 USCOE - MVN-2012-1081-2-EPP PERMIT.pdf PDF
S01 12FPC323R0001 AM03.pdf PDF
1. LaBranche Marsh Creation Project (PO-75) - Questions & Responses.pdf PDF
5. Revised Construction Spec 421 - ECD for Marsh Creation - Amend 3 - Jan 2023.pdf PDF
7.1 PO75 100408 3 - MC Utility & Boring Locations.pdf PDF
7.2 PO75 100408 2-6 - Borrow Area Cross Sections.pdf PDF
7.3 PO75 100408 3 - Borrow Area Magnetic Contours.pdf PDF
2. Site Showing Sign-in PO-75 18Jan2023.pdf PDF
3. Revised Schedule of Pricing 12FPC323R0001 AM03.pdf PDF
6. PO-75 Geotechnical Report Revised 5.26.2017.pdf PDF
7. PO75 100408 Survey Report.pdf PDF
7. PO75 Benchmark Datasheet.pdf PDF
7.2 PO75 100408 1 - Borrow Area Bathymetric Survey Plan View.pdf PDF
7.3 PO75 100408 4 - Borrow Area Mag Gamma Table.pdf PDF
9. PO-75 USCOE - MVN-2012-1081-EPP PERMIT.pdf PDF
4. Revised Construction Spec 21 - Excavation - Amend 3 - Jan 2023.pdf PDF
6. PO-133 Geotechnical Report 4.11.2014.pdf PDF
7. Labranche East Marsh Creation - Complete Drawing Set.pdf PDF
7.1 PO75 100408 20-25 - SDL and SCD Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half - full size).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half).pdf PDF
8. PO-75 Scenic River Permit #1178.pdf PDF
S01 12FPC323R0001 AM02.pdf PDF
S01 12FPC323R0001 AM01.pdf PDF
S01 Attachment 1 Specifications - July 2022revised.pdf PDF
S01 12FPC323R0001.pdf PDF
S01 Attachment 3 Wage Determinations.pdf PDF
S01 Attachment 4 Past Performance Questionnaire.docx DOCX document
S01 Attachment 2 Drawings.pdf PDF
Show all 39

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
PO-75 LaBranch Marsh Creation, Louisiana Award Award Notice
PO-75 LaBranch Marsh Creation, Louisiana This notice · Latest solicitation Solicitation
PO-75 LaBranch Marsh Creation, Louisiana Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity