PO-75 LaBranch Marsh Creation, Louisiana Federal contract opportunity
Solicitation number
12FPC323R0001
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This document provides details for a federal construction contract solicitation for the PO-75 LaBranch Marsh Creation project in Louisiana. The solicitation seeks fixed-price bids for the restoration of 1,200 acres of marsh through dedicated dredging from Lake Pontchartrain and the creation of 6,540 linear feet of tidal creeks. Bids are due on February 17, 2023. The performance period is 524 calendar days from notice to proceed. The project goal is to restore previously converted marshland and improve wildlife habitat, fisheries, water quality, and storm protection for Interstate 10. Additional files include geotechnical reports, magnetometer surveys, permits from the Scenic Rivers program and Army Corps of Engineers.

View the file

Other files for this federal contract opportunity

Other files attached to PO-75 LaBranch Marsh Creation, Louisiana, newest first.
File Type Posted
S01 12FPC323R0001 AM04.pdf PDF
S01 12FPC323R0001 AM04.pdf PDF
1. LaBranche Marsh Creation Project (PO-75) - Questions & Responses.pdf PDF
5. Revised Construction Spec 421 - ECD for Marsh Creation - Amend 3 - Jan 2023.pdf PDF
7.1 PO75 100408 3 - MC Utility & Boring Locations.pdf PDF
7.2 PO75 100408 2-6 - Borrow Area Cross Sections.pdf PDF
7.3 PO75 100408 3 - Borrow Area Magnetic Contours.pdf PDF
2. Site Showing Sign-in PO-75 18Jan2023.pdf PDF
3. Revised Schedule of Pricing 12FPC323R0001 AM03.pdf PDF
6. PO-75 Geotechnical Report Revised 5.26.2017.pdf PDF
7. PO75 100408 Survey Report.pdf PDF
7. PO75 Benchmark Datasheet.pdf PDF
7.2 PO75 100408 1 - Borrow Area Bathymetric Survey Plan View.pdf PDF
7.3 PO75 100408 4 - Borrow Area Mag Gamma Table.pdf PDF
9. PO-75 USCOE - MVN-2012-1081-EPP PERMIT.pdf PDF
4. Revised Construction Spec 21 - Excavation - Amend 3 - Jan 2023.pdf PDF
6. PO-133 Geotechnical Report 4.11.2014.pdf PDF
7. Labranche East Marsh Creation - Complete Drawing Set.pdf PDF
7.1 PO75 100408 20-25 - SDL and SCD Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half - full size).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half).pdf PDF
8. PO-75 Scenic River Permit #1178.pdf PDF
6. PO-75 MCBA Geotechnical Report 12.1.2011.pdf PDF
7.1 PO75 100408 1 - Marsh Creation Topo.pdf PDF
7.1 PO75 100408 2 - Ave Marsh Elevations.pdf PDF
7.1 PO75 100408 4-19 Marsh Creation Cross Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half - full size).pdf PDF
7.4 PO-133-Mag Survey of Access-Drawings.pdf PDF
7.4 PO-133-Mag Survey_Report.pdf PDF
9. PO-133 USCOE - MVN-2012-1081-2-EPP PERMIT.pdf PDF
S01 12FPC323R0001 AM02.pdf PDF
S01 12FPC323R0001 AM01.pdf PDF
S01 12FPC323R0001.pdf PDF
S01 Attachment 3 Wage Determinations.pdf PDF
S01 Attachment 4 Past Performance Questionnaire.docx DOCX document
S01 Attachment 2 Drawings.pdf PDF
S01 Attachment 1 Specifications - July 2022revised.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12FPC323R0001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

FPAC-HQ-APD-TX

Fort Worth TX 76115-3404 501 W. Felix St., Building 23 Fort Worth Federal Center

FPAC BUS CNTR-ACQUISITION DIV-TX

FPAC-HQ-12FPC3

WASHINGTON DC 20250

1400 INDEPENDENCE AVE SW, RM 6801-S

FPAC BUS CNTR-ACQ DIV-OPS BRANCH-SE

01/31/20230003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/04/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PO-75 LaBranch Marsh Creation

This amendment provides the following information and extends the date for receipt of proposals to Friday, February 17, 2023:

1) Questions and Responses as received by contractors from site visit and in writing as of

January 25, 2023.

2) Site visit sign-in sheets.

3) Revised Pricing Schedule - page 4 of 52 required due to changes in Specifications 21 to break out Excavation of Tidal Creeks and Tidal Ponds.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

LAUREEN M. EIPP

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC323R0001/0003

4) Amended Construction Specification 21, Excavation as follows:

- Bid Item 5, Excavation for Tidal Creeks and Tidal Ponds¿ will be changed to ¿Bid Item 5, Excavation, Tidal Creeks and Bid Item 5AA, Excavation, Tidal Ponds

- Changes the payment method from Lump Sum to per pond basis (each) for the Tidal Ponds, and per lineal foot basis for Tidal Creeks.

- No drawings will be modified as a result of this change.

- No changes to performance time

5) Amends Construction Specification 421, Earthen

Containment Dikes for Marsh Creation as follows:

- Clarifies Earthen Containment Dike side slope dimensions are 3:1 (H:V) with the exception of MCA 3 between STA 12+50 and 15+80. That section shall have 4:1 (H:V) side slopes.

- No drawings will be modified as a result of this change.

- No changes to performance time.

6) Provides the geotechnical reports for PO-75 and PO-133 - See files named PO-75 Geotechnical

Report 11.15.2010; PO-75 Geotechnical Report

Revised 5.26.2017; PO-75 MCBA Geotechnical Report

12.1.2011; PO-133 Geotechnical Report 4.11.2014.

7) Provides the magnetometer survey and report for PO-75 and PO-133. See files named Labranche

East Marsh Creation - Complete Drawing Set; PO75

100408 Survey Report; PO75 Benchmark Datasheet.

7.1 For PO-75 Marsh Creation see files named

PO75 100408 4-19 Marsh Creation Cross Sections, PO75 100408 2 - Ave Marsh Elevations; PO75 100408

3 - MC Utility & Boring Locations; PO75 100408

20-25 - SDL and SCD Sections; and PO75 100408 1 -

Marsh Creation Topo.

7.2 For PO-75 Borrow Area - see files named

PO75 100408 1 - Borrow Area Bathymetric Survey

Plan View and PO75 100408 2-6 - Borrow Area Cross

Sections

7.3 For PO-75 Geophyscial Survey - see files

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

12FPC323R0001/0003

named - PO75 100408 2 - Borrow Area Mag Plan View

(east half); PO75 100408 3 - Borrow Area Magnetic

Contours; PO75 100408 4 - Borrow Area Mag Gamma

Table; PO75 100408 2 - Borrow Area Mag Plan View

(east half - full size); PO75 100408 1 - Borrow

Area Mag Plan View (west half); PO75 100408 1 -

Borrow Area Mag Plan View (west half - full size)

7.4 FOR PO-133 (Now a part of the PO-75

project). See file named PO-133-Mag Survey

Report; and PO-133-Mag Survey of Access-Drawings

8) Provides a copy of the Scenic Rivers permit

#1178. See file named: PO-75 Scenic River Permit

#1178

9) Provides a copy of the Department of Army permits. See files named: PO-75 USCOE -

MVN-2012-1081-EPP PERMIT and PO-133 USCOE -

MVN-2012-1081-2-EPP PERMIT

LIST OF CHANGES:

Bids due date : 07-FEB-23 changed to 17-FEB-23

Date distributed : 18-JAN-23 changed to 31-JAN-23

CHANGES FOR LINE ITEM NUMBER: 5

Description changed from EXCAVATION, TIDAL CREEKS

& PONDS to EXCAVATION, TIDAL CREEKS

Quantity changed from 1 to 6848

Unit changed from Lump Sum to Linear Foot

CHANGES FOR DELIVERY LOCATION: NRCS-LA-127217

Quantity changed from 1 to 6848

LIST OF ADDITIONAL ITEMS:

0005AA EXCAVATION, TIDAL PONDS 39 EA

Product/Service Code: Y1KZ

Product/Service Description: CONSTRUCTION OF

OTHER CONSERVATION AND DEVELOPMENT FACILITIES

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .