This federal contract opportunity seeks construction services for a marsh creation project in Louisiana. The Department of Agriculture Under Secretary for Farm Production and Conservation will award a firm fixed price construction contract for $12.3 million to restore 1,200 acres of marsh and create 6,540 linear feet of tidal creeks near Norco, Louisiana. The goal is to improve wildlife and fisheries habitat as well as water quality and provide storm protection to a major highway. Offerors must submit proposals by February 15th, with award anticipated by April 1st and work to be completed within 524 calendar days of the notice to proceed.
Other files for this federal contract opportunity
Other files attached to PO-75 LaBranch Marsh Creation, Louisiana, newest first.
File
Type
Posted
S01 12FPC323R0001 AM04.pdf
PDF
Feb 16, 2023
S01 12FPC323R0001 AM04.pdf
PDF
Feb 16, 2023
6. PO-75 MCBA Geotechnical Report 12.1.2011.pdf
PDF
Jan 31, 2023
7.1 PO75 100408 1 - Marsh Creation Topo.pdf
PDF
Jan 31, 2023
7.1 PO75 100408 2 - Ave Marsh Elevations.pdf
PDF
Jan 31, 2023
7.1 PO75 100408 4-19 Marsh Creation Cross Sections.pdf
PDF
Jan 31, 2023
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half - full size).pdf
PDF
Jan 31, 2023
7.4 PO-133-Mag Survey of Access-Drawings.pdf
PDF
Jan 31, 2023
7.4 PO-133-Mag Survey_Report.pdf
PDF
Jan 31, 2023
9. PO-133 USCOE - MVN-2012-1081-2-EPP PERMIT.pdf
PDF
Jan 31, 2023
4. Revised Construction Spec 21 - Excavation - Amend 3 - Jan 2023.pdf
PDF
Jan 31, 2023
6. PO-133 Geotechnical Report 4.11.2014.pdf
PDF
Jan 31, 2023
7. Labranche East Marsh Creation - Complete Drawing Set.pdf
PDF
Jan 31, 2023
7.1 PO75 100408 20-25 - SDL and SCD Sections.pdf
PDF
Jan 31, 2023
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half).pdf
PDF
Jan 31, 2023
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half - full size).pdf
PDF
Jan 31, 2023
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half).pdf
PDF
Jan 31, 2023
S01 12FPC323R0001 AM03.pdf
PDF
Jan 31, 2023
1. LaBranche Marsh Creation Project (PO-75) - Questions & Responses.pdf
PDF
Jan 31, 2023
5. Revised Construction Spec 421 - ECD for Marsh Creation - Amend 3 - Jan 2023.pdf
PDF
Jan 31, 2023
7.1 PO75 100408 3 - MC Utility & Boring Locations.pdf
PDF
Jan 31, 2023
7.2 PO75 100408 2-6 - Borrow Area Cross Sections.pdf
PDF
Jan 31, 2023
7.3 PO75 100408 3 - Borrow Area Magnetic Contours.pdf
PDF
Jan 31, 2023
2. Site Showing Sign-in PO-75 18Jan2023.pdf
PDF
Jan 31, 2023
3. Revised Schedule of Pricing 12FPC323R0001 AM03.pdf
PDF
Jan 31, 2023
6. PO-75 Geotechnical Report Revised 5.26.2017.pdf
PDF
Jan 31, 2023
7. PO75 100408 Survey Report.pdf
PDF
Jan 31, 2023
7. PO75 Benchmark Datasheet.pdf
PDF
Jan 31, 2023
7.2 PO75 100408 1 - Borrow Area Bathymetric Survey Plan View.pdf
PDF
Jan 31, 2023
7.3 PO75 100408 4 - Borrow Area Mag Gamma Table.pdf
PDF
Jan 31, 2023
9. PO-75 USCOE - MVN-2012-1081-EPP PERMIT.pdf
PDF
Jan 31, 2023
S01 12FPC323R0001 AM02.pdf
PDF
Jan 19, 2023
S01 12FPC323R0001 AM01.pdf
PDF
Jan 11, 2023
S01 Attachment 1 Specifications - July 2022revised.pdf
PDF
Jan 4, 2023
S01 Attachment 2 Drawings.pdf
PDF
Jan 4, 2023
S01 12FPC323R0001.pdf
PDF
Jan 4, 2023
S01 Attachment 3 Wage Determinations.pdf
PDF
Jan 4, 2023
S01 Attachment 4 Past Performance Questionnaire.docx
DOCX document
Jan 4, 2023
Show all 38
On GovTribe
Work with this file on GovTribe
Download the original file
Contacts named in this file
Similar government files
Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated Jan 31, 2023 .