7.3 PO75 100408 4 - Borrow Area Mag Gamma Table.pdf

PDF 2 MB Posted

Attached to
PO-75 LaBranch Marsh Creation, Louisiana Federal contract opportunity
Solicitation number
12FPC323R0001
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This federal contract opportunity is for the PO-75 LaBranch Marsh Creation project in Louisiana. The project goal is to restore 1,200 acres of marshland and create 6,540 linear feet of tidal creeks using dredging from Lake Pontchartrain. This will improve wildlife and fisheries habitat as well as water quality, while providing storm protection to Interstate 10, a key hurricane evacuation route. The Department of Agriculture Under Secretary for Farm Production and Conservation will award a firm fixed-price construction contract with a performance period of 524 calendar days from the notice to proceed. The solicitation number is 12FPC323R0001.

View the file

Other files for this federal contract opportunity

Other files attached to PO-75 LaBranch Marsh Creation, Louisiana, newest first.
File Type Posted
S01 12FPC323R0001 AM04.pdf PDF
S01 12FPC323R0001 AM04.pdf PDF
6. PO-75 MCBA Geotechnical Report 12.1.2011.pdf PDF
7.1 PO75 100408 1 - Marsh Creation Topo.pdf PDF
7.1 PO75 100408 2 - Ave Marsh Elevations.pdf PDF
7.1 PO75 100408 4-19 Marsh Creation Cross Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half - full size).pdf PDF
7.4 PO-133-Mag Survey of Access-Drawings.pdf PDF
7.4 PO-133-Mag Survey_Report.pdf PDF
9. PO-133 USCOE - MVN-2012-1081-2-EPP PERMIT.pdf PDF
2. Site Showing Sign-in PO-75 18Jan2023.pdf PDF
3. Revised Schedule of Pricing 12FPC323R0001 AM03.pdf PDF
6. PO-75 Geotechnical Report Revised 5.26.2017.pdf PDF
7. PO75 100408 Survey Report.pdf PDF
7. PO75 Benchmark Datasheet.pdf PDF
7.2 PO75 100408 1 - Borrow Area Bathymetric Survey Plan View.pdf PDF
9. PO-75 USCOE - MVN-2012-1081-EPP PERMIT.pdf PDF
S01 12FPC323R0001 AM03.pdf PDF
1. LaBranche Marsh Creation Project (PO-75) - Questions & Responses.pdf PDF
5. Revised Construction Spec 421 - ECD for Marsh Creation - Amend 3 - Jan 2023.pdf PDF
7.1 PO75 100408 3 - MC Utility & Boring Locations.pdf PDF
7.2 PO75 100408 2-6 - Borrow Area Cross Sections.pdf PDF
7.3 PO75 100408 3 - Borrow Area Magnetic Contours.pdf PDF
4. Revised Construction Spec 21 - Excavation - Amend 3 - Jan 2023.pdf PDF
6. PO-133 Geotechnical Report 4.11.2014.pdf PDF
7. Labranche East Marsh Creation - Complete Drawing Set.pdf PDF
7.1 PO75 100408 20-25 - SDL and SCD Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half - full size).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half).pdf PDF
8. PO-75 Scenic River Permit #1178.pdf PDF
S01 12FPC323R0001 AM02.pdf PDF
S01 12FPC323R0001 AM01.pdf PDF
S01 Attachment 1 Specifications - July 2022revised.pdf PDF
S01 12FPC323R0001.pdf PDF
S01 Attachment 3 Wage Determinations.pdf PDF
S01 Attachment 4 Past Performance Questionnaire.docx DOCX document
S01 Attachment 2 Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .