3. Revised Schedule of Pricing 12FPC323R0001 AM03.pdf

PDF 109 KB Posted

Attached to
PO-75 LaBranch Marsh Creation, Louisiana Federal contract opportunity
Solicitation number
12FPC323R0001
Issued by
Department of Agriculture Under Secretary for Farm Production and Conservation

About this file

This document is a revised schedule of pricing for solicitation number 12FPC323R0001 to create 1,200 acres of marsh in St. Charles Parish, Louisiana. The project aims to restore previously converted marshland and improve wildlife habitat, fisheries, water quality, and storm protection for Interstate 10. The solicitation requires bids on all line items and will result in a single award fixed-price construction contract valued at approximately $6.15 million. Key work includes mobilization, surveys, excavating over 6 million cubic yards of fill for marsh creation and 39 tidal ponds, placing over 54,000 linear feet of containment dikes, and installing 695 square yards of geotextile. Performance will be for 524 calendar days from notice to proceed.

View the file

Other files for this federal contract opportunity

Other files attached to PO-75 LaBranch Marsh Creation, Louisiana, newest first.
File Type Posted
S01 12FPC323R0001 AM04.pdf PDF
S01 12FPC323R0001 AM04.pdf PDF
S01 12FPC323R0001 AM03.pdf PDF
1. LaBranche Marsh Creation Project (PO-75) - Questions & Responses.pdf PDF
5. Revised Construction Spec 421 - ECD for Marsh Creation - Amend 3 - Jan 2023.pdf PDF
7.1 PO75 100408 3 - MC Utility & Boring Locations.pdf PDF
7.2 PO75 100408 2-6 - Borrow Area Cross Sections.pdf PDF
7.3 PO75 100408 3 - Borrow Area Magnetic Contours.pdf PDF
6. PO-75 MCBA Geotechnical Report 12.1.2011.pdf PDF
7.1 PO75 100408 1 - Marsh Creation Topo.pdf PDF
7.1 PO75 100408 2 - Ave Marsh Elevations.pdf PDF
7.1 PO75 100408 4-19 Marsh Creation Cross Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half - full size).pdf PDF
7.4 PO-133-Mag Survey of Access-Drawings.pdf PDF
7.4 PO-133-Mag Survey_Report.pdf PDF
9. PO-133 USCOE - MVN-2012-1081-2-EPP PERMIT.pdf PDF
2. Site Showing Sign-in PO-75 18Jan2023.pdf PDF
6. PO-75 Geotechnical Report Revised 5.26.2017.pdf PDF
7. PO75 100408 Survey Report.pdf PDF
7. PO75 Benchmark Datasheet.pdf PDF
7.2 PO75 100408 1 - Borrow Area Bathymetric Survey Plan View.pdf PDF
7.3 PO75 100408 4 - Borrow Area Mag Gamma Table.pdf PDF
9. PO-75 USCOE - MVN-2012-1081-EPP PERMIT.pdf PDF
4. Revised Construction Spec 21 - Excavation - Amend 3 - Jan 2023.pdf PDF
6. PO-133 Geotechnical Report 4.11.2014.pdf PDF
7. Labranche East Marsh Creation - Complete Drawing Set.pdf PDF
7.1 PO75 100408 20-25 - SDL and SCD Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half - full size).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half).pdf PDF
8. PO-75 Scenic River Permit #1178.pdf PDF
S01 12FPC323R0001 AM02.pdf PDF
S01 12FPC323R0001 AM01.pdf PDF
S01 12FPC323R0001.pdf PDF
S01 Attachment 3 Wage Determinations.pdf PDF
S01 Attachment 4 Past Performance Questionnaire.docx DOCX document
S01 Attachment 1 Specifications - July 2022revised.pdf PDF
S01 Attachment 2 Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 12FPC323R0001 AMENDMENT 003-1/31/2023

PART I – THE SCHEDULE

PO-75 LaBranch Marsh Creation, Louisiana

B - SUPPLIES OR SERVICES AND PRICES

This solicitation requires bidding on all line items, failure to do so will disqualify the proposal.

Item No. Supplies/Services Spec.

No.

Quantity Unit Unit Price

Amount

1 Mobilization/Demobilization 8 1 LS XXX 2 Construction Surveys 7 1 LS XXX 3 Excavation, Marsh Creation Fill 423 6,153,026* CY 4 Identification Markers or Plaques, Staff

Gauges

93 49* EA

5<AM03> Excavation, Tidal Creeks 21 6,848* LF XXX

5AA

<AM03>

Excavation , Tidal Ponds

39*

EA

6 Earthfill, Containment Dikes 421 54,618.060*

LF

7 Geotextile 95 695* SY 8 Field Office (Optional) 96 1 LS XXX

TOTAL : $

SUBMITTED BY: Unique Entity ID

52.211-18 Variation in Estimated Quantity. (Apr 1984) If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above fifteen (15) percent or below eighty five (85) percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within ten (10) days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

(End of clause)

Quantities marked with an * above are estimated quantities and the clause FAR 52.211-18, 52.211-18 Variation in Estimated Quantity, applies.

ONE AWARD FOR THE AGGREGATE OF ALL ITEMS WILL BE MADE AS A RESULT OF THIS

SOLICITATION

PART I – THE SCHEDULE
52.211-18 Variation in Estimated Quantity. (Apr 1984)
ONE AWARD FOR THE AGGREGATE OF ALL ITEMS WILL BE MADE AS A RESULT OF THIS SOLICITATION