This document outlines the requirements for a firm fixed price construction contract to perform marsh creation work in Louisiana. The project goal is to restore 1,200 acres of marshland and create 6,540 linear feet of tidal creeks near Norco, Louisiana through dedicated dredging from Lake Pontchartrain. A contractor will be selected to excavate tidal creeks and ponds to the required lines and grades, using unclassified excavated material to fill the marsh creation areas. Payment will be made on a linear foot basis for tidal creek excavation and per pond basis for tidal ponds upon approval of as-built surveys. The performance period is 524 calendar days from notice to proceed. The soliciting agency is the Department of Agriculture Under Secretary for Farm Production and Conservation.

View the file

Other files for this federal contract opportunity

Other files attached to PO-75 LaBranch Marsh Creation, Louisiana, newest first.
File Type Posted
S01 12FPC323R0001 AM04.pdf PDF
S01 12FPC323R0001 AM04.pdf PDF
6. PO-75 MCBA Geotechnical Report 12.1.2011.pdf PDF
7.1 PO75 100408 1 - Marsh Creation Topo.pdf PDF
7.1 PO75 100408 2 - Ave Marsh Elevations.pdf PDF
7.1 PO75 100408 4-19 Marsh Creation Cross Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half - full size).pdf PDF
7.4 PO-133-Mag Survey of Access-Drawings.pdf PDF
7.4 PO-133-Mag Survey_Report.pdf PDF
9. PO-133 USCOE - MVN-2012-1081-2-EPP PERMIT.pdf PDF
S01 12FPC323R0001 AM03.pdf PDF
1. LaBranche Marsh Creation Project (PO-75) - Questions & Responses.pdf PDF
5. Revised Construction Spec 421 - ECD for Marsh Creation - Amend 3 - Jan 2023.pdf PDF
7.1 PO75 100408 3 - MC Utility & Boring Locations.pdf PDF
7.2 PO75 100408 2-6 - Borrow Area Cross Sections.pdf PDF
7.3 PO75 100408 3 - Borrow Area Magnetic Contours.pdf PDF
6. PO-133 Geotechnical Report 4.11.2014.pdf PDF
7. Labranche East Marsh Creation - Complete Drawing Set.pdf PDF
7.1 PO75 100408 20-25 - SDL and SCD Sections.pdf PDF
7.3 PO75 100408 1 - Borrow Area Mag Plan View (west half).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half - full size).pdf PDF
7.3 PO75 100408 2 - Borrow Area Mag Plan View (east half).pdf PDF
8. PO-75 Scenic River Permit #1178.pdf PDF
2. Site Showing Sign-in PO-75 18Jan2023.pdf PDF
3. Revised Schedule of Pricing 12FPC323R0001 AM03.pdf PDF
6. PO-75 Geotechnical Report Revised 5.26.2017.pdf PDF
7. PO75 100408 Survey Report.pdf PDF
7. PO75 Benchmark Datasheet.pdf PDF
7.2 PO75 100408 1 - Borrow Area Bathymetric Survey Plan View.pdf PDF
7.3 PO75 100408 4 - Borrow Area Mag Gamma Table.pdf PDF
9. PO-75 USCOE - MVN-2012-1081-EPP PERMIT.pdf PDF
S01 12FPC323R0001 AM02.pdf PDF
S01 12FPC323R0001 AM01.pdf PDF
S01 Attachment 1 Specifications - July 2022revised.pdf PDF
S01 12FPC323R0001.pdf PDF
S01 Attachment 3 Wage Determinations.pdf PDF
S01 Attachment 4 Past Performance Questionnaire.docx DOCX document
S01 Attachment 2 Drawings.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NRCS –July 2022 Amendment 3 – Jan. 2023 LA- LaBranche MC PO-75 21-1

Construction Specification 21—Excavation

1. Scope The work shall consist of the excavation required by the drawings and specifications and disposal of the excavated materials.

2. Classification Excavation is classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions.

Common excavation is defined as the excavation of all materials that can be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors or that can be excavated and dumped into place or loaded onto hauling equipment by excavators having a rated capacity of one cubic yard or larger and equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.

Rock excavation is defined as the excavation of all hard, compacted, or cemented materials that require blasting or the use of ripping and excavating equipment larger than defined for common excavation. The excavation and removal of isolated boulders or rock fragments larger than 1 cubic yard encountered in materials otherwise conforming to the definition of common excavation shall be classified as rock excavation. The presence of isolated boulders or rock fragments larger than 1 cubic yard is not in itself sufficient cause to change the classification of the surrounding material.

For the purpose of these classifications, the following definitions shall apply:

Heavy ripping equipment is a rear-mounted, heavy duty, single-tooth, ripping attachment mounted on a track type tractor having a power rating of at least 250 flywheel horsepower unless otherwise specified in section 10.

Wheel tractor-scraper is a self-loading (not elevating) and unloading scraper having a struck bowl capacity of at least 12 cubic yards.

Pusher tractor is a track type tractor having a power rating of at least 250 flywheel horsepower equipped with appropriate attachments.

Unclassified excavation is defined as the excavation of all materials encountered, including rock materials, regardless of their nature or the manner in which they are removed.

3. Blasting The transportation, handling, storage, and use of dynamite and other explosives shall be directed and supervised by a person(s) of proven experience and ability who is authorized and qualified to conduct blasting operations.

Blasting shall be done in a manner as to prevent damage to the work or unnecessary fracturing of

LA- LaBranche MC PO-75 21-2 the underlying rock materials and shall conform to any special requirements in section 10 of this specification. When specified in section 10, the Contractor shall furnish the engineer, in writing, a blasting plan before blasting operations begin.

4. Use of excavated material Method 1—To the extent they are needed, all suitable material from the specified excavations shall be used in the construction of required permanent earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer. The Contractor shall not waste or otherwise dispose of suitable excavated material.

Method 2—Suitable material from the specified excavations may be used in the construction of required earthfill or rockfill. The suitability of material for specific purposes is determined by the engineer.

5. Disposal of waste materials Method 1—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of at the locations shown on the drawings.

Method 2—All surplus or unsuitable excavated materials are designated as waste and shall be disposed of by the Contractor at sites of his own choosing away from the site of the work. The disposal shall be in an environmentally acceptable manner that does not violate local rules and regulations.

6. Excavation limits Excavations shall comply with OSHA Construction Industry Standards (29CFR Part 1926) Subpart P, Excavations, Trenching, and Shoring. All excavations shall be completed and maintained in a safe and stable condition throughout the total construction phase. Structure and trench excavations shall be completed to the specified elevations and to the length and width required to safely install, adjust, and remove any forms, bracing, or supports necessary for the installation of the work. Excavations outside the lines and limits shown on the drawings or specified herein required to meet safety requirements shall be the responsibility of the Contractor in constructing and maintaining a safe and stable excavation.

7. Borrow excavation When the quantities of suitable material obtained from specified excavations are insufficient to construct the specified earthfills and earth backfills, additional material shall be obtained from the designated borrow areas. The extent and depth of borrow pits within the limits of the designated borrow areas shall be as specified in section 10 or as approved by the engineer.

Borrow pits shall be excavated and finally dressed to blend with the existing topography and sloped to prevent ponding and to provide drainage.

8. Overexcavation Excavation in rock beyond the specified lines and grades shall be corrected by filling the resulting voids with portland cement concrete made of materials and mix proportions approved by the engineer. Concrete that will be exposed to the atmosphere when construction is completed

LA- LaBranche MC PO-75 21-3 shall meet the requirements of concrete selected for use under Construction Specification 31, Concrete for Major Structures, or 32, Structure Concrete, as appropriate.

Concrete that will be permanently covered shall contain not less than five bags of cement per cubic yard. The concrete shall be placed and cured as specified by the engineer.

Excavation in earth beyond the specified lines and grades shall be corrected by filling the resulting voids with approved, compacted earthfill. The exception to this is that if the earth is to become the subgrade for riprap, rockfill, sand or gravel bedding, or drainfill, the voids may be filled with material conforming to the specifications for the riprap, rockfill, bedding, or drainfill.

Before correcting an overexcavation condition, the Contractor shall review the planned corrective action with the engineer and obtain approval of the corrective measures.

9. Measurement and payment For items of work for which specific unit prices are established in the contract, the volume of each type and class of excavation within the specified pay limits is measured and computed to the nearest cubic yard by the method of average cross-sectional end areas or by methods outlined in section 10 of this specification. Regardless of quantities excavated, the measurement for payment is made to the specified pay limits except that excavation outside the specified lines and grades directed by the engineer to remove unsuitable material is included. Excavation required because unsuitable conditions result from the Contractor's improper construction operations, as determined by the engineer, is not included for measurement and payment.

Method 1—The pay limits shall be as designated on the drawings.

Method 2—The pay limits shall be defined as follows:

a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.

b. The lower and lateral limits shall be the neat lines and grades shown on the drawings.

Method 3—The pay limits shall be defined as follows:

a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.

b. The lower and lateral limits shall be the true surface of the completed excavation as directed by the engineer.

Method 4—The pay limits shall be defined as follows:

a. The upper limit shall be the original ground surface as it existed before the start of construction operations except that where excavation is performed within areas designated for previous excavation or earthfill, the upper limit shall be the modified ground surface resulting from the specified previous excavation or earthfill.

LA- LaBranche MC PO-75 21-4

b. The lower limit shall be at the bottom surface of the proposed structure.

c. The lateral limits shall be 18 inches outside of the outside surface of the proposed structure or shall be vertical planes 18 inches outside of and parallel to the footings, whichever gives the larger pay quantity, except as provided in d below.

d. For trapezoidal channel linings or similar structures that are to be supported upon the sides of the excavation without intervening forms, the lateral limits shall be at the underside of the proposed lining or structure.

e. For the purposes of the definitions in b, c, and d, above, any specified bedding or drainfill directly beneath or beside the structure will be considered to be a part of the structure.

All methods—The following provisions apply to all methods of measurement and payment.

Payment for each type and class of excavation is made at the contract unit price for that type and class of excavation. Such payment will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to the performance of the work except that extra payment for backfilling overexcavation will be made in accordance with the following provisions.

Payment for backfilling overexcavation, as specified in section 8 of this specification, is made only if the excavation outside specified lines and grades is directed by the engineer to remove unsuitable material and if the unsuitable condition is not a result of the Contractor's improper construction operations as determined by the engineer.

Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 10 of this specification.

10. Items of work and construction details

LA- LaBranche MC PO-75 21-5

10. Items of work and construction details Items of work to be performed in conformance with this specification and the construction details therefore are:

A. Bid Item 5, Excavation for, Tidal Creeks and Bid Item 5A, Excavation, Tidal Ponds

1) General

i. This item shall consist of the excavation of the tidal creeks and tidal ponds, prior to marsh fill operations, to the lines and grades shown on the drawings and as specified herein. Minor adjustments to the location may be made in the field by the COR to minimize impacts to existing marsh.

ii. Construction Specification 094 - Quality Control outlines the requirements of the Work Plan for tidal creeks and tidal ponds.

2) Excavation Classification

i. In Section 2 of this specification, the classification will be Unclassified

Excavation. There is no knowledge of existing rock in the marsh creation area. However, this does not imply with certainty that rock does not exist in the marsh creation area.

3) Use of Excavated Material Classification

i. In Section 4 of this specification, the Use of Excavated Material, Method 1 shall apply. All material shown in the hatched area of the drawings are considered to be suitable.

4) Disposal Classification

i. In lieu of Section 5 of this specification, disposal shall be as follows: all excavated material shall be placed in the marsh creation areas as shown on the drawings. In the event woody debris is discovered during excavation, the woody debris may be disposed of in the marsh creation cells provided it is completely covered by the marsh creation fill material. Otherwise, any woody material shall be removed and disposed of offsite.

ii. No woody material will be placed in the footprint of the tidal creeks and tidal ponds. Natural woody or vegetative material may be disposed of by side casting into the marsh creation area provided it is completely covered by the marsh creation fill material. All other debris shall be considered unsuitable material and shall be disposed of in an approved landfill.

5) Excavation and Placement Requirements

i. In Section 6, The material shall be excavated to the neat lines and grades as shown on the drawings.

ii. The material from the tidal creeks and tidal ponds shall be constructed to the neat lines and grade shown in the project drawings. The material placed shall not exceed the target elevation of +2.5 feet (elevation is NAVD88, GEOID03).

6) Measurement and Payment

LA- LaBranche MC PO-75 21-6

i. Measurement and Payment, Section 9 in this specification, No Method shall apply. Payment will be made at the contract unit price. Such payment will constitute full compensation for all labor, materials, equipment, and all other items necessary and incidental to the completion of the work. 45% of the lump sum is eligible for payment upon approval of the as-built surveys for all tidal creeks and ponds in Cell 1. 5% of the lump sum is eligible for payment upon approval of the as-built surveys for all tidal creeks and ponds in Cell 2.

50% of the lump sum is eligible for payment upon approval of the as-built surveys for all tidal creeks and ponds in Cell 3. Payments will not be split per cell. Payment for this item will be for Bid Item 5, Excavation for Tidal Measurement and Payment, Section 9 in this specification, No Method shall apply. Payment for the tidal creeks will be on a linear foot basis under Bid Item 5, Excavation, Tidal Creeks and shall be eligible for payment upon approval of the as-built surveys. Payment for the tidal ponds will be on a per pond basis (each) under Bid Item 5A, Excavation, Tidal Ponds and shall be eligible for payment upon approval of the as-built surveys. Payment shall be made at the contract unit price. Such payment will constitute full compensation for all labor, materials, equipment and all other items necessary and incidental to the completion of work. All tidal creeks within a cell must be complete prior to being eligible for payment. Tidal ponds can be paid on an individual basis.

10. Items of work and construction details
A. Bid Item 5, Excavation for, Tidal Creeks and Bid Item 5A, Excavation, Tidal Ponds
1) General
2) Excavation Classification
3) Use of Excavated Material Classification
4) Disposal Classification
5) Excavation and Placement Requirements
6) Measurement and Payment