Moyer Bridge Installation - Salmon-Challis National Forest
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1282B123R0077
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Salmon, Idaho 83467, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The contract opportunity involves an Aquatic Organism Passage project in the Salmon-Challis National Forest, which includes replacing an existing ford with a bridge, channel restoration, and construction of bridge approach roadways. The contractor will be responsible for acquiring abutment materials, erecting the abutments, and transporting the government-furnished bridge to the work site. Proposals are due by August 30, 2023.
The contractor will provide the following services and products:
- Acquisition of abutment materials.
- Erection of the abutments.
- Transportation of the prefabricated bridge to the work site.
- Channel restoration.
- Construction of bridge approach roadways.
Notice text
This Solicitation replaces Notice ID: 1282B123R0057 under Solicitation No. 1282B123R0057 that was originally a HUBZone set-aside.
This Solicitation is a Total Small Business set-aside.
The Salmon-Challis National Forest has an Aquatic Organism Passage project to replace an existing ford with a bridge. Work includes channel restoration, installation of a government furnished bridge on contractor provided abutments and the construction of bridge approach roadways. Rock and aggregate materials are available from government sources. Alternate (Commercial) sources proposed by the contractor will need to be approved for material suitability and weed free nature of the source. The contractor is responsible for the acquisition of the abutment materials per the attached plans and specifications along with the erection of the abutments.
Government furnished materials are located at 3 locations in the vicinity of the project. The prefabricated bridge will be staged in Salmon, Idaho. The contractor is responsible for transporting the bridge to the work site. An instream work window of 7/15 to 8/15 has been established. All work within the ordinary high-water mark including de-watering, excavation and backfill, channel restoration and re-watering of the channel shall occur within this window.
Refer to the attached Schedule of Items, Statement of work, Prelim Moyer Creek FSSS, Moyer Creek Final Drawings, Project Design features, , Moyer Creek Bridge Shop Drawings, Moyer Access map and Materials vicinity maps for specifications, drawings, requirements and locations.
There is no Pre-Proposal site visit is planned. The location is open to the public and Offers are encouraged to visit the site on thier own. If there are questions, refer to the Q & A Moyer Site Visit_6.28.23 document and any further quesitons shall be addressed to Susan Kunath, Contract Specialist at susan.j.kunath@usda.gov .
Proposals are due: August 30, 2023 at 1:00 p.m. CT. and are to be sent electronically to : Susan Kunath at susan.j.kunath@usda.gov. with the Offers name and Moyer Bridge in the subject line.
Government's Contracting Point of Contact:
Susan Kunath
email: susan.j.kunath@usda.gov
Attachments
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Moyer Bridge Installation - Salmon-Challis National Forest | Award Notice | |
| Moyer Bridge Installation - Salmon-Challis National Forest | Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity