Attachment 1 Schedule of Items.pdf

PDF 80 KB Posted

Attached to
Moyer Bridge Installation - Salmon-Challis National Forest Federal contract opportunity
Solicitation number
1282B123R0077
Issued by
Department of Agriculture Forest Service

About this file

This document contains a schedule of items for a bridge installation project on the Salmon-Challis National Forest. The Forest Service is soliciting bids to mobilize personnel and equipment, perform survey and erosion control work, excavate and backfill the site, install riprap and aggregate surfacing, transport and place a prefabricated 16' x 40' bridge superstructure and glulam abutments, seed the area, and place channel rock. Bidders should provide unit pricing for the listed items, with a total project cost to be determined based on the contract quantities. Notable requirements include placement of willow transplants at four locations and bench construction in the channel.

View the file

Other files for this federal contract opportunity

Other files attached to Moyer Bridge Installation - Salmon-Challis National Forest, newest first.
File Type Posted
Attachment 10 Moyer Creek Bridge Shop Drawings APPROVED.pdf PDF
1282B123R0077.pdf PDF
Attachment 4 G-074 MOYER CREEK FINAL Drawings.pdf PDF
Attachment 9 Appendix D Past Performance Questionnaire.pdf PDF
Attachment 7 MOYER MATERIALS VICINITY MAP.pdf PDF
Attachment 5 Project Design Features.pdf PDF
Attachment 3 PRELIM MOYER CREEK FSSS.pdf PDF
Attachment 2 Statement of Work.pdf PDF
Q_As Moyer Site Visit_6.28.23_sk.pdf PDF
Attachment 8 DBWage Determination ID20220087_5.12.23.pdf PDF
Attachment 6 MOYER ACCESS MAP.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Name: Moyer Creek Bridge

Contractor Name: Signature:

Contractor Address:

SAM UEI:

Date:

Item No. Description Unit Quantity Unit Cost Total

15101 Mobilization Lump Sum 1 $0

15221 Construction Survey and Staking Lump Sum 1 $0

15713 Soil erosion and pollution control Lump Sum 1 $0

20102 Clearing and Grubbing, Slash Treatment Methods for Tops and Limbs (f), Logs (f), and Stumps (f)

Lump Sum 1 $0

20401 Roadway Excavation and Embankment, Placement Method 6

Lump Sum 1 $0

20806 Structure Excavation and Backfill Lump Sum 1 $0

25101 Placed Riprap, Class 4 (Government Source)

Cubic Yard* 96 $0

32203 Aggregate surface course, Compaction (B) (Government Source)

Cubic Yard* 68 $0

57102 16'x40' Prefabricated Bridge Superstructure- Government Supplied- Transport, & Install (includes railing)

Lump Sum 1 $0

57704 Prefabricated Treated Glulam Abutments;

Fabricate, Transport, & Install

Lump Sum 1 $0

62503 Seeding with Mulch, Method (a) Dry Method

Lump Sum 1 $0

63306 Object Markers (Type 3) Each 4 $0

64801 Placed Channel Rock, Class CR-0, Method C (Government Source)

Cubic Yard* 12 $0

64802 Placed Channel Rock, Class CR-1, Method C (Government Source)

Cubic Yard* 80 $0

64803 Channel bench construction Lump Sum 1 $0

64804 Willow Transplants, 4 locations Lump Sum 1 $0

*Indicates Contract Quantities

Schedule of Items

The offeror shall insert a quote in each Bid Schedule opposite each pay name listed in the Schedule. A quote is not to be tendered for any item not listed. All other items not listed are indirect to one of the above items above.

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization. Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.