Attachment 10 Moyer Creek Bridge Shop Drawings APPROVED.pdf
PDF 3 MB Posted
- Attached to
- Moyer Bridge Installation - Salmon-Challis National Forest Federal contract opportunity
- Solicitation number
- 1282B123R0077
- Issued by
- Department of Agriculture Forest Service
About this file
This file attachment summarizes approved shop drawings for the Moyer Creek Bridge Installation federal contract opportunity. The solicitation number is 1282B123R0077 and was issued by the Department of Agriculture Forest Service for installation of the Moyer Bridge in the Salmon-Challis National Forest. The approved shop drawings attachment, dated November 14, 2022, details the bridge design and specifications that must be followed for compliance with the contract requirements. This federal opportunity is for installation of the Moyer Creek Bridge as outlined in the approved construction documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1282B123R0077.pdf | ||
| Attachment 4 G-074 MOYER CREEK FINAL Drawings.pdf | ||
| Attachment 8 DBWage Determination ID20220087_5.12.23.pdf | ||
| Attachment 6 MOYER ACCESS MAP.pdf | ||
| Attachment 1 Schedule of Items.pdf | ||
| Q_As Moyer Site Visit_6.28.23_sk.pdf | ||
| Attachment 9 Appendix D Past Performance Questionnaire.pdf | ||
| Attachment 7 MOYER MATERIALS VICINITY MAP.pdf | ||
| Attachment 5 Project Design Features.pdf | ||
| Attachment 3 PRELIM MOYER CREEK FSSS.pdf | ||
| Attachment 2 Statement of Work.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
pschuldt Approved
| 2022-11-14T09:40:50-0700 | |
| PETER SCHULDT |
File details come from the government source that posted it. Updated .