Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- N6247025R0006
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237130 Power and Communication Line and Related Structures Construction
- PSC
- Y1NZ Construction Of Other Utilities
- Place of performance
- Portsmouth, Virginia, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Facilities Engineering Command is seeking qualified contractors for Military Construction Project (MILCON) P732, which involves comprehensive electrical distribution system upgrades at the Gosport Substation within Norfolk Naval Shipyard in Portsmouth, Virginia. The project encompasses replacing primary power service transformers and distribution switchgear, modernizing the electric supervisory control and data acquisition (SCADA) system, and increasing total system capacity to 168 MVA with three primary transformers. Key work includes installing new switchgear in a climate-controlled, pre-engineered stainless steel house on an elevated platform, connecting primary feeders to backbone ductbank, demolishing two existing switch/substation facilities totaling 208 square meters, and constructing two microtunnel railroad crossings for electrical ductbanks. Contractors must demonstrate experience with at least three relevant construction projects valued at $50 million or more completed within the past ten years, with specific expertise in utility substation work and complex project characteristics. The submission deadline for capabilities packages is October 10, 2025, at 2:00 PM local time, and contractors must provide complete responses to the Project Labor Agreement questionnaire to be considered responsive.
This opportunity operates under NAICS code 237130 (Power and Communication Line Construction) with a small business size standard of $45 million, though no set-aside designation has been applied to this procurement. The estimated construction value ranges between $100 million and $250 million, with an anticipated performance period of approximately 1,825 calendar days (approximately 5 years). The government is conducting this sources sought notice as market research to determine whether a small business set-aside acquisition would be in the government's best interest, seeking input from large businesses as well as small businesses including 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned, and Economically Disadvantaged Women-Owned Small Businesses. Due to the project's value exceeding $35 million, it falls under Executive Order 14063 requirements for Project Labor Agreement considerations. The solicitation number is N6247025R0006, and the project follows a design-bid-build delivery method for this critical naval shipyard infrastructure modernization effort.
Notice text
2 versions
Update #2 · Latest ·
THIS IS AN UPDATED SOURCES SOUGHT NOTICE.
PLEASE READ THE FULL SOURCES SOUGHT NOTICE. YOU WILL UTILIZE ALL DOCUMENTS IN THIS SOURCES SOUGHT NOTICE.
PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE. YOU WILL BE CONSIDERED NON-RESPONSIVE IF FORMS ARE NOT COMPLETELY FILLED OUT AND ANSWERED.
This project replaces primary power service transformers, primary power service distribution switchgear, and connects to existing feeders on Main Site distribution. Increases total system capacity to 168 MVA with three primary transformers. Modernizes the existing electric supervisory control and data acquisition (SCADA) system. Specifics include:
- Replaces and increases the capacity of the existing Dominion Gosport Industrial Transformers, circuit breakers, and relay control house with new SO transformers, circuit breakers, and relay control house (WORK BY OTHERS).
- Replaces and increases the capacity of the Gosport Tie Station switchgear with a climate controlled, pre-engineered stainless-steel switchgear house on a new elevated platform. Provides new SCADA controls.
- Connecting Primary feeders to Backbone Ductbank.
- Demolition of Building 1532, a 53 m2 switch/substation facility; and Building 1702, a 155 m2 switch/substation facility.
- Two microtunnel railroad crossings for electrical ductbanks.
PLEASE READ THE FULL SOURCES SOUGHT NOTICE. YOU WILL UTILIZE ALL DOCUMENTS IN THIS SOURCES SOUGHT NOTICE.
PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE. YOU WILL BE CONSIDERED NON-RESPONSIVE IF FORMS ARE NOT COMPLETELY FILLED OUT AND ANSWERED.
Update #1 ·
This project replaces primary power service transformers, primary power service distribution switchgear, and connects to existing feeders on Main Site distribution. Increases total system capacity to 168 MVA with three primary transformers. Modernizes the existing electric supervisory control and data acquisition (SCADA) system.
Specifics include:
1. Replaces and increases the capacity of the existing Dominion Gosport Industrial Transformers, circuit breakers, and relay control house with new SO transformers, circuit breakers, and relay control house (WORK BY OTHERS).
2. Replaces and increases the capacity of the Gosport Tie Station switchgear with a climate controlled, preengineered stainless-steel switchgear house on a new elevated platform. Provides new SCADA controls.
3. Connecting Primary feeders to Backbone Ductbank.
4. Demolition of Building 1532, a 53 m2 switch/substation facility; and Building 1702, a 155 m2 switch/substation facility.
5. Two microtunnel railroad crossings for electrical ductbanks.
PLEASE READ FULL SOURCES SOUGHT NOTICE.
PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE.
Files
| File | Type | Posted |
|---|---|---|
| P732 Project Matrix Template.xlsx | XLSX spreadsheet | |
| P732 Sources Sought notice.pdf | ||
| Project Matrix Template.xlsx | XLSX spreadsheet | |
| Project Matrix Template.xlsx | XLSX spreadsheet | |
| P732 DBB GASPORT SUBSTATION Sources Sought notice - Copy.pdf | ||
| Contractor Information Form.docx | DOCX document | |
| Project Information Form.docx | DOCX document | |
| PLA Request for Information.docx | DOCX document |
Notice history
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity