Project Information Form.docx
DOCX document 26 KB Posted
- Solicitation number
- N6247025R0006
About this file
The provided file is a Sources Sought - Project Information Form, which is a template for contractors to detail their project experience for a potential federal contract opportunity. The related federal contract opportunity is a Military Construction Project (MILCON) P732 for Electrical Distribution System Upgrades at Norfolk Naval Shipyard in Portsmouth, Virginia, issued by the Department of the Navy Naval Facilities Engineering Command.
The project scope involves replacing and increasing capacity of power service transformers, switchgear, and distribution systems at the Gosport Substation. Specific work includes installing new SO transformers, circuit breakers, relay control house, upgrading SCADA controls, connecting primary feeders to backbone ductbank, demolishing two existing switch/substation buildings (totaling 208 m2), and constructing two microtunnel railroad crossings for electrical ductbanks. The project is a Design-Bid-Build type, with the goal of increasing total system capacity to 168 MVA and modernizing the existing electrical infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P732 Sources Sought notice.pdf | ||
| P732 Project Matrix Template.xlsx | XLSX spreadsheet | |
| Project Matrix Template.xlsx | XLSX spreadsheet | |
| P732 DBB GASPORT SUBSTATION Sources Sought notice - Copy.pdf | ||
| Contractor Information Form.docx | DOCX document | |
| PLA Request for Information.docx | DOCX document | |
| Project Matrix Template.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – PROJECT INFORMATION FORM
Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.
| 1. |
| Contractor Name: |
| 2. | ||||
| Project No. (check one): | ||||
| |_| 1 | |_| 2 | |_| 3 | |_| 4 | |_| 5 |
| 3. |
| Contract Number: |
| Delivery/Task Order No.: |
| Project Number: |
| Title: |
| Location: |
| 4. |
| Award Date (mm/dd/yy): |
| 5. |
| Final Contract Price: |
| $ |
| Completion Date (mm/dd/yy): |
| (includes all options and mods) |
| Project is % complete (as of submission due date) |
| This is the |_| total project |_| subcontract price. |
| 6. | ||
| Type of work: | ||
| |_| New Construction | |_| Repair | |_| Renovation |
| 7. |
| Customer/Owner Name: |
| Point of Contact Name/Title: (person with project knowledge) |
| POC Phone Number: |
| POC Email Address: |
| 8. | |
| Were you the Prime contractor for this project? | |
| |_| Yes | |_| No |
| Were you a subcontractor for this project? | |
| |_| Yes | |_| No |
| If subcontractor, who was the Prime contractor? |
| 9. |
| Type of Contract (check all that apply): |
|_| Design-Build |_| Design-Bid-Build (fully designed project)
| |_| Other (explain): |
| If Design-Build, provide the following information: |
| |_| Design accomplished in-house |
| Lead design firm name: |
| Years working together: |
| Address: |
10. Provide a detailed description of the project:
11. Percentage of work you self-performed on this project: %.
Provide a detailed description of the work your firm self-performed on this project:
Form may be expanded. Please DO NOT change content of the form
File details come from the government source that posted it. Updated .