About this file

The provided file is a Project Matrix Template Excel spreadsheet designed to capture detailed information about construction project experience, particularly for federal contract opportunities. The template includes columns for project details such as project title, location, completion year, prime/sub status, contract type, project scope, complexity, and specific experience criteria like working in occupied facilities, secure areas, congested industrial zones, multi-year schedules, and federal facility work.

The accompanying federal contract opportunity is a Military Construction (MILCON) Design-Bid-Build project by the Department of the Navy Naval Facilities Engineering Command to upgrade the electrical distribution system at the Gosport Substation in Norfolk Naval Shipyard. The $100-$250 million project involves replacing power transformers, distribution switchgear, modernizing the SCADA system, increasing system capacity to 168 MVA, demolishing two existing substation buildings, and completing two microtunnel railroad crossings. The solicitation (N6247025R0006) is open to all businesses, requires demonstrated construction experience of $50 million, and has a submission deadline of August 8, 2025, with an estimated performance period of approximately 5 years.

View the file

Other files

File Type Posted
P732 Sources Sought notice.pdf PDF
P732 Project Matrix Template.xlsx XLSX spreadsheet
P732 DBB GASPORT SUBSTATION Sources Sought notice - Copy.pdf PDF
Contractor Information Form.docx DOCX document
Project Information Form.docx DOCX document
PLA Request for Information.docx DOCX document
Project Matrix Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

SIZESCOPECOMPLEXITY
#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedA final construction cost of $50M or greaterProjects demonstrating experience with construction of utility substations and underground duct
banks plus demolitiona) Work within occupied facility, especially minimizing service interruptionsb) Work within secure or restricted areasc) Experience with projects in congested industrial areas with limited construction laydown space
and parkingd) Work with multi-year project schedulese) Work on Federal facilitiesf) Experience with micro tunneling
1
2
3
4
5
General Information:Bonding CapacityUEICageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices

File details come from the government source that posted it. Updated .