This document is a Request for Information (RFI) for a Project Labor Agreement (PLA) for a large-scale construction project at a naval shipyard in Virginia. The project involves upgrading electrical distribution systems, power storage, and onsite generation to enhance microgrid capacity and resilience, with an estimated construction value between $100 million and $250 million and a performance period of approximately 1,825 calendar days. The Navy is seeking input from potential contractors, unions, and stakeholders regarding the implementation of a Project Labor Agreement, which is mandatory for federal construction projects exceeding $35 million under Executive Order 14063.
The RFI includes a detailed questionnaire asking respondents to provide insights on labor availability (union and non-union), potential project participation, comparative wage rates, and potential cost implications of a PLA. Responses are required by August 8 at 2:00 PM local time and should be submitted via email to Stephanie Wray. The related federal contract opportunity (Solicitation N6247025R0006) specifically involves electrical distribution system upgrades at Norfolk Naval Shipyard, including transformer replacements, switchgear modernization, SCADA system updates, and demolition of existing substation facilities. The project will follow a design-bid-build approach and is classified under NAICS Code 237130 for Power and Communication Line Construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P732 Project Matrix Template.xlsx | XLSX spreadsheet | |
| P732 Sources Sought notice.pdf | ||
| Project Matrix Template.xlsx | XLSX spreadsheet | |
| Project Matrix Template.xlsx | XLSX spreadsheet | |
| P732 DBB GASPORT SUBSTATION Sources Sought notice - Copy.pdf | ||
| Contractor Information Form.docx | DOCX document | |
| Project Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Labor Agreement (PLA) Request for Information (RFI) for Construction Project for building and heavy construction in the State of Virginia
This is a request for information/market survey. This is not a request for proposal, request for quote, or an invitation for bid. There will be no solicitation, specification, or drawings available at this time.
Naval Facilities Engineering Systems Command (NAVFAC) Atlantic is soliciting comments from the public addressing the potential use of Project Labor Agreements (PLA) for the following construction project. The construction project is for a building and heavy construction. Construction may include, but is not limited to, upgrades and modifications to shipyard power distribution, energy storage, and onsite generation to increase capacity, capability, and resiliency of the microgrid located in the State of Maine. Project will be design-bid-build. NAICS Code: 237130, Power and Communication Line and Related Structures Construction. The magnitude of construction is anticipated to be between $100,000,000 and $250,000,000. General period of performance is anticipated to be approximately 1825 calendar days.
A PLA is defined as a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement as described in 29 U.S.C. 158 (f). Federal Acquisition Regulation (FAR) policy states: Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use PLAs in large-scale construction projects (defined as a construction project with a total estimated cost at or above $35M) to promote economy and efficiency in the administration and completion of Federal construction projects. When awarding a contract in connection with a large-scale construction project, agencies shall require use of a PLA for contractors and subcontractors engaged in construction on the project, unless an exception(s) at FAR 22.504(d) applies. Reference is made to: FAR Subpart 22.5 Use of Project Labor Agreements for Federal Construction Projects; provision, FAR 52.222-33 Notice of Requirement for Project Labor Agreement; and to clause, FAR 52.222-34 Project Labor Agreement.
In consideration of the above factors, and any others which may be deemed appropriate, the public is invited to provide responses on the use of a PLA for this construction project utilizing the attached questionnaire.
This is not an announcement of the availability of a solicitation nor is it a means of generating a plan holder’s list. This survey is for planning purposes only and shall not be construed as a Request for Proposal or as an obligation on the part of the Government. The Government does not intend to award a contract on the basis of this market survey or otherwise pay for the requested information. The Government will not provide a debriefing on the results of this survey. All information will be held in a confidential manner and will only be used for the purposes intended.
Responses shall be submitted on the attached questionnaire via email to Stephanie Wray at Stephanie.L.Wray2.civ@us.navy.mil no later than FRIDAY 08 AUGUST AT 14:00 at 14:00 Norfolk, Virginia local time.
Project Labor Agreement (PLA) Questionnaire
| Questions |
| Responses |
1) Are you responding as a representative of a government entity, union, contractor (union or non-union) and/or qualified small business?
2) Would the work involve specialized construction that is available from only a limited number of contractors or subcontractors? Explain in detail.
3) What is your understanding of the availability of union labor and non-union labor in this area for this type of project? Are you otherwise aware of national, regional, or local interest in participating in this project by union or non-union contractors. Explain in detail.
4) As a qualified contractor for a project of this type, would you be interested in participating in this project?
Would the requirement of a PLA under this project impact your interest in any way? Explain in detail.
5) Are you aware of PLAs having been used on other similar construction projects in the area and/or other nearby areas? Explain in detail.
6) How do union wage rates compare to prevailing wage rates for this type of project and in this area, i.e., prevailing wage rates under the Construction Wage Rates Requirements statute (formerly known as the Davis-Bacon Act). Explain in detail.
7) Are there any ways in which the requirement of a PLA might increase costs on a project of this type in this area? Explain in detail.