About this file

The document is a Project Matrix Template Excel file related to a Military Construction Project (MILCON) Pre-Solicitation for Electrical Distribution System Upgrades at Norfolk Naval Shipyard. The project, solicitation number N6247025R0006, involves comprehensive electrical infrastructure improvements at the Gosport Substation, including replacing primary power service transformers, upgrading distribution switchgear, and modernizing the electric supervisory control and data acquisition (SCADA) system.

Key project specifics include increasing total system capacity to 168 MVA with three primary transformers, replacing existing Dominion Gosport Industrial Transformers, installing new switchgear with climate-controlled housing, connecting primary feeders to backbone ductbank, and demolishing two existing switch/substation facilities. The project requires detailed documentation of past performance, with a template capturing project details such as construction cost, urban work experience, project sequencing, schedule performance, and risk management capabilities. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command and involves complex electrical infrastructure upgrades at a critical naval shipyard facility.

View the file

Other files

File Type Posted
P732 Sources Sought notice.pdf PDF
P732 Project Matrix Template.xlsx XLSX spreadsheet
Project Matrix Template.xlsx XLSX spreadsheet
P732 DBB GASPORT SUBSTATION Sources Sought notice - Copy.pdf PDF
Contractor Information Form.docx DOCX document
Project Information Form.docx DOCX document
PLA Request for Information.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

SIZESCOPECOMPLEXITY
#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year)Was your firm Prime or Sub?DB or DBBDoD / FedA final construction cost of $100M or greaterProject demonstrating experience with water and/or power distribution. (1 water and 1 power OR 2 with both)a) Work within congested urban or industrial areas with limited construction laydown spaceb) Detailed sequencing of work, including approval from stakeholders for outagesc) Experience with multi-year porojects with consistentkly high scheduyle performance throughout the projectd) Demonstrated ability to identify schedule risks in advance, develop corrective actions and implement solutions to regain schedule compliance.
1
2
3
4
5
General Information:Bonding CapacityUEICageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices

File details come from the government source that posted it. Updated .