Project Matrix Template.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- N6247025R0006
About this file
The document is a Project Matrix Template Excel file related to a Military Construction Project (MILCON) Pre-Solicitation for Electrical Distribution System Upgrades at Norfolk Naval Shipyard. The project, solicitation number N6247025R0006, involves comprehensive electrical infrastructure improvements at the Gosport Substation, including replacing primary power service transformers, upgrading distribution switchgear, and modernizing the electric supervisory control and data acquisition (SCADA) system.
Key project specifics include increasing total system capacity to 168 MVA with three primary transformers, replacing existing Dominion Gosport Industrial Transformers, installing new switchgear with climate-controlled housing, connecting primary feeders to backbone ductbank, and demolishing two existing switch/substation facilities. The project requires detailed documentation of past performance, with a template capturing project details such as construction cost, urban work experience, project sequencing, schedule performance, and risk management capabilities. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command and involves complex electrical infrastructure upgrades at a critical naval shipyard facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| P732 Sources Sought notice.pdf | ||
| P732 Project Matrix Template.xlsx | XLSX spreadsheet | |
| Project Matrix Template.xlsx | XLSX spreadsheet | |
| P732 DBB GASPORT SUBSTATION Sources Sought notice - Copy.pdf | ||
| Contractor Information Form.docx | DOCX document | |
| Project Information Form.docx | DOCX document | |
| PLA Request for Information.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Example
| SIZE | SCOPE | COMPLEXITY | |||||||||
| # | Project Title (should match title listed on questionnaire) | Project Location (city, state) | Project Completed | ||||||||
| (year) | Was your firm Prime or Sub? | DB or DBB | DoD / Fed | A final construction cost of $100M or greater | Project demonstrating experience with water and/or power distribution. (1 water and 1 power OR 2 with both) | a) Work within congested urban or industrial areas with limited construction laydown space | b) Detailed sequencing of work, including approval from stakeholders for outages | c) Experience with multi-year porojects with consistentkly high scheduyle performance throughout the project | d) Demonstrated ability to identify schedule risks in advance, develop corrective actions and implement solutions to regain schedule compliance. | ||
| 1 | |||||||||||
| 2 | |||||||||||
| 3 | |||||||||||
| 4 | |||||||||||
| 5 | |||||||||||
| General Information: | Bonding Capacity | UEI | Cage | Address | SB Status | POC | POC Contact Information | Annual Revenue | #Offices |
File details come from the government source that posted it. Updated .