About this file

The file is a Project Matrix Template Excel spreadsheet for a military construction project related to electrical distribution system upgrades at Norfolk Naval Shipyard. The template provides a structured framework for documenting project details, including project complexity, title, location, completion year, and key project experience requirements. It includes sections for general information such as bonding capacity, UEI, CAGE code, small business status, point of contact, annual revenue, and number of offices.

The associated federal contract opportunity (Solicitation N6247025R0006) is a pre-solicitation for a Design-Bid-Build project involving electrical infrastructure upgrades at the Gosport Substation. The project scope includes replacing primary power service transformers, increasing system capacity to 168 MVA, modernizing the electric SCADA system, replacing switchgear, connecting primary feeders to backbone ductbank, demolishing two existing switch/substation facilities, and constructing two microtunnel railroad crossings for electrical ductbanks. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command and requires detailed responses to a PLA questionnaire.

View the file

Other files

File Type Posted
P732 Sources Sought notice.pdf PDF
Project Matrix Template.xlsx XLSX spreadsheet
P732 DBB GASPORT SUBSTATION Sources Sought notice - Copy.pdf PDF
Contractor Information Form.docx DOCX document
Project Information Form.docx DOCX document
PLA Request for Information.docx DOCX document
Project Matrix Template.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Example

SIZESCOPECOMPLEXITY
#Project Title (should match title listed on questionnaire)Project Location (city, state)Project Completed
(year); <10 yearsWas your firm Prime or Sub?DB or DBBDoD / FedA final construction cost; one project >$50MProjects demonstrating experience with power distribution.1) Construction of a medium voltage substation2) Construction of electrical below-grade ductbank & below-grade structures3) Demonstrate experience in microtunneling
1
2
3
4
5
General Information:Bonding CapacityUEICageAddressSB StatusPOCPOC Contact InformationAnnual Revenue#Offices

File details come from the government source that posted it. Updated .