Lolo Motorway Phase II & Saddle Camp Pit Development: Nez Perce-Clearwater National Forests
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12363N21R4003
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Kooskia, Idaho 83539, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks road reconstruction and pit development services on the Nez Perce-Clearwater National Forests in Idaho. The U.S. Department of Agriculture Forest Service requires completing approximately 9.5 miles of road reconditioning, 4 miles of full depth reclamation, culvert replacement and installation, road widening, drainage improvements, and placement of 4000 tons of type F and 1000 tons of type M crushed aggregate. Proposals were due August 11, 2021 and the work must be completed between September 2021 through September 2022. Evaluation will be based on technical qualifications, past performance, and price/cost.
This total small business set-aside has a government estimated value between $250,000 to $500,000. The work includes crushing over 5000 tons of various aggregates at the Saddle Camp Pit in addition to the road reconstruction requirements. All labor, equipment, materials and incidentals must be provided by the contractor to finish by September 30, 2022. The place of performance is in Idaho County, Idaho along the Nez Perce-Clearwater National Forests. The solicitation was issued on July 6, 2021 by the Forest Service contracting office in Grangeville, Idaho.
Notice text
4 versions
Update #4 · Latest ·
This contract requires completion of Lolo Motorway (Road #500) Phase 2 Road Reconstruction and Saddle Camp Pit Development. The project is located on the Nez Perce-Clearwater National Forest, Idaho County, Idaho. The road reconstruction work requires completing approximately 9.5 miles of road reconditioning, 4 miles of full depth reclamation and hauling/placing aggregate. In addition, 12,” 18,” and 36,” culverts shall be removed and replaced; excavation and embankment shall be performed to widen existing sections of road that are too narrow for safe passage; the road shall be shaped to provide appropriate drainage; ditches and catch basins of existing culverts shall be cleaned; and drivable drainage dips shall be installed.
The pit development work requires crushing 4000 tons of type F Gradation, 1000 tons of type M Gradation, and 128 cubic yards of Class 2 riprap; aggregate crushed shall be hauled and placed on the Lolo Motorway. In addition, roadway reconditioning and clearing and grubbing will be performed to maintain the 5905 Road, which accesses the pit from Road #107.
The contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designed as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
The road being reconstructed is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take Woodland Road 0.50 Miles. Turn right onto Glenwood for approximately 11.3 miles to Road #100 which is an extension of Tommy Taha Connect. Stay on Road #100 for approximately 16.2 miles to Road #103. Turn right on Road #103 for approximately 14.8 miles to the junction with Road #104. Turn right on Road #104 for approximately 0.75 miles to the junction with Road #500 – Pete’s Fork Junction (MP 22.59) start of project. This project is located on the Lochsa Ranger District and begins in Township 36 North, Range 7 East, continues through T36N, R8E; T36N, R9E; T36N, R10E; T37N, R10E; and ends in Township 37 North, Range 11 East, at Road #500 junction with Road #107.
The Saddle Camp pit is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take U.S. Highway 12 to Road 107 to Road 5905 to access pit. This project is located on the Lochsa-Powell Ranger District in Section 4, Township 36 North, Range 11 East of the Boise Meridian.
The Government cost estimate, per FAR 36.204, is between $250,000 - $500,000.
A pre-bid tour was planned for August 15, 2021 but cancelled via Amendment 1. See Sections C and L of the solicitation for details. The estimated start date is 9/1/2021. All work shall be completed by 10/30/2022 per Amendment 2. There are special performance requirements detailed in FAR 52.211-10 Alt I in Section F. Please read this clause closely after reviewing the solicitation specifications and drawings. If the requirements of this Section would limit competition or cause siginificant price inflation, please email your concerns to Karen Ruklic at karen.ruklic@usda.gov.
The complete solicitation with all attachments was issued/advertised on 7/6/2021. The project has been solicited as total small business set-aside. All responsible sources may submit a quotation which shall be considered by the agency.
The Contracting Officer for this project, Karen Ruklic, works out of the Nez Perce-Clearwater National Forests Grangeville office. The physical address is 104 Airport Road, Grangeville, ID 83530.
PRE-BID TOUR PLANNED FOR 7/15/21 HAS BEEN CANCELLED DUE TO THE EXTREME FIRE CONDITIONS AND ASSOCIATED ROAD CLOSURES. See Amendment 1.
Amendment 2 was issued on 7/22/21 to extend the contract completion deadline and amend the special timing requirements due to the extreme fire season. Also, photos of the Lolo Motorway were provided via Attachment J-8 and a cut and paste error on Amendment 1 was corrected. Amendment 3 extended the deadline for receipt of offers to 8/11/2021.
Update #3 ·
This contract requires completion of Lolo Motorway (Road #500) Phase 2 Road Reconstruction and Saddle Camp Pit Development. The project is located on the Nez Perce-Clearwater National Forest, Idaho County, Idaho. The road reconstruction work requires completing approximately 9.5 miles of road reconditioning, 4 miles of full depth reclamation and hauling/placing aggregate. In addition, 12,” 18,” and 36,” culverts shall be removed and replaced; excavation and embankment shall be performed to widen existing sections of road that are too narrow for safe passage; the road shall be shaped to provide appropriate drainage; ditches and catch basins of existing culverts shall be cleaned; and drivable drainage dips shall be installed.
The pit development work requires crushing 4000 tons of type F Gradation, 1000 tons of type M Gradation, and 128 cubic yards of Class 2 riprap; aggregate crushed shall be hauled and placed on the Lolo Motorway. In addition, roadway reconditioning and clearing and grubbing will be performed to maintain the 5905 Road, which accesses the pit from Road #107.
The contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designed as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
The road being reconstructed is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take Woodland Road 0.50 Miles. Turn right onto Glenwood for approximately 11.3 miles to Road #100 which is an extension of Tommy Taha Connect. Stay on Road #100 for approximately 16.2 miles to Road #103. Turn right on Road #103 for approximately 14.8 miles to the junction with Road #104. Turn right on Road #104 for approximately 0.75 miles to the junction with Road #500 – Pete’s Fork Junction (MP 22.59) start of project. This project is located on the Lochsa Ranger District and begins in Township 36 North, Range 7 East, continues through T36N, R8E; T36N, R9E; T36N, R10E; T37N, R10E; and ends in Township 37 North, Range 11 East, at Road #500 junction with Road #107.
The Saddle Camp pit is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take U.S. Highway 12 to Road 107 to Road 5905 to access pit. This project is located on the Lochsa-Powell Ranger District in Section 4, Township 36 North, Range 11 East of the Boise Meridian.
The Government cost estimate, per FAR 36.204, is between $250,000 - $500,000.
A pre-bid tour was planned for August 15, 2021 but cancelled via Amendment 1. See Sections C and L of the solicitation for details. The estimated start date is 9/1/2021. All work shall be completed by 10/30/2022 per Amendment 2. There are special performance requirements detailed in FAR 52.211-10 Alt I in Section F. Please read this clause closely after reviewing the solicitation specifications and drawings. If the requirements of this Section would limit competition or cause siginificant price inflation, please email your concerns to Karen Ruklic at karen.ruklic@usda.gov.
The complete solicitation with all attachments was issued/advertised on 7/6/2021. The project has been solicited as total small business set-aside. All responsible sources may submit a quotation which shall be considered by the agency.
The Contracting Officer for this project, Karen Ruklic, works out of the Nez Perce-Clearwater National Forests Grangeville office. The physical address is 104 Airport Road, Grangeville, ID 83530.
PRE-BID TOUR PLANNED FOR 7/15/21 HAS BEEN CANCELLED DUE TO THE EXTREME FIRE CONDITIONS AND ASSOCIATED ROAD CLOSURES. See Amendment 1.
Amendment 2 was issued on 7/22/21 to extend the contract completion deadline and amend the special timing requirements due to the extreme fire season. Also, photos of the Lolo Motorway were provided via Attachment J-8 and a cut and paste error on Amendment 1 was corrected.
Update #2 ·
This contract requires completion of Lolo Motorway (Road #500) Phase 2 Road Reconstruction and Saddle Camp Pit Development. The project is located on the Nez Perce-Clearwater National Forest, Idaho County, Idaho. The road reconstruction work requires completing approximately 9.5 miles of road reconditioning, 4 miles of full depth reclamation and hauling/placing aggregate. In addition, 12,” 18,” and 36,” culverts shall be removed and replaced; excavation and embankment shall be performed to widen existing sections of road that are too narrow for safe passage; the road shall be shaped to provide appropriate drainage; ditches and catch basins of existing culverts shall be cleaned; and drivable drainage dips shall be installed.
The pit development work requires crushing 4000 tons of type F Gradation, 1000 tons of type M Gradation, and 128 cubic yards of Class 2 riprap; aggregate crushed shall be hauled and placed on the Lolo Motorway. In addition, roadway reconditioning and clearing and grubbing will be performed to maintain the 5905 Road, which accesses the pit from Road #107.
The contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designed as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
The road being reconstructed is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take Woodland Road 0.50 Miles. Turn right onto Glenwood for approximately 11.3 miles to Road #100 which is an extension of Tommy Taha Connect. Stay on Road #100 for approximately 16.2 miles to Road #103. Turn right on Road #103 for approximately 14.8 miles to the junction with Road #104. Turn right on Road #104 for approximately 0.75 miles to the junction with Road #500 – Pete’s Fork Junction (MP 22.59) start of project. This project is located on the Lochsa Ranger District and begins in Township 36 North, Range 7 East, continues through T36N, R8E; T36N, R9E; T36N, R10E; T37N, R10E; and ends in Township 37 North, Range 11 East, at Road #500 junction with Road #107.
The Saddle Camp pit is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take U.S. Highway 12 to Road 107 to Road 5905 to access pit. This project is located on the Lochsa-Powell Ranger District in Section 4, Township 36 North, Range 11 East of the Boise Meridian.
The Government cost estimate, per FAR 36.204, is between $250,000 - $500,000.
A pre-bid tour is planned for August 15, 2021. See Sections C and L of the solicitation for details. The estimated start date is 9/1/2021. All work shall be completed by 09/30/2022. There are special performance requirements detailed in FAR 52.211-10 Alt I in Section F. Please read this clause closely after reviewing the solicitation specifications and drawings. If the requirements of this Section would limit competition or cause siginificant price inflation, please email your concerns to Karen Ruklic at karen.ruklic@usda.gov.
The complete solicitation with all attachments was issued/advertised on 7/6/2021. The project has been solicited as total small business set-aside. All responsible sources may submit a quotation which shall be considered by the agency.
The Contracting Officer for this project, Karen Ruklic, works out of the Nez Perce-Clearwater National Forests Grangeville office. The physical address is 104 Airport Road, Grangeville, ID 83530.
PRE-BID TOUR PLANNED FOR 7/15/21 HAS BEEN CANCELLED DUE TO THE EXTREME FIRE CONDITIONS AND ASSOCIATED ROAD CLOSURES. See Amendment 1.
Update #1 ·
This contract requires completion of Lolo Motorway (Road #500) Phase 2 Road Reconstruction and Saddle Camp Pit Development. The project is located on the Nez Perce-Clearwater National Forest, Idaho County, Idaho. The road reconstruction work requires completing approximately 9.5 miles of road reconditioning, 4 miles of full depth reclamation and hauling/placing aggregate. In addition, 12,” 18,” and 36,” culverts shall be removed and replaced; excavation and embankment shall be performed to widen existing sections of road that are too narrow for safe passage; the road shall be shaped to provide appropriate drainage; ditches and catch basins of existing culverts shall be cleaned; and drivable drainage dips shall be installed.
The pit development work requires crushing 4000 tons of type F Gradation, 1000 tons of type M Gradation, and 128 cubic yards of Class 2 riprap; aggregate crushed shall be hauled and placed on the Lolo Motorway. In addition, roadway reconditioning and clearing and grubbing will be performed to maintain the 5905 Road, which accesses the pit from Road #107.
The contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designed as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
The road being reconstructed is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take Woodland Road 0.50 Miles. Turn right onto Glenwood for approximately 11.3 miles to Road #100 which is an extension of Tommy Taha Connect. Stay on Road #100 for approximately 16.2 miles to Road #103. Turn right on Road #103 for approximately 14.8 miles to the junction with Road #104. Turn right on Road #104 for approximately 0.75 miles to the junction with Road #500 – Pete’s Fork Junction (MP 22.59) start of project. This project is located on the Lochsa Ranger District and begins in Township 36 North, Range 7 East, continues through T36N, R8E; T36N, R9E; T36N, R10E; T37N, R10E; and ends in Township 37 North, Range 11 East, at Road #500 junction with Road #107.
The Saddle Camp pit is located approximately 43.5 miles east of Kamiah, Idaho. From Kamiah, take U.S. Highway 12 to Road 107 to Road 5905 to access pit. This project is located on the Lochsa-Powell Ranger District in Section 4, Township 36 North, Range 11 East of the Boise Meridian.
The Government cost estimate, per FAR 36.204, is between $250,000 - $500,000.
A pre-bid tour is planned for August 15, 2021. See Sections C and L of the solicitation for details. The estimated start date is 9/1/2021. All work shall be completed by 09/30/2022. There are special performance requirements detailed in FAR 52.211-10 Alt I in Section F. Please read this clause closely after reviewing the solicitation specifications and drawings. If the requirements of this Section would limit competition or cause siginificant price inflation, please email your concerns to Karen Ruklic at karen.ruklic@usda.gov.
The complete solicitation with all attachments was issued/advertised on 7/6/2021. The project has been solicited as total small business set-aside. All responsible sources may submit a quotation which shall be considered by the agency.
The Contracting Officer for this project, Karen Ruklic, works out of the Nez Perce-Clearwater National Forests Grangeville office. The physical address is 104 Airport Road, Grangeville, ID 83530.
Files
| File | Type | Posted |
|---|---|---|
| Amendment3_SF30_ExtendOfferDeadline.doc | DOC document | |
| Amendment2_SF30_ChgDeadlines_SitePhotos.doc | DOC document | |
| Amendment2_AttachmentJ8_LoloMotorwayPhaseII_SitePhotos.docx | DOCX document | |
| Amendment1_SF30_CancelPre-BidTour.doc | DOC document | |
| AttachmentJ3_LoloMotorwayPhase2_Drawings.pdf | ||
| AttachmentJ6_SaddleCampPitPreliminaryEvaluation.pdf | ||
| AttachmentJ5_WageDecision_Hwy.pdf | ||
| AttachmentJ7_PastPerformanceQuestionnaire.doc | DOC document | |
| AttachmentJ4_SaddleCampPitCrushing_Drawings.pdf | ||
| AttachmentJ2_SaddleCampPitCrushing_FSSS.docx | DOCX document | |
| AttachmentJ1_LoloMotorwayPhase2_FSSS.docx | DOCX document | |
| RFP_LoloMotorway_SaddleCampCrushing.pdf |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Lolo Motorway Phase II & Saddle Camp Pit Development: Nez Perce-Clearwater National Forests | Award Notice | |
| This notice | Solicitation | |
| Lolo Motorway Phase II & Saddle Camp Pit Development: Nez Perce-Clearwater National Forests | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Champion Creek Pit Rock Crushing Supply | Forest Service | Total Small Business | |
| End of the World Long Term Stewardship | Forest Service | No set-aside | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity