AttachmentJ4_SaddleCampPitCrushing_Drawings.pdf
PDF 4 MB Posted
- Attached to
- Lolo Motorway Phase II & Saddle Camp Pit Development: Nez Perce-Clearwater National Forests
- Solicitation number
- 12363N21R4003
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation package outlines requirements for a road reconstruction and pit development project on the Nez Perce-Clearwater National Forests in Idaho. Work includes completing approximately 9.5 miles of road reconditioning, 4 miles of full depth reclamation, and hauling and placing aggregate on Lolo Motorway Phase II. It also requires crushing 4000 tons of Type F gradation aggregate, 1000 tons of Type M gradation, and 128 cubic yards of Class 2 riprap at the Saddle Camp pit site, along with related pit development and road maintenance work. Bidders must furnish all labor, equipment, materials, and incidentals to complete the project by September 30th, 2022. A pre-bid tour will be held on August 15th, 2021. The solicitation was issued on July 6th, 2021 as a total small business set-aside, with bids due on August 6th, 2021. The Department of Agriculture Forest Service is the contracting agency, and the Contracting Officer is Karen Ruklic located in Grangeville, Idaho.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment3_SF30_ExtendOfferDeadline.doc | DOC document | |
| Amendment2_SF30_ChgDeadlines_SitePhotos.doc | DOC document | |
| Amendment2_AttachmentJ8_LoloMotorwayPhaseII_SitePhotos.docx | DOCX document | |
| Amendment1_SF30_CancelPre-BidTour.doc | DOC document | |
| AttachmentJ5_WageDecision_Hwy.pdf | ||
| AttachmentJ7_PastPerformanceQuestionnaire.doc | DOC document | |
| AttachmentJ3_LoloMotorwayPhase2_Drawings.pdf | ||
| AttachmentJ6_SaddleCampPitPreliminaryEvaluation.pdf | ||
| AttachmentJ1_LoloMotorwayPhase2_FSSS.docx | DOCX document | |
| RFP_LoloMotorway_SaddleCampCrushing.pdf | ||
| AttachmentJ2_SaddleCampPitCrushing_FSSS.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY OF QUANTITIES
PROJECT:
SADDLE
CAMP PIT
CRUSHING
SHEET TITLE:
SUMMARY OF
QUANTITIES
WORKLIST ROAD 5905
SHEET NO.
U S
D
E P
A R
T M
E N
T
O F
A
G R
I C
U L
T U
R E
F O
R E
S T
E R
V I C
E
R E
G I O
N
O
N E
N E
Z
P
E R
C E
C L
E A
R W
A T
E R
N A
T I O
N A
L
F
O R
E S
T S
D E
S I G
N E
D
C H
E C
K E
D
D R
A W
N
S U
B M
I T
T E
D
A P
P R
O V
E D
R E
V I S
I O
N S
D E
S I G
N E
D
C H
E C
K E
D
D R
A W
N
TYPICAL ROAD SECTION WITHOUT DITCH
NOT TO SCALE
3'
INSLOPE, OUTSLOPE, OR CROWN WHEN
SPECIFIED IN THE WORKLIST. OTHERWISE
MAINTAIN EXISTING.
5'
CLEARING AND
GRUBBING
OUTER LIMITS
5'
CLEARING AND
GRUBBING
OUTER LIMITS
5'
CLEARING AND
GRUBBING OUTER
LIMITS
5'
CLEARING AND
GRUBBING OUTER LIMITS
4" ASC
6" ABC
ASC = Aggregate Surface Course
ABC = Aggregate Base Course
ITEM 30115 AGGREGATE SURFACE COURSE
WHERE SPECIFIED
ITEM 30103 AGGREGATE BASE COURSE
WHERE SPECIFIED
ITEM 30315 ROAD RECONDITIONING
TYPICAL SECTION
ITEMS 30201, 30207, 30315
15'
15'
TYPICAL ROAD SECTION WITH DITCH
NOT TO SCALE
14'
14'
ROADSIDE CLEARING LIMITS WITHOUT DITCH
NOT TO SCALE
5'
ROADSIDE
CLEARING
OUTER LIMITS
5'
ROADSIDE
CLEARING
OUTER LIMITS
5'
ROADSIDE CLEARING
OUTER LIMITS
5'
ROADSIDE CLEARING
OUTER LIMITS
VARIES
VARIES
ROADSIDE CLEARING LIMITS WITH DITCH
NOT TO SCALE
PROJECT:
SADDLE
CAMP PIT
CRUSHING
SHEET TITLE:
TYPICALS AND
DETAILS
SHEET NO.
U S
D
E P
A R
T M
E N
T
R
I C
U L
T U
R E
F O
R E
R
V I C
E
R E
G I O
N
O
N E
N E
Z
P
E R
C E
C L
E A
R W
A T
E R
N A
T I O
N A
L
F
O R
E S
T S
D E
S I G
N E
D
C H
E C
K E
D
D R
A W
N
S U
B M
I T
T E
D
A P
P R
O V
E D
R E
V I S
I O
N S
D E
S I G
N E
D
C H
E C
K E
D
D R
A W
N
NOTES: THESE ITEMS WILL BE ADDRESSED IN THE
CONTRACTORS PIT DEVELOPMENT PLAN.
POTENTIAL
AREA FOR
EXPANSION
POTENTIAL
AREA FOR
EXPANSION
PROPOSED
DEVELOPMENT
AREA
PROPOSED
DEVELOPMENT
AREA
AGGREGATE(GRADING M), AND 128 CY OF CLASS II RIPRAP.
2. ALL WORK SHALL CONFORM TO MINE SAFETY AND HEALTH (MSHA)
STANDARDS
3. THE CONTRACTOR IS RESPONSIBLE FOR SUBMITTING AND SIGNING
A TRAFFIC CONTROL PLAN FOR WHEN PIT OPERATIONS ARE
OCCURRING. THIS PLAN SHALL CONFORM TO ALL MSHA AND OSHA
REQUIREMENTS FOR THIS TYPE OF WORK.
4. MATERIAL SOURCE BOUNDARIES SHALL BE STAKED BY THE
CONTRACTOR AND APPROVED BY THE COR. ALL WORK PERTAINING
TO QUARRY DEVELOPMENT ARE SUBSIDIARY TO ITEM 31402A -
AGGREGATE SURFACE COURSE STOCKPILING, GRADING F.
5. THE CONTRACTOR IS RESPONSIBLE FOR LAYING OUT EXCAVATION
LIMITS IN ACCORDANCE WITH THE AGGREGATE SOURCE PLAN TO
ENSURE THERE IS SUFFICIENT QUANTITY OF MATERIAL TO PRODUCE
CONTRACT QUANTITIES OF AGGREGATE.
6. CLEARING, GRUBBING, AND SLASH CLEANUP SHALL CONFORM TO
FSSS 201 - CLEARING AND GRUBBING SPECIFICATIONS. CLEARING
LIMITS SHALL BE 15 FEET BEYOND EXCAVATION LIMITS.
PROPOSED
DEVELOPMENT
AREA
7. LOOSE, UNCONSOLIDATED MATERIAL SHALL BE STRIPPED DOWN
TO COMPETENT ROCK FOR AT LEAST 10 FEET HORIZONTALLY FROM
THE TOP OF THE EXCAVATION.
8. OVERBURDEN, TOPSOIL AND REJECT SHALL BE STOCKPILED IN
AREAS DESIGNATED BY THE FOREST SERVICE.
9. ALL OVERSIZE ROCK ENCOUNTERED SHALL BE REDUCED IN SIZE
AND UTILIZED.
CRUSHING
AREA
PROPOSED
DEVELOPMENT
AREA
STOCKPILING
AREA
10. CUT AND FILL SLOPES REQUIRED FOR DEVELOPMENT AND/OR
RESTORATION SHALL NOT BE CONSTRUCTED STEEPER THAN 2:1.
11. AT THE CONCLUSION OF OPERATIONS:
A). NO OVERHANG OR LOOSE ROCK SHALL BE LEFT ON THE
QUARRY WALL.
B). THE FLOOR PROCESSING AREAS SHALL BE GRADED TO
PROMOTE DRAINAGE AND TO PREVENT PONDING OF
SURFACE WATER
C). OVERBURDEN, TOPSOIL, AND REJECT MATERIAL (SAVED IN
ITEM 8 ABOVE) SHALL BE UNIFORMLY SPREAD WITHIN THE
DEVELOPMENT PERIMETER IN AREAS AND TO THE GRADES
SPECIFIED BY THE COR/ER.
12. RESTORATION OF ALL IMPROVEMENTS IN AND AROUND THE
EXCAVATION, CRUSHING, AND STOCKPILING AREAS IS REQUIRED AND
INCIDENTAL TO ITEM 31402A AND 31402B.
13). EROSION CONTROL AND/OR RESTORATION OF ROADS ADJACENT
TO THE DEVELOPMENT SITE MAY REQUIRE PLACING AGGREGATE
AND IS INCIDENTAL TO ITEM 31402A AND 31402B.
SHEET NO.
PROJECT:
SADDLE
CAMP PIT
CRUSHING
SHEET TITLE:
PIT
DEVELOPMENT
PLAN
R
O
D
R
O
D
A
C
C
E
R
A
D
U S
D
E P
A R
T M
E N
T
R
I C
U L T
U R
E
F O
R E
R
V I C
E
R E
G I O
N
O
N E
N E
Z
P
E R
C E
C L E
A R
W A
T E
R
N A
T I O
N A
L
F
O R
E S
T S
D E
S I G
N E
D
C H
E C
K E
D
D R
A W
N
S U
B M
I T
T E
D
A P
P R
O V
E D
R E
V I S
I O
N S
D E
S I G
N E
D
C H
E C
K E
D
D R
A W
N
1. CRUSH 4,000 TONS OF AGGREGATE (GRADING F), 1,000 TONS OF
| !Saddle Camp Pit Drawings Signed |
| !Saddle Camp DWGS_Signed |
| page1 |
| pg23 |
| Sheets and Views |
| C-GROUP-2 SUMMARY OF QUANTITIES & GENERAL NOTES |
| C-GROUP-3 TYPICAL SECTIONS |
| p4 |
| Sheets and Views |
| C-GROUP-4 DEVELOPEMENT PLAN |
pg5
| SaddleCampDrawingsJuly6.pdf |
| C-GROUP |
| page1 |
| page2 |
| Sheets and Views |
| C-GROUP-2 SUMMARY OF QUANTITIES & GENERAL NOTES |
| C-GROUP |
| pg23 |
| Sheets and Views |
| C-GROUP-3 TYPICAL SECTIONS |
| page4 |
| Sheets and Views |
| C-GROUP-4 DEVELOPEMENT PLAN |
| C-GROUP |
| pg5 |