Amendment1_SF30_CancelPre-BidTour.doc
DOC document 69 KB Posted
- Attached to
- Lolo Motorway Phase II & Saddle Camp Pit Development: Nez Perce-Clearwater National Forests
- Solicitation number
- 12363N21R4003
- Issued by
-
Department of Agriculture Forest Service
About this file
This amendment modifies a solicitation for road reconstruction and pit development services on the Nez Perce-Clearwater National Forests in Idaho. The solicitation requires completion of approximately 9.5 miles of road reconditioning, 4 miles of full depth reclamation, installation of culverts and drainage features, and shaping of the road for drainage on Lolo Motorway Phase II. An additional requirement is development of the Saddle Camp Pit, including crushing aggregate and hauling and placing material, as well as roadwork and clearing to access the pit. The estimated price range for the work is $250,000 to $500,000 and the completion date is September 30th, 2022. The pre-bid meeting was cancelled due to fire conditions and the solicitation response deadline remains unchanged. The solicitation was issued on July 6th as a total small business set-aside and is being conducted by the Forest Service, Nez Perce-Clearwater National Forests office in Grangeville, Idaho.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment3_SF30_ExtendOfferDeadline.doc | DOC document | |
| Amendment2_SF30_ChgDeadlines_SitePhotos.doc | DOC document | |
| Amendment2_AttachmentJ8_LoloMotorwayPhaseII_SitePhotos.docx | DOCX document | |
| AttachmentJ5_WageDecision_Hwy.pdf | ||
| AttachmentJ7_PastPerformanceQuestionnaire.doc | DOC document | |
| AttachmentJ3_LoloMotorwayPhase2_Drawings.pdf | ||
| AttachmentJ6_SaddleCampPitPreliminaryEvaluation.pdf | ||
| AttachmentJ1_LoloMotorwayPhase2_FSSS.docx | DOCX document | |
| RFP_LoloMotorway_SaddleCampCrushing.pdf | ||
| AttachmentJ4_SaddleCampPitCrushing_Drawings.pdf | ||
| AttachmentJ2_SaddleCampPitCrushing_FSSS.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 1 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 1 |
| 07/13/2021 |
| 1024138 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
USDA - Forest Service Procurement Property and Services National Stewardship Branch Grangeville Office, 104 Airport Road Grangeville, ID 83530 USDA - Forest Service Procurement Property and Services National Stewardship Branch Grangeville Office, 104 Airport Road Grangeville, ID 83530
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
| X |
| 12363N21R4003 |
9B. DATED (SEE ITEM 11)
07/06/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 1 and 2.
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Lolo Motorway Phase II and Saddle Camp Pit Development Lochsa Ranger District; Nez Perce-Clearwater National Forests
1. Amend Section C-1 (f) Pre-Bid Tour. Strike sentence 1 and replace with the following 2 sentences: “The organized pre-bid tour has been cancelled due to the extreme fire conditions and related road closures. The meeting shall not be rescheduled.” Strike paragraphs 2 and 3 within this section in their entirety.
2. Amend I-7, FAR 52.236-2 Site Visit to revert to the provision in it’s basic form (no Alternate I). Strike paragraph (b) and replace with:
(b) Site visits may be arranged during normal duty hours by contacting:Brandon Anderson via email: brandon.anderson4@usda.gov.
Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
KAREN RUKLIC
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
SOLICITATION: 12363N21R4001
Crooked River Valley Rehabilitation – Phase 4 Amendment 1, Page 2 of 2 Dated 5/19/2021
1. Amend Attachment J-2 Drawings, Crooked River Valley Rehabilitation Phase 4, Sheet 4.1- under Method of Work Area Isolation. Strike the following language: “In increments over 1 to 2 days to reduce turbidity”. Contractor shall follow language in Section C-1 (c) stating that watering the new channel shall occur slowly over at least 3 days.
2. Amend Attachment J-2 Drawings, Crooked River Valley Rehabilitation Phase 4, Sheet 5.1. Strike the words “construct side channel from Station 1+00 to 7+00”.
3. Amend Section C-1(c), paragraph 7 at the bottom of page 7. Strike the words “adjacent to the bridge” and add the following sentence after sentence 7 ending in “after July 15”: “No instream work shall occur before fish salvage is complete”.
4. Amend Attachment J-2 Drawings, Crooked River Valley Rehabilitation Phase 4, Sheet 1, General Note 12. Add the following sentence. “If existing ground planned for cut/fill is within +/- 1 foot of the planned elevation, trees and vegetation there may be left standing”.
RESPONDENT SHALL ACKNOWLEDGE RECEIPT OF THIS AMENDMENT BY ONE OF THE METHODS OUTLINED IN BLOCK 11 OF THE SF-30 FORM. DEADLINE FOR RECEIPT OF OFFERS REMAINS UNCHANGED.