JBCHS - Wastewater Treatment Operation and Maintenance

Closed Pre-Solicitation Posted

Solicitation number
Joint-Base-Charleston_WastewaterTreatmentPlant(2)
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
221320 Sewage Treatment Facilities
Place of performance
South Carolina 29461, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Joint Base Charleston, located in Charleston, South Carolina, is seeking a contractor to provide comprehensive wastewater treatment plant (WWTP) operation and maintenance services for the Joint Base Charleston-Weapon Station Short Stay Recreational Area on Lake Moultrie in Moncks Corner, South Carolina. This pre-solicitation notice is issued by the Department of the Air Force Air Mobility Command for market research purposes only, and responses will inform the government's subsequent acquisition decisions but will not constitute adequate responses to any future formal solicitation. The contractor must manage all aspects of a Pro-Water Systems C-30-HS model treatment facility with a design flow of 30,000 gallons per day, including the water distribution system, wastewater collection system, and RV dump station, maintaining 24/7/365 operations with preventative maintenance, repairs, water quality testing, and compliance with federal, state, and local regulations including Air Force Instructions and NPDES permit SCG570000. The contractor must demonstrate capability to provide these services and submit responses via email to the listed government contacts by Wednesday, February 11, 2026, at 5:00 PM Eastern Standard Time, including company information, point of contact details, and demonstration of qualifications. Evaluation criteria will focus on contractor capability to maintain all systems in constant operational status while meeting stringent compliance requirements and service response times.

This procurement is designated as a Total Small Business set-aside, meaning only qualified small businesses may respond. The Performance Work Statement indicates no current incumbent is identified, establishing this as a new contract requirement. The facility consists of 24,146 linear feet of water distribution pipe with three backflow preventers, 2,515 feet of wastewater collection piping with 17 manholes, and two 7,500-gallon RV dump station holding tanks for a combined capacity of 15,000 gallons. The contractor must maintain a South Carolina Group B-B (or higher) certified WWTP operator on-site during normal operating hours (0730-1700) with after-hours availability, perform emergency response within one hour with remedy completion within 24 hours, and conduct routine corrective maintenance within 30 days. The base year contract includes estimated bi-annual pump-out services of 460,000 gallons annually, with subsequent option years requiring 200,000 gallons of pump-and-haul services; service calls up to $500 are included at no additional cost, with costs above that threshold requiring written quotes and government approval.

Notice text

THIS IS NOT A SOLICITATION ANNOUNCEMENT. THIS IS A SOURCES SOUGHT ANNOUNCEMENT ONLY. THE PURPOSE OF THIS ANNOUNCEMENT IS FOR MARKET RESEARCH PURPOSES ONLY. RESPONSE TO THIS ANNOUNCEMENT WILL BE USED BY THE GOVERNMENT TO MAKE APPROPRIATE ACQUISITION DECISIONS. A SUBSEQUENT SOLICITATION ANNOUNCEMENT MAY FOLLOW. RESPONSES TO THIS ANNOUNCEMENT WILL NOT BE CONSIDERED AS AN ADEQUATE RESPONSE TO ANY FUTURE ANNOUNCEMENT. 

Joint Base Charleston, located in Charleston, SC seeks a contractor to provide all management, tools, supplies, equipment, transportation, labor, supervision and management necessary to provide Waste Water Treatment Plant (WWTP) operation and maintenance services, at Joint Base Charleston – Weapon Station (JB CHS-WS) Short Stay Recreational Area located on Lake Moultrie, Moncks Corner, South Carolina in accordance with all Federal, State, and local laws and regulations, latest editions of Air Force Instructions (AFI), manufacturer’s maintenance manuals or applicable industry standards. The plant was manufactered by Pro-Water Systems, Inc. The corresponding model number is C-30-HS, with a design flow of 30,000 GPD. This requirement includes operation and maintenance for the JB CHS-WS Short Stay WWTP, Water Distribution System, Waste Water Collection System, and RV Dump Station. The contractor shall maintain (i.e., perform preventative maintenance, repair systems, flush waterlines, water quality testing, etc.) and keep all systems specified in a constant state of operation, 24 hours a day/7 days a week. 

The Government is seeking responses from all qualified small businesses. Those wishing to identify their capability to provide their aforementioned services should respond to this announcement via email to jalen.williams.8@us.af.mil and taylor.mcdaniel.1@us.af.mil no later than Wednesday, 11 February 2026 at 5:00 PM Eastern Standard Time.  

Interested parties should provide the following information: 

(1) Company Name, Company Address, Point of Contact, Phone Number, Email Address, DUNS number, and CAGE Code. 

(2) Capability Statement and/or information you wish to provide about your business.   

(3) Three customer references to which your business has provided similar services. 

(4) Your small business size representation for NAICS 221320 – Sewage Treatment Facilities (e.g., is your business small or large? If small, is your business VOSB, SDVOSB, WOSB, EDWOSB, HUBZone, 8(a), etc.?). The Size Standard for NAICS 221320 is $35M. 

(5) Do you believe this acquisition should be assigned a different NAICS other than 221320 – Sewage Treatment Facilities? If so, which one? 

(6) Do you believe this acquisition should be assigned a different PSC other than S222 – Housekeeping—Waste Treatment/Storage? If so, which one? 

(7) What plant(s) by manufacturer type, and plant size(s) does your company’s operators have experience operating (e.g., small/large, and capacity by gallons)? 

(8) Does your company have any operators with a South Carolina Group B-B certification (or higher)? Please specify if operators are in-house or subcontracted personnel in your response. 

(9) Are there any additional certifications that your company requires personnel to obtain? 

(10) Does your company typically hire part-time or full-time personnel for performing similar or related services? 

(11) Does your company require operators to be present prior to and during laboratory sample collection? 

(12) What measures are taken by your company to ensure samples are not exceeding permit limits? 

(13) What equipment (e.g., tools) does your company use when performing WWTP services? 

(14) Has your company previously encountered noncompliance issues (e.g., NOV) with a permitted WWTP? If so, what measures (including a Plan of Action) did your company take to correct the issue(s)? 

Responses to this announcement shall be made via email to jalen.williams.8@us.af.mil and taylor.mcdaniel.1@us.af.mil no later than Wednesday, 11 February 2026 at 5:00 PM Eastern Standard Time. 

THIS REQUEST FOR INFORMATION OR "SOURCES SOUGHT" SHALL NOT BE CONSTRUED AS A REQUEST FOR PROPOSAL. INFORMATION IS TO BE PROVIDED ON A VOLUNTARY BASIS. NO ENTITLEMENT TO PAYMENT OF DIRECT OR INDIRECT COSTS OR CHARGES INCLUDING POSTAGE AND SHIPPING WILL ARISE AS A RESULT OF THE SUBMISSION OF INFORMATION. 

Files

File Type Posted
Atch-01 WWTP OM Services PWS dated 16 Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 3.pdf PDF
Atch-01 PWS Attachment 8.8.2. Digital Analyzer Certificate of Instrument Performance.pdf PDF
Atch-01 PWS Attachment 8.8.4. Digital Analyzer US – Field Service Report.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet.pdf PDF
Atch-01 PWS Attachment 8.4. Short Stay Fire Line and Hydrants Map.pdf PDF
Atch-01 PWS Attachment 8.6. Short Stay RV Dump Station Operation and Maintenance Manual.pdf PDF
Atch-01 PWS Attachment 8.8.3. Digital Analyzer Install Inspection.pdf PDF
Atch-01 PWS Attachment 8.8.7. pH ORP Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.1. Short NPDES Stay Permit Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.2. Short Stay Wastewater Treatment Plant Layout As-builts.pdf PDF
Atch-01 PWS Attachment 8.3. Short Stay Wastewater Treatment Plant Site Layout Drawings and Photos.pdf PDF
Atch-01 PWS Attachment 8.5. Short Stay Water Distribution Map.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 1.pdf PDF
Atch-01 PWS Attachment 8.8.5. LDO Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.8.6. Output Module Manual.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 2.pdf PDF
Atch-01 PWS Attachment 8.8.1. Analyzer Controller Manual.pdf PDF
Show all 18

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors