This is an inspection and acceptance report for a wastewater treatment plant (WWTP) analyzer installation project at JB Charleston-FEM, completed on May 1, 2025. The work achieved 100% completion (8.0/8.0 rating) with all system components tested, installed, and accepted as of May 2, 2025.

The project deliverables included eight key components: (1) a NEMA Type 4x enclosure with 1 each ADD unit featuring 3'x3'x12" deep design with support rack for coastal environmental protection and integration with existing electrical systems; (2) one CL17sc Colorimetric Chlorine Analyzer (Part Number B572800); (3) two SC4500 Digital Controllers with Claros-enabled outputs and 100-240 VAC capability; (4) one Hach LD0 sc Model 2 Dissolved Oxygen Probe with Luminescent Oxygen Technology; (5) one Differential pH and ORP Sensor with digital pH sensor featuring glass differential electrode and PEEK compatibility; (6) six-month supply of reagents and consumables for the chlorine analyzer; (7) one-year Warranty Plus Service from Hach; and (8) airline diffuser re-routing for the dechlorination chamber using stainless-steel materials with detailed specifications for line installation depth and fine bubble diffuser configuration. Personnel on-site for inspection included Curtis Evans (CEI), Arkie Freeman (operator), Joe Pilcher (K&K), Devin Corley (Trane), Cindy Hodson (CEO), a Hach technician, and Corey Wolf (CEO). Training was completed and work was inspected and accepted, with a contractor-identified leak in the enclosure subsequently sealed before final completion.

View the file

Other files

File Type Posted
Atch-01 PWS Attachment 8.8.4. Digital Analyzer US – Field Service Report.pdf PDF
Atch-01 WWTP OM Services PWS dated 16 Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 2.pdf PDF
Atch-01 PWS Attachment 8.1. Short NPDES Stay Permit Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.3. Short Stay Wastewater Treatment Plant Site Layout Drawings and Photos.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 1.pdf PDF
Atch-01 PWS Attachment 8.2. Short Stay Wastewater Treatment Plant Layout As-builts.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 3.pdf PDF
Atch-01 PWS Attachment 8.8.2. Digital Analyzer Certificate of Instrument Performance.pdf PDF
Atch-01 PWS Attachment 8.8.7. pH ORP Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.8.6. Output Module Manual.pdf PDF
Atch-01 PWS Attachment 8.8.5. LDO Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.5. Short Stay Water Distribution Map.pdf PDF
Atch-01 PWS Attachment 8.6. Short Stay RV Dump Station Operation and Maintenance Manual.pdf PDF
Atch-01 PWS Attachment 8.4. Short Stay Fire Line and Hydrants Map.pdf PDF
Atch-01 PWS Attachment 8.8.1. Analyzer Controller Manual.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .