Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 3.pdf

PDF 64 MB Posted

Attached to
JBCHS - Wastewater Treatment Operation and Maintenance
Solicitation number
Joint-Base-Charleston_WastewaterTreatmentPlant(2)
Issued by

About this file

This is a Performance Work Statement (PWS) attachment providing an operation and maintenance manual for a wastewater treatment facility. The document serves as a technical reference guide for the Short Stay Wastewater Treatment Facility at Joint Base Charleston-Weapon Station, supporting the broader requirement to operate and maintain a Pro-Water Systems C-30-HS model treatment plant designed for 30,000 gallons per day capacity located in Moncks Corner, South Carolina on Lake Moultrie.

The manual provides detailed operational procedures, maintenance schedules, and technical specifications necessary for 24/7 operation of the wastewater treatment plant, water distribution system, wastewater collection system, and RV dump station. The contractor must maintain all systems in constant operational status in accordance with Federal, State, and local regulations, Air Force Instructions, manufacturer specifications, and applicable industry standards. The manual serves as the primary technical reference document that the selected contractor will use to execute preventative maintenance, repairs, water quality testing, system flushing, and all other operational requirements to ensure continuous facility functionality.

View the file

Other files

File Type Posted
Atch-01 PWS Attachment 8.8.4. Digital Analyzer US – Field Service Report.pdf PDF
Atch-01 WWTP OM Services PWS dated 16 Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 2.pdf PDF
Atch-01 PWS Attachment 8.1. Short NPDES Stay Permit Jan 2026.pdf PDF
Atch-01 PWS Attachment 8.3. Short Stay Wastewater Treatment Plant Site Layout Drawings and Photos.pdf PDF
Atch-01 PWS Attachment 8.8.3. Digital Analyzer Install Inspection.pdf PDF
Atch-01 PWS Attachment 8.9. Short Stay Wastewater Treatment Plant PMI Spreadsheet.pdf PDF
Atch-01 PWS Attachment 8.7. Short Stay Wastewater Treatment Facility O&M Manual Book 1.pdf PDF
Atch-01 PWS Attachment 8.2. Short Stay Wastewater Treatment Plant Layout As-builts.pdf PDF
Atch-01 PWS Attachment 8.8.2. Digital Analyzer Certificate of Instrument Performance.pdf PDF
Atch-01 PWS Attachment 8.8.7. pH ORP Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.8.6. Output Module Manual.pdf PDF
Atch-01 PWS Attachment 8.8.5. LDO Sensor Manual.pdf PDF
Atch-01 PWS Attachment 8.5. Short Stay Water Distribution Map.pdf PDF
Atch-01 PWS Attachment 8.6. Short Stay RV Dump Station Operation and Maintenance Manual.pdf PDF
Atch-01 PWS Attachment 8.4. Short Stay Fire Line and Hydrants Map.pdf PDF
Atch-01 PWS Attachment 8.8.1. Analyzer Controller Manual.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .